foratvise
Get Started
Equipment failure (breakdowns)

Unplanned corrective maintenance stop

In short

It appears in about 1 of every 100 lines studied.

When it appears, it takes on average about 58 % of the line's lost time. Reported by 1 of the 112 studies that could observe it (sparse evidence).

What happens

A component on the packing line degrades or fails unexpectedly outside of any planned maintenance window, forcing the line to stop so that technicians can diagnose and repair the fault. Because the intervention was not scheduled, it interrupts normal production flow and requires maintenance personnel rather than routine operator action.

What is done about it

Strengthen condition-based and preventive maintenance programs with regular inspection, lubrication and component replacement scheduled before failure occurs, and use CMMS/SCADA alarm history to identify recurring failure modes for targeted reliability improvements. Maintain critical spare parts inventory and cross-train technicians to reduce mean time to repair when an unplanned stop still happens.

Practical guidance written from engineering knowledge; it is not a statistical estimate.

1Probability and evidence

Pooled over all segments. A wide interval is a result: it states how much the evidence allows us to know.
Probability of presence
0.6% [0.1–1.6%]
Expected share of lost time
0.3% [0.1–1.0%]
Share of lost time when present
58% [46–68%]
Studies / units
112 / 155
Evidence grade
D

Grade D: 0 or 1 study; the estimate is driven by partial pooling and priors, and the wide interval is the result.

2Probability by segment

Partially pooled estimates for each industry segment.
  • Dairy products
    0.7% [0.1–2.6%]14 studies
  • Soft drinks, bottled water and juices
    0.6% [0.1–2.0%]33 studies
  • Brewing, wine and spirits
    0.6% [0.1–2.4%]14 studies
  • Bakery and pasta
    0.7% [0.1–2.7%]6 studies
  • Meat, poultry and seafood
    0.7% [0.1–2.7%]6 studies
  • Fruit and vegetable processing
    0.7% [0.1–2.7%]4 studies
  • Grain and oilseed milling
    1.0% [0.1–3.8%]4 studies
  • Sugar and confectionery
    0.7% [0.1–2.7%]4 studies
  • Snacks, coffee, tea and other foods
    0.7% [0.1–2.4%]8 studies
  • Animal feed and pet food
    0.7% [0.1–2.7%]5 studies
  • Food manufacturing (unspecified or mixed)
    0.7% [0.1–2.4%]14 studies

3Mechanism, SCADA signature and countermeasure

Engineering guidance that helps recognise and address the cause; it is not part of the statistical estimate.

Mechanism

Engineering guidance

A component on the packing line degrades or fails unexpectedly outside of any planned maintenance window, forcing the line to stop so that technicians can diagnose and repair the fault. Because the intervention was not scheduled, it interrupts normal production flow and requires maintenance personnel rather than routine operator action.

How it looks in SCADA data

Engineering guidance

SCADA/MES logs a machine-state transition to fault or stopped with a maintenance work order opened outside the preventive maintenance calendar, typically with stop durations long enough to trigger the equipment-failure threshold. Upstream buffers fill and downstream stations starve while the repair is underway, and the stop reason code is tagged as corrective or breakdown maintenance rather than changeover or minor stop.

Countermeasure

Engineering guidance

Strengthen condition-based and preventive maintenance programs with regular inspection, lubrication and component replacement scheduled before failure occurs, and use CMMS/SCADA alarm history to identify recurring failure modes for targeted reliability improvements. Maintain critical spare parts inventory and cross-train technicians to reduce mean time to repair when an unplanned stop still happens.

4Sources

Every extracted datum with its study, value and verbatim quote.
  1. Share of lost time: 58.0 % · as reported: “non-scheduled maintenance”
    Show verbatim quote
    Major Availability losses were categorized as: non-scheduled maintenance (29,010 min. - 58% of Availability losses); packaging failure (11,079 min. - 22%); lack of demand that are downstream losses (8,260 min. - 13%) and; lack of product input to the packing line (952 min. – 2%).
  2. Lost time: 29,010 min · as reported: “non-scheduled maintenance”
    Show verbatim quote
    Major Availability losses were categorized as: non-scheduled maintenance (29,010 min. - 58% of Availability losses); packaging failure (11,079 min. - 22%); lack of demand that are downstream losses (8,260 min. - 13%) and; lack of product input to the packing line (952 min. – 2%).