1Bibliographic record
- Authors
- Buškevičiūtė, Jolita
- Year
- 2014
- Venue
- —
- DOI
- —
- Country
- —
- Segment
- Soft drinks, bottled water and juices
- Process family
- Filling and packaging line
- Study type
- Before/after intervention
- Extraction scope
- Abstract only
- Size
- 1 plants · 1 lines · — machines
- Observation period
- 1,460 days
- Data collection
- not_reported
- Intervention
Show the setting as described by the study
The quality management system, certified and installed ISO standarts of the soft drinks company 'X' are analysed in this research.
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 6High risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product or sector is given but the equipment or process is only partly described. | 1 / 2 |
| Is the observation period long enough and reported?Period reported but shorter than 30 days, or only the number of shifts is given. | 1 / 2 |
| How were loss data collected?Interviews, estimates, or method not reported. | 0 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?No definition; metrics are reported as bare numbers. | 0 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?Only selected causes are reported and the total is unknown. | 0 / 2 |
| Is there evidence of selective reporting of favourable results?Intervention study in which baseline and post-intervention periods differ in length or method. | 1 / 2 |
| Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked. | 1 / 2 |
| Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result. | 2 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
—Show verbatim quote (abstract)Line efficiency hit 68.9% in 2013 (only 47,18% in 2010) because of the quality management systems and ISO standards installed. | none | OEE | 47.2 % | Single extractor |
nonconforming productShow verbatim quote (abstract)This is reflected in the production of nonconforming product decrease from 19 cases (2010) to 3 (2013). | Process defects (scrap and rework) | Number of events | 19.0 cases | Single extractor |
—Show verbatim quote (abstract)Line efficiency hit 68.9% in 2013 (only 47,18% in 2010) because of the quality management systems and ISO standards installed. | none | OEE | 68.9 % | Single extractor |
—Show verbatim quote (abstract)Production quality index (QI) reached 100 percent in 2013 because of the working quality management system and continuous improvement processes during the year. | none | Quality | 100 % | Single extractor |
nonconforming productShow verbatim quote (abstract)This is reflected in the production of nonconforming product decrease from 19 cases (2010) to 3 (2013). | Process defects (scrap and rework) | Number of events | 3.00 cases | Single extractor |
CIP line washingShow verbatim quote (abstract)CIP line washing method allowed the company to save around 28 percent of the time and costs used for line washing. | Setup and adjustments | Share of lost time | 28.0 % | Single extractor |
nonconforming raw material (labels, blanks, raw film materials)Show verbatim quote (abstract)These nonconforming raw material accounts for 72% of all claims submitted to suppliers of raw materials. | Organizational or external stops (material or personnel shortage, utilities outage) | Share of loss events | 72.0 % | Single extractor |
Observation units
- Production line, soft drinks company 'X' · Whole line or unspecified equipment · Baseline
- Production line, soft drinks company 'X' · Whole line or unspecified equipment · After intervention