Use of packing equipment efficiency as an estimate of the overall plant effectiveness and as a tool to improve financial results of a food-processing unit

Open source

1Bibliographic record

Authors
Jose Boaventura Rodrigues, Antonio Carlos Dantas Cabral
Year
2017
Venue
Brazilian journal of food technology/Brazilian Journal of Food Technology
Country
Brazil
Segment
Grain and oilseed milling
Process family
Filling and packaging line
Study type
Single case study
Extraction scope
Full text
Size
1 plants · 1 lines · — machines
Observation period
88 days
Data collection
manual_logs
Intervention
Show the setting as described by the study
a case study was conducted by collecting data from the packing unit along a four-month period in a soy processing plant located in Brazil.

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 12Moderate risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product or sector is given but the equipment or process is only partly described.1 / 2
Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events).2 / 2
How were loss data collected?Manual logs or maintenance records with unknown completeness.1 / 2
Are OEE, loading time and the loss categories defined explicitly?Formulae or definitions are given for the reported metrics, including what counts as planned time.2 / 2
Does the loss breakdown account for the total loss it claims to explain?The reported causes or categories sum to at least 90% of the stated total, or an explicit "other" class closes the balance.2 / 2
Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method.2 / 2
Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked.1 / 2
Could conflicts of interest or the source of the data bias the result?Authors are employees of the plant or of an equipment/software vendor; no declaration.1 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
automation failurespacking equipment
Show verbatim quote (Section 3.1, Figure 9)
A deeper analysis of non-scheduled maintenance data (Figure 9) shows that major causes of packing equipment failure are related to: electrical failures (26%), unscheduled operational (26%) or mechanical (23%) adjustments, worn parts or equipment breakdown (13%) and automation failures (6%).
Equipment failure (breakdowns)Share of lost time6.00 %Both extractors agreed
worn parts or equipment breakdownpacking equipment
Show verbatim quote (Section 3.1, Figure 9)
A deeper analysis of non-scheduled maintenance data (Figure 9) shows that major causes of packing equipment failure are related to: electrical failures (26%), unscheduled operational (26%) or mechanical (23%) adjustments, worn parts or equipment breakdown (13%) and automation failures (6%).
Equipment failure (breakdowns)Share of lost time13.0 %Both extractors agreed
mechanical adjustmentspacking equipment
Show verbatim quote (Section 3.1, Figure 9)
A deeper analysis of non-scheduled maintenance data (Figure 9) shows that major causes of packing equipment failure are related to: electrical failures (26%), unscheduled operational (26%) or mechanical (23%) adjustments, worn parts or equipment breakdown (13%) and automation failures (6%).
Equipment failure (breakdowns)Share of lost time23.0 %Adjudicated
unscheduled operational adjustmentspacking equipment
Show verbatim quote (Section 3.1, Figure 9)
A deeper analysis of non-scheduled maintenance data (Figure 9) shows that major causes of packing equipment failure are related to: electrical failures (26%), unscheduled operational (26%) or mechanical (23%) adjustments, worn parts or equipment breakdown (13%) and automation failures (6%).
Equipment failure (breakdowns)Share of lost time26.0 %Adjudicated
electrical failurespacking equipment
Show verbatim quote (Section 3.1, Figure 9)
A deeper analysis of non-scheduled maintenance data (Figure 9) shows that major causes of packing equipment failure are related to: electrical failures (26%), unscheduled operational (26%) or mechanical (23%) adjustments, worn parts or equipment breakdown (13%) and automation failures (6%).
Equipment failure (breakdowns)Share of lost time26.0 %Both extractors agreed
lack of product input to the packing line (upstream losses)packing line
Show verbatim quote (Section 3.1, Figure 8)
Major Availability losses were categorized as: non-scheduled maintenance (29,010 min. - 58% of Availability losses); packaging failure (11,079 min. - 22%); lack of demand that are downstream losses (8,260 min. - 13%) and; lack of product input to the packing line (952 min. – 2%).
Organizational or external stops (material or personnel shortage, utilities outage)Share of lost time2.00 %Adjudicated
lack of product input to the packing line (upstream losses)packing line
Show verbatim quote (Section 3.1, Figure 8)
Major Availability losses were categorized as: non-scheduled maintenance (29,010 min. - 58% of Availability losses); packaging failure (11,079 min. - 22%); lack of demand that are downstream losses (8,260 min. - 13%) and; lack of product input to the packing line (952 min. – 2%).
Organizational or external stops (material or personnel shortage, utilities outage)Lost time952 minAdjudicated
lack of demand (downstream losses)packing line
Show verbatim quote (Section 3.1, Figure 8)
Major Availability losses were categorized as: non-scheduled maintenance (29,010 min. - 58% of Availability losses); packaging failure (11,079 min. - 22%); lack of demand that are downstream losses (8,260 min. - 13%) and; lack of product input to the packing line (952 min. – 2%).
Planned downtime (scheduled maintenance, breaks, no demand)Share of lost time13.0 %Adjudicated
lack of demand (downstream losses)packing line
Show verbatim quote (Section 3.1, Figure 8)
Major Availability losses were categorized as: non-scheduled maintenance (29,010 min. - 58% of Availability losses); packaging failure (11,079 min. - 22%); lack of demand that are downstream losses (8,260 min. - 13%) and; lack of product input to the packing line (952 min. – 2%).
Planned downtime (scheduled maintenance, breaks, no demand)Lost time8,260 minAdjudicated
packaging failurepacking line
Show verbatim quote (Section 3.1, Figure 8)
Major Availability losses were categorized as: non-scheduled maintenance (29,010 min. - 58% of Availability losses); packaging failure (11,079 min. - 22%); lack of demand that are downstream losses (8,260 min. - 13%) and; lack of product input to the packing line (952 min. – 2%).
Idling and minor stops (micro-stops)Share of lost time22.0 %Adjudicated
packaging failurepacking line
Show verbatim quote (Section 3.1, Figure 8)
Major Availability losses were categorized as: non-scheduled maintenance (29,010 min. - 58% of Availability losses); packaging failure (11,079 min. - 22%); lack of demand that are downstream losses (8,260 min. - 13%) and; lack of product input to the packing line (952 min. – 2%).
Idling and minor stops (micro-stops)Lost time11,079 minAdjudicated
non-scheduled maintenancepacking line
Show verbatim quote (Section 3.1, Figure 8)
Major Availability losses were categorized as: non-scheduled maintenance (29,010 min. - 58% of Availability losses); packaging failure (11,079 min. - 22%); lack of demand that are downstream losses (8,260 min. - 13%) and; lack of product input to the packing line (952 min. – 2%).
Equipment failure (breakdowns)Share of lost time58.0 %Both extractors agreed
non-scheduled maintenancepacking line
Show verbatim quote (Section 3.1, Figure 8)
Major Availability losses were categorized as: non-scheduled maintenance (29,010 min. - 58% of Availability losses); packaging failure (11,079 min. - 22%); lack of demand that are downstream losses (8,260 min. - 13%) and; lack of product input to the packing line (952 min. – 2%).
Equipment failure (breakdowns)Lost time29,010 minBoth extractors agreed
—packing line
Show verbatim quote (Section 3.1 Results and discussion)
Based on the expected improvement (existing OEE of 53.9% versus OEE of 74.1% for the proposed scenario) it is possible to estimate the financial benefit possibly achieved after the improvement plan is implemented.
noneOEE53.9 %Both extractors agreed

Observation units

  • Packing line · Packaging (forming, sealing, wrapping, case packing, palletizing) · Baseline