Use of packing equipment efficiency as an estimate of the overall plant effectiveness and as a tool to improve financial results of a food-processing unit
1Bibliographic record
- Authors
- Jose Boaventura Rodrigues, Antonio Carlos Dantas Cabral
- Year
- 2017
- Venue
- Brazilian journal of food technology/Brazilian Journal of Food Technology
- Country
- Brazil
- Segment
- Grain and oilseed milling
- Process family
- Filling and packaging line
- Study type
- Single case study
- Extraction scope
- Full text
- Size
- 1 plants · 1 lines · — machines
- Observation period
- 88 days
- Data collection
- manual_logs
- Intervention
Show the setting as described by the study
a case study was conducted by collecting data from the packing unit along a four-month period in a soy processing plant located in Brazil.
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 12Moderate risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product or sector is given but the equipment or process is only partly described. | 1 / 2 |
| Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events). | 2 / 2 |
| How were loss data collected?Manual logs or maintenance records with unknown completeness. | 1 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?Formulae or definitions are given for the reported metrics, including what counts as planned time. | 2 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?The reported causes or categories sum to at least 90% of the stated total, or an explicit "other" class closes the balance. | 2 / 2 |
| Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method. | 2 / 2 |
| Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked. | 1 / 2 |
| Could conflicts of interest or the source of the data bias the result?Authors are employees of the plant or of an equipment/software vendor; no declaration. | 1 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
automation failurespacking equipmentShow verbatim quote (Section 3.1, Figure 9)A deeper analysis of non-scheduled maintenance data (Figure 9) shows that major causes of packing equipment failure are related to: electrical failures (26%), unscheduled operational (26%) or mechanical (23%) adjustments, worn parts or equipment breakdown (13%) and automation failures (6%). | Equipment failure (breakdowns) | Share of lost time | 6.00 % | Both extractors agreed |
worn parts or equipment breakdownpacking equipmentShow verbatim quote (Section 3.1, Figure 9)A deeper analysis of non-scheduled maintenance data (Figure 9) shows that major causes of packing equipment failure are related to: electrical failures (26%), unscheduled operational (26%) or mechanical (23%) adjustments, worn parts or equipment breakdown (13%) and automation failures (6%). | Equipment failure (breakdowns) | Share of lost time | 13.0 % | Both extractors agreed |
mechanical adjustmentspacking equipmentShow verbatim quote (Section 3.1, Figure 9)A deeper analysis of non-scheduled maintenance data (Figure 9) shows that major causes of packing equipment failure are related to: electrical failures (26%), unscheduled operational (26%) or mechanical (23%) adjustments, worn parts or equipment breakdown (13%) and automation failures (6%). | Equipment failure (breakdowns) | Share of lost time | 23.0 % | Adjudicated |
unscheduled operational adjustmentspacking equipmentShow verbatim quote (Section 3.1, Figure 9)A deeper analysis of non-scheduled maintenance data (Figure 9) shows that major causes of packing equipment failure are related to: electrical failures (26%), unscheduled operational (26%) or mechanical (23%) adjustments, worn parts or equipment breakdown (13%) and automation failures (6%). | Equipment failure (breakdowns) | Share of lost time | 26.0 % | Adjudicated |
electrical failurespacking equipmentShow verbatim quote (Section 3.1, Figure 9)A deeper analysis of non-scheduled maintenance data (Figure 9) shows that major causes of packing equipment failure are related to: electrical failures (26%), unscheduled operational (26%) or mechanical (23%) adjustments, worn parts or equipment breakdown (13%) and automation failures (6%). | Equipment failure (breakdowns) | Share of lost time | 26.0 % | Both extractors agreed |
lack of product input to the packing line (upstream losses)packing lineShow verbatim quote (Section 3.1, Figure 8)Major Availability losses were categorized as: non-scheduled maintenance (29,010 min. - 58% of Availability losses); packaging failure (11,079 min. - 22%); lack of demand that are downstream losses (8,260 min. - 13%) and; lack of product input to the packing line (952 min. – 2%). | Organizational or external stops (material or personnel shortage, utilities outage) | Share of lost time | 2.00 % | Adjudicated |
lack of product input to the packing line (upstream losses)packing lineShow verbatim quote (Section 3.1, Figure 8)Major Availability losses were categorized as: non-scheduled maintenance (29,010 min. - 58% of Availability losses); packaging failure (11,079 min. - 22%); lack of demand that are downstream losses (8,260 min. - 13%) and; lack of product input to the packing line (952 min. – 2%). | Organizational or external stops (material or personnel shortage, utilities outage) | Lost time | 952 min | Adjudicated |
lack of demand (downstream losses)packing lineShow verbatim quote (Section 3.1, Figure 8)Major Availability losses were categorized as: non-scheduled maintenance (29,010 min. - 58% of Availability losses); packaging failure (11,079 min. - 22%); lack of demand that are downstream losses (8,260 min. - 13%) and; lack of product input to the packing line (952 min. – 2%). | Planned downtime (scheduled maintenance, breaks, no demand) | Share of lost time | 13.0 % | Adjudicated |
lack of demand (downstream losses)packing lineShow verbatim quote (Section 3.1, Figure 8)Major Availability losses were categorized as: non-scheduled maintenance (29,010 min. - 58% of Availability losses); packaging failure (11,079 min. - 22%); lack of demand that are downstream losses (8,260 min. - 13%) and; lack of product input to the packing line (952 min. – 2%). | Planned downtime (scheduled maintenance, breaks, no demand) | Lost time | 8,260 min | Adjudicated |
packaging failurepacking lineShow verbatim quote (Section 3.1, Figure 8)Major Availability losses were categorized as: non-scheduled maintenance (29,010 min. - 58% of Availability losses); packaging failure (11,079 min. - 22%); lack of demand that are downstream losses (8,260 min. - 13%) and; lack of product input to the packing line (952 min. – 2%). | Idling and minor stops (micro-stops) | Share of lost time | 22.0 % | Adjudicated |
packaging failurepacking lineShow verbatim quote (Section 3.1, Figure 8)Major Availability losses were categorized as: non-scheduled maintenance (29,010 min. - 58% of Availability losses); packaging failure (11,079 min. - 22%); lack of demand that are downstream losses (8,260 min. - 13%) and; lack of product input to the packing line (952 min. – 2%). | Idling and minor stops (micro-stops) | Lost time | 11,079 min | Adjudicated |
non-scheduled maintenancepacking lineShow verbatim quote (Section 3.1, Figure 8)Major Availability losses were categorized as: non-scheduled maintenance (29,010 min. - 58% of Availability losses); packaging failure (11,079 min. - 22%); lack of demand that are downstream losses (8,260 min. - 13%) and; lack of product input to the packing line (952 min. – 2%). | Equipment failure (breakdowns) | Share of lost time | 58.0 % | Both extractors agreed |
non-scheduled maintenancepacking lineShow verbatim quote (Section 3.1, Figure 8)Major Availability losses were categorized as: non-scheduled maintenance (29,010 min. - 58% of Availability losses); packaging failure (11,079 min. - 22%); lack of demand that are downstream losses (8,260 min. - 13%) and; lack of product input to the packing line (952 min. – 2%). | Equipment failure (breakdowns) | Lost time | 29,010 min | Both extractors agreed |
—packing lineShow verbatim quote (Section 3.1 Results and discussion)Based on the expected improvement (existing OEE of 53.9% versus OEE of 74.1% for the proposed scenario) it is possible to estimate the financial benefit possibly achieved after the improvement plan is implemented. | none | OEE | 53.9 % | Both extractors agreed |
Observation units
- Packing line · Packaging (forming, sealing, wrapping, case packing, palletizing) · Baseline