foratvise
Get Started
Included study

ANALISIS PERHITUNGAN OVERALL EQUIPMENT EFFECTIVENESS (OEE) PADA MESIN PACKING UNTUK MENINGKATKAN NILAI AVAILABILITY MESIN

Open source

1Bibliographic record

Authors
Ida Nursanti, Yoko Susanto
Year
2014
Venue
DOAJ (DOAJ: Directory of Open Access Journals)
Country
Indonesia
Segment
Food manufacturing (unspecified or mixed)
Process family
Filling and packaging line
Study type
Single case study
Extraction scope
Full text
Size
1 plants · 1 lines · 2 machines
Observation period
7 days
Data collection
manual_logs
Intervention
Show the setting as described by the study
PT. XYZ merupakan salah satu perusahaan makanan dan minuman besar di Indonesia yang memproduksi banyak jenis produk dengan beberapa ukuran packing yang berbeda juga.

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 13Low risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product or sector is given but the equipment or process is only partly described.1 / 2
Is the observation period long enough and reported?Period reported but shorter than 30 days, or only the number of shifts is given.1 / 2
How were loss data collected?Manual logs or maintenance records with unknown completeness.1 / 2
Are OEE, loading time and the loss categories defined explicitly?Formulae or definitions are given for the reported metrics, including what counts as planned time.2 / 2
Does the loss breakdown account for the total loss it claims to explain?The reported causes or categories sum to at least 90% of the stated total, or an explicit "other" class closes the balance.2 / 2
Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method.2 / 2
Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points.2 / 2
Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result.2 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
Breakdown
Show verbatim quote (Table 4. Faktor penyebab penurunan nilai Availability)
Breakdown 2,255 56%
Equipment failure (breakdowns)Lost time2,255 minBoth extractors agreed
Setup after breakdown
Show verbatim quote (Table 4. Faktor penyebab penurunan nilai Availability)
Setting setelah breakdown 1,498 100%
Setup and adjustmentsLost time1,498 minBoth extractors agreed
Adjustment of WIP and packing material
Show verbatim quote (Table 4. Faktor penyebab penurunan nilai Availability)
Penyesuaian WIP dan Pack Material 1,740 71%
Setup and adjustmentsLost time1,740 minBoth extractors agreed
Initial and end of shift setup
Show verbatim quote (Table 4. Faktor penyebab penurunan nilai Availability)
Setting awal dan akhir shift 3,908 35%
Setup and adjustmentsLost time3,908 minBoth extractors agreed
Waiting for WIP
Show verbatim quote (Table 4. Faktor penyebab penurunan nilai Availability)
Menunggu WIP 1680 86%
Organizational or external stops (material or personnel shortage, utilities outage)Lost time1,680 minBoth extractors agreed
—
Show verbatim quote (Table 2. Hasil perhitungan OEE 1 minggu)
Weighing 76.08%
noneOEE76.1 %Single extractor
—
Show verbatim quote (Table 2. Hasil perhitungan OEE 1 minggu)
SVB 77.46%
noneOEE77.5 %Single extractor

Observation units

  • Packing machines (Weighing & SVB, availability loss causes) · Packaging (forming, sealing, wrapping, case packing, palletizing) · Baseline
  • Weighing · Packaging (forming, sealing, wrapping, case packing, palletizing) · Baseline
  • SVB · Packaging (forming, sealing, wrapping, case packing, palletizing) · Baseline