1Bibliographic record
- Authors
- Noe Romani Quillca, John Junior Rupay Espino, Lucerito Katherine Ortiz García
- Year
- 2025
- Venue
- Proceedings of the LACCEI international multi-conference for engineering, education and technology
- Country
- Peru
- Segment
- Dairy products
- Process family
- Filling and packaging line
- Study type
- Before/after intervention
- Extraction scope
- Full text
- Size
- 1 plants · 1 lines · — machines
- Observation period
- 730 days
- Data collection
- manual_logs
- Intervention
Show the setting as described by the study
the 946 ml Edge packaging line of Laive S.A., Lima, during 2024.
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 14Low risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product or sector is given but the equipment or process is only partly described. | 1 / 2 |
| Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events). | 2 / 2 |
| How were loss data collected?Manual logs or maintenance records with unknown completeness. | 1 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?Formulae or definitions are given for the reported metrics, including what counts as planned time. | 2 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?The reported causes or categories sum to at least 90% of the stated total, or an explicit "other" class closes the balance. | 2 / 2 |
| Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method. | 2 / 2 |
| Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points. | 2 / 2 |
| Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result. | 2 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
—Show verbatim quote (Results section)El desempeño inicial de la línea durante 2023 mostró un OEE promedio del 49%, con una Disponibilidad de 49.5%, un Rendimiento de 99.4% y una Calidad de 99.5% | none | Quality | 99.5 % | Both extractors agreed |
—Show verbatim quote (Results section)El desempeño inicial de la línea durante 2023 mostró un OEE promedio del 49%, con una Disponibilidad de 49.5%, un Rendimiento de 99.4% y una Calidad de 99.5% | none | Performance | 99.4 % | Both extractors agreed |
—Show verbatim quote (Results section)El desempeño inicial de la línea durante 2023 mostró un OEE promedio del 49%, con una Disponibilidad de 49.5%, un Rendimiento de 99.4% y una Calidad de 99.5% | none | Availability | 49.5 % | Both extractors agreed |
—Show verbatim quote (Results section)El desempeño inicial de la línea durante 2023 mostró un OEE promedio del 49%, con una Disponibilidad de 49.5%, un Rendimiento de 99.4% y una Calidad de 99.5% | none | OEE | 49.0 % | Both extractors agreed |
Demora en arranque de líneasShow verbatim quote (Table I)Demora en arranque de líneas 118 784 12.0% 79.7% | Setup and adjustments | Share of lost time | 12.0 % | Both extractors agreed |
Demora en arranque de líneasShow verbatim quote (Table I)Demora en arranque de líneas 118 784 12.0% 79.7% | Setup and adjustments | Lost time | 118 h | Both extractors agreed |
—Show verbatim quote (Table IV)Disponibilidad 49.5% 56.7% 7.2% | none | Availability | 56.7 % | Both extractors agreed |
—Show verbatim quote (Table IV)Rendimiento 99.4% 99.7% 0.3% | none | Performance | 99.7 % | Both extractors agreed |
—Show verbatim quote (Table IV)Calidad 99.5% 99.8% 0.3% | none | Quality | 99.8 % | Both extractors agreed |
Falla de máquinaShow verbatim quote (Table I)Falla de máquina 666 666 67.7% 67.7% | Equipment failure (breakdowns) | Lost time | 666 h | Single extractor |
Falla de máquinaShow verbatim quote (Table I)Falla de máquina 666 666 67.7% 67.7% | Equipment failure (breakdowns) | Share of lost time | 67.7 % | Single extractor |
Fallo OperacionalShow verbatim quote (Table I)Fallo Operacional 69 852 7.0% 86.7% | Not classifiable from the report | Lost time | 69.0 h | Single extractor |
Fallo OperacionalShow verbatim quote (Table I)Fallo Operacional 69 852 7.0% 86.7% | Not classifiable from the report | Share of lost time | 7.00 % | Single extractor |
Demora en cruce de líneasShow verbatim quote (Table I)Demora en cruce de líneas 49 902 5.0% 91.7% | Setup and adjustments | Lost time | 49.0 h | Single extractor |
Demora en cruce de líneasShow verbatim quote (Table I)Demora en cruce de líneas 49 902 5.0% 91.7% | Setup and adjustments | Share of lost time | 5.00 % | Single extractor |
Falta de personalShow verbatim quote (Table I)Falta de personal 20 921 2.0% 93.7% | Organizational or external stops (material or personnel shortage, utilities outage) | Lost time | 20.0 h | Single extractor |
Falta de personalShow verbatim quote (Table I)Falta de personal 20 921 2.0% 93.7% | Organizational or external stops (material or personnel shortage, utilities outage) | Share of lost time | 2.00 % | Single extractor |
Falta de materia primaShow verbatim quote (Table I)Falta de materia prima 20 941 2.0% 95.7% | Organizational or external stops (material or personnel shortage, utilities outage) | Lost time | 20.0 h | Single extractor |
Falta de materia primaShow verbatim quote (Table I)Falta de materia prima 20 941 2.0% 95.7% | Organizational or external stops (material or personnel shortage, utilities outage) | Share of lost time | 2.00 % | Single extractor |
Notificaciones tardíasShow verbatim quote (Table I)Notificaciones tardías 10 951 1.0% 96.7% | Organizational or external stops (material or personnel shortage, utilities outage) | Lost time | 10.0 h | Single extractor |
Notificaciones tardíasShow verbatim quote (Table I)Notificaciones tardías 10 951 1.0% 96.7% | Organizational or external stops (material or personnel shortage, utilities outage) | Share of lost time | 1.00 % | Single extractor |
Falla de serviciosShow verbatim quote (Table I)Falla de servicios 10 961 1.0% 97.7% | Organizational or external stops (material or personnel shortage, utilities outage) | Lost time | 10.0 h | Single extractor |
Falla de serviciosShow verbatim quote (Table I)Falla de servicios 10 961 1.0% 97.7% | Organizational or external stops (material or personnel shortage, utilities outage) | Share of lost time | 1.00 % | Single extractor |
Falta de materialShow verbatim quote (Table I)Falta de material 10 970 1.0% 98.7% | Organizational or external stops (material or personnel shortage, utilities outage) | Lost time | 10.0 h | Single extractor |
Falta de materialShow verbatim quote (Table I)Falta de material 10 970 1.0% 98.7% | Organizational or external stops (material or personnel shortage, utilities outage) | Share of lost time | 1.00 % | Single extractor |
Falla de materialShow verbatim quote (Table I)Falla de material 5 975 0.5% 99.2% | Not classifiable from the report | Lost time | 5.00 h | Single extractor |
Falla de materialShow verbatim quote (Table I)Falla de material 5 975 0.5% 99.2% | Not classifiable from the report | Share of lost time | 0.500 % | Single extractor |
Demora en formulaciónShow verbatim quote (Table I)Demora en formulación 5 980 0.5% 99.7% | Organizational or external stops (material or personnel shortage, utilities outage) | Lost time | 5.00 h | Single extractor |
Demora en formulaciónShow verbatim quote (Table I)Demora en formulación 5 980 0.5% 99.7% | Organizational or external stops (material or personnel shortage, utilities outage) | Share of lost time | 0.500 % | Single extractor |
Problema de calidadShow verbatim quote (Table I)Problema de calidad 3 983 0.3% 100.0% | Process defects (scrap and rework) | Lost time | 3.00 h | Single extractor |
Problema de calidadShow verbatim quote (Table I)Problema de calidad 3 983 0.3% 100.0% | Process defects (scrap and rework) | Share of lost time | 0.300 % | Single extractor |
—Show verbatim quote (Table V)Ene 87 68 -19 | Not classifiable from the report | Lost time | 87.0 h | Single extractor |
—Show verbatim quote (Table V)Feb 58 41 -17 | Not classifiable from the report | Lost time | 58.0 h | Single extractor |
—Show verbatim quote (Table V)Mar 138 41 -97 | Not classifiable from the report | Lost time | 138 h | Single extractor |
—Show verbatim quote (Table V)Abr 93 51 -41 | Not classifiable from the report | Lost time | 93.0 h | Single extractor |
—Show verbatim quote (Table V)May 81 43 -38 | Not classifiable from the report | Lost time | 81.0 h | Single extractor |
—Show verbatim quote (Table V)Jun 98 60 -38 | Not classifiable from the report | Lost time | 98.0 h | Single extractor |
—Show verbatim quote (Table V)Jul 73 53 -21 | Not classifiable from the report | Lost time | 73.0 h | Single extractor |
—Show verbatim quote (Table V)Ago 92 51 -40 | Not classifiable from the report | Lost time | 92.0 h | Single extractor |
—Show verbatim quote (Table V)Set 35 51 16 | Not classifiable from the report | Lost time | 35.0 h | Single extractor |
—Show verbatim quote (Table V)Oct 86 68 -18 | Not classifiable from the report | Lost time | 86.0 h | Single extractor |
—Show verbatim quote (Table V)Nov 75 59 -16 | Not classifiable from the report | Lost time | 75.0 h | Single extractor |
—Show verbatim quote (Table V)Dic 68 32 -36 | Not classifiable from the report | Lost time | 68.0 h | Single extractor |
—Show verbatim quote (Table IV)OEE 49.0% 56.4% 7.4% | none | OEE | 56.4 % | Single extractor |
—Show verbatim quote (Table V)Ene 87 68 -19 | Not classifiable from the report | Lost time | 68.0 h | Single extractor |
—Show verbatim quote (Table V)Feb 58 41 -17 | Not classifiable from the report | Lost time | 41.0 h | Single extractor |
—Show verbatim quote (Table V)Abr 93 51 -41 | Not classifiable from the report | Lost time | 51.0 h | Single extractor |
—Show verbatim quote (Table V)May 81 43 -38 | Not classifiable from the report | Lost time | 43.0 h | Single extractor |
—Show verbatim quote (Table V)Jun 98 60 -38 | Not classifiable from the report | Lost time | 60.0 h | Single extractor |
—Show verbatim quote (Table V)Jul 73 53 -21 | Not classifiable from the report | Lost time | 53.0 h | Single extractor |
—Show verbatim quote (Table V)Nov 75 59 -16 | Not classifiable from the report | Lost time | 59.0 h | Single extractor |
—Show verbatim quote (Table V)Dic 68 32 -36 | Not classifiable from the report | Lost time | 32.0 h | Single extractor |
Observation units
- Edge line · Whole line or unspecified equipment · Baseline
- Edge line · Whole line or unspecified equipment · After intervention