In short

It appears in about 1 of every 100 lines studied.

When it appears, it takes on average about 56 % of the line's lost time. Reported by 2 of the 127 studies that could observe it (limited evidence).

What happens

The line is starved because a support activity located upstream of the process (washing of containers/trays, batch formulation, feeding of raw materials onto the line, or receipt of external deliveries) does not deliver its output in time. The stoppage does not originate in the line equipment itself but in the scheduling or execution of an upstream task on which the line depends.

What is done about it

Synchronize the schedule of the upstream support process with the production plan of the line, add buffer stock or intermediate storage of washed containers, formulated batches or incoming materials, and set up early warning or kanban signals so the upstream area anticipates the line's demand and deliveries are coordinated in advance.

Practical guidance written from engineering knowledge; it is not a statistical estimate.

1Probability and evidence

Pooled over all segments. A wide interval is a result: it states how much the evidence allows us to know.
Probability of presence
0.8% [0.2–1.9%]
Expected share of lost time
0.4% [0.1–1.1%]
Share of lost time when present
56% [45–66%]
Studies / units
127 / 161
Evidence grade
C

Grade C: 2 to 4 studies, or an interval wider than 0.35.

2Probability by segment

Partially pooled estimates for each industry segment.
  • Dairy products
    0.9% [0.1–2.9%]13 studies
  • Soft drinks, bottled water and juices
    0.8% [0.1–2.5%]26 studies
  • Brewing, wine and spirits
    0.8% [0.1–2.8%]11 studies
  • Bakery and pasta
    1.1% [0.2–3.4%]24 studies
  • Meat, poultry and seafood
    0.9% [0.1–3.0%]9 studies
  • Fruit and vegetable processing
    0.9% [0.1–2.9%]7 studies
  • Grain and oilseed milling
    0.9% [0.1–3.3%]6 studies
  • Sugar and confectionery
    0.9% [0.1–3.0%]9 studies
  • Snacks, coffee, tea and other foods
    0.9% [0.1–3.1%]5 studies
  • Animal feed and pet food
    0.9% [0.1–3.0%]7 studies
  • Food manufacturing (unspecified or mixed)
    1.3% [0.2–4.4%]10 studies

3Mechanism, SCADA signature and countermeasure

Engineering guidance that helps recognise and address the cause; it is not part of the statistical estimate.

Mechanism

Engineering guidance

The line is starved because a support activity located upstream of the process (washing of containers/trays, batch formulation, feeding of raw materials onto the line, or receipt of external deliveries) does not deliver its output in time. The stoppage does not originate in the line equipment itself but in the scheduling or execution of an upstream task on which the line depends.

How it looks in SCADA data

Engineering guidance

Line or station shows an extended idle/waiting state with no equipment fault code active, often logged as waiting for material or waiting for input; counters for infeed accumulation drop to zero while the rest of the line remains available, and the event correlates in time with records or logs of the upstream washing, formulation or logistics area rather than with any machine alarm.

Countermeasure

Engineering guidance

Synchronize the schedule of the upstream support process with the production plan of the line, add buffer stock or intermediate storage of washed containers, formulated batches or incoming materials, and set up early warning or kanban signals so the upstream area anticipates the line's demand and deliveries are coordinated in advance.

4Sources

Every extracted datum with its study, value and verbatim quote.
  1. Lost time: 5.00 h · as reported: “Demora en formulación”
    Show verbatim quote
    Demora en formulación 5 980 0.5% 99.7%
  2. Share of lost time: 0.500 % · as reported: “Demora en formulación”
    Show verbatim quote
    Demora en formulación 5 980 0.5% 99.7%
  3. Lost time: 54.1 h · as reported: “Demora en el lavado de bandejas”
    Show verbatim quote
    Demora en el lavado de bandejas 54.09 53%
  4. Share of lost time: 53.0 % · as reported: “Demora en el lavado de bandejas”
    Show verbatim quote
    Demora en el lavado de bandejas 54.09 53%
  5. Lost time: 14.4 h · as reported: “Demora en el lavado de bandejas”
    Show verbatim quote
    se concluye que el tiempo de parada por la demora en el lavado de bandejas representa el 53% del total de horas del motivo 3 y presentó su máximo de horas de paradas en el enero del 2023, con 14.4 horas.
  6. Lost time: 17.0 h · as reported: “Demora en la alimentación de la línea”
    Show verbatim quote
    Demora en la alimentación de la línea 16.97 16%
  7. Share of lost time: 16.0 % · as reported: “Demora en la alimentación de la línea”
    Show verbatim quote
    Demora en la alimentación de la línea 16.97 16%
  8. Share of loss events: 34.0 % · as reported: “Demora en Entregas”
    Show verbatim quote
    En los primeros 9 meses del año 2022 se registró un total de 167 incidencias en todo el proceso de producción, ocasionando un 34% en demoras en las entregas finales a los clientes y un 66% en retrasos de procesos.