Applying Lean Manufacturing tools to minimize waste in a mass consumption food company

Open source

1Bibliographic record

Authors
Lagos, Maricielo, Luis, Katsuhiro Nishizawa, Ramos, Edgar
Year
2022
Venue
—
DOI
—
Country
Peru
Segment
Bakery and pasta
Process family
Forming, baking and cooking
Study type
Before/after intervention
Extraction scope
Full text
Size
1 plants · 1 lines · — machines
Observation period
—
Data collection
not_reported
Intervention
Show the setting as described by the study
For the case study, a line is chosen where 4 types of crackers or salty cookies are produced, which we will call cookies type A, type B, type C and type D.

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 10Moderate risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product or sector is given but the equipment or process is only partly described.1 / 2
Is the observation period long enough and reported?Period reported but shorter than 30 days, or only the number of shifts is given.1 / 2
How were loss data collected?Manual logs or maintenance records with unknown completeness.1 / 2
Are OEE, loading time and the loss categories defined explicitly?No definition; metrics are reported as bare numbers.0 / 2
Does the loss breakdown account for the total loss it claims to explain?The reported causes or categories sum to at least 90% of the stated total, or an explicit "other" class closes the balance.2 / 2
Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method.2 / 2
Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked.1 / 2
Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result.2 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
—
Show verbatim quote (Stage IV: Analysis after improvement / Fig. 8)
In the graph, the material yield of the type D biscuit had an increase from 96.7 percent to 98.9 percent.
noneYield98.9 %Both extractors agreed
—
Show verbatim quote (Stage IV: Analysis after improvement / Fig. 7)
The results indicate that the OEE of the type D cookie had an increase from 83.2 percent to 86.7 percent.
noneOEE86.7 %Both extractors agreed
—
Show verbatim quote (Stage IV: Analysis after improvement / Fig. 8)
In the graph, the material yield of the type D biscuit had an increase from 96.7 percent to 98.9 percent.
noneYield96.7 %Both extractors agreed
—
Show verbatim quote (Stage IV: Analysis after improvement / Fig. 7)
The results indicate that the OEE of the type D cookie had an increase from 83.2 percent to 86.7 percent.
noneOEE83.2 %Both extractors agreed
—
Show verbatim quote (Section IV.A Main Problem)
Likewise, according to the OEE, the internal target of 86.9% having an average of 84%.
noneOEE84.0 %Single extractor
—
Show verbatim quote (Section IV.A Main Problem)
The material performance indicator reflects that the internal objective of 99% in production during 2021 was not achieved, having an average of 97% in the production of type D biscuits.
noneYield97.0 %Single extractor
downtime
Show verbatim quote (Section IV.B Model and tools)
For the downtime that generates 35% of the waste in the production of type D biscuits, the TPM tool will be used since these downtimes are reflected in machine breakdowns, unplanned stops and minor stoppages.
Not classifiable from the reportShare of lost time35.0 %Single extractor
shrinkage
Show verbatim quote (Stage III: Proposal for improvement and implementation)
The second main cause of waste is shrinkage, which represents 65% of losses.
Not classifiable from the reportShare of lost time65.0 %Single extractor
poorly sealed packagesprimary packing machine
Show verbatim quote (Stage III: Proposal for improvement and implementation / Fig. 6)
as a result there were poorly sealed packages, generating defective products, approximately 23% of the total loss in the production of type D biscuits.
Process defects (scrap and rework)Share of lost time23.0 %Single extractor
—
Show verbatim quote (Page 4, Main Problem section)
The material performance indicator reflects that the internal objective of 99% in production during 2021 was not achieved, having an average of 97% in the production of type D biscuits.
noneAvailability97.0 %Single extractor

Observation units

  • Type D cookie production line · Whole line or unspecified equipment · After intervention
  • Type D cookie production line · Whole line or unspecified equipment · Baseline