WIP and packing material adjustment
In short
It appears in about 1 of every 100 lines studied.
When it appears, it takes on average about 56 % of the line's lost time. Reported by 1 of the 112 studies that could observe it (sparse evidence).
What happens
During a changeover the packaging line must be re-set to match a new work-in-progress batch or a different packing material (films, boxes, labels format), requiring loading, threading and fine-tuning of material handling and dosing elements before stable packs are produced. This adjustment work sits between the end of the previous run and the first good pack of the new run.
What is done about it
Standardize changeover sequences with pre-staged WIP and packing material kits, use quick-connect or cartridge-style material loading, and apply SMED principles to convert internal adjustment steps into external preparation performed while the line is still running the previous order.
Practical guidance written from engineering knowledge; it is not a statistical estimate.
1Probability and evidence
- Probability of presence
- 0.5% [0.1–1.4%]
- Expected share of lost time
- 0.3% [0.1–0.8%]
- Share of lost time when present
- 56% [44–66%]
- Studies / units
- 112 / 155
- Evidence grade
- D
Grade D: 0 or 1 study; the estimate is driven by partial pooling and priors, and the wide interval is the result.
2Probability by segment
- Dairy products0.6% [0.1–2.1%]14 studies
- Soft drinks, bottled water and juices0.5% [0.1–1.7%]33 studies
- Brewing, wine and spirits0.6% [0.1–2.2%]14 studies
- Bakery and pasta0.6% [0.1–2.4%]6 studies
- Meat, poultry and seafood0.6% [0.1–2.3%]6 studies
- Fruit and vegetable processing0.6% [0.1–2.4%]4 studies
- Grain and oilseed milling0.6% [0.1–2.2%]4 studies
- Sugar and confectionery0.6% [0.1–2.2%]4 studies
- Snacks, coffee, tea and other foods0.6% [0.1–2.2%]8 studies
- Animal feed and pet food0.6% [0.1–2.4%]5 studies
- Food manufacturing (unspecified or mixed)0.8% [0.1–3.1%]14 studies
3Mechanism, SCADA signature and countermeasure
Mechanism
Engineering guidanceDuring a changeover the packaging line must be re-set to match a new work-in-progress batch or a different packing material (films, boxes, labels format), requiring loading, threading and fine-tuning of material handling and dosing elements before stable packs are produced. This adjustment work sits between the end of the previous run and the first good pack of the new run.
How it looks in SCADA data
Engineering guidanceMES/SCADA shows an extended changeover or setup machine-state between two production orders, with low or zero throughput counters, frequent manual mode or jog activations, and no fault alarms, distinguishing it from a failure stop. Operator login events and material-load confirmations typically bracket the downtime window.
Countermeasure
Engineering guidanceStandardize changeover sequences with pre-staged WIP and packing material kits, use quick-connect or cartridge-style material loading, and apply SMED principles to convert internal adjustment steps into external preparation performed while the line is still running the previous order.
4Sources
- ANALISIS PERHITUNGAN OVERALL EQUIPMENT EFFECTIVENESS (OEE) PADA MESIN PACKING UNTUK MENINGKATKAN NILAI AVAILABILITY MESIN (2014)Open sourceLost time: 1,740 min · as reported: “Adjustment of WIP and packing material”
Show verbatim quote
Penyesuaian WIP dan Pack Material 1,740 71%