foratvise
Get Started
Included study

Utilização do Overall Line Effectiveness: Um Estudo de Caso em Uma Indústria Vinícola

Open source

1Bibliographic record

Authors
—
Year
—
Venue
—
Country
Brazil
Segment
Brewing, wine and spirits
Process family
Filling and packaging line
Study type
Single case study
Extraction scope
Full text
Size
1 plants · 1 lines · 10 machines
Observation period
63 days
Data collection
manual_logs
Intervention
Show the setting as described by the study
A linha objeto de estudo é constituída de dez equipamentos conectados em série sem formação de estoques intermediários.

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 12Moderate risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described.2 / 2
Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events).2 / 2
How were loss data collected?Manual logs or maintenance records with unknown completeness.1 / 2
Are OEE, loading time and the loss categories defined explicitly?A standard definition is cited but its application is not shown.1 / 2
Does the loss breakdown account for the total loss it claims to explain?Only the top causes are reported and the unexplained remainder can be computed.1 / 2
Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method.2 / 2
Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points.2 / 2
Could conflicts of interest or the source of the data bias the result?Authors are employees of the plant or of an equipment/software vendor; no declaration.1 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
—
Show verbatim quote (Quadro 2)
Desempenho (P) 74,49%
nonePerformance74.5 %Both extractors agreed
—
Show verbatim quote (Quadro 2)
Qualidade (O) 99,69%
noneQuality99.7 %Both extractors agreed
—
Show verbatim quote (Quadro 2 - Eficiência OLE)
OLE 61,81%
noneOEE61.8 %Both extractors agreed
Disponibilidade Planejada
Show verbatim quote (Quadro 2)
Disponibilidade P (Dp) 92,14%
noneAvailability92.1 %Both extractors agreed
Disponibilidade Não Planejada
Show verbatim quote (Quadro 2)
Disponibilidade Np (Dnp) 90,30%
noneAvailability90.3 %Both extractors agreed
—
Show verbatim quote (Results, page 15)
Para o quarto componente do OLE, foi verificado que 0,31% dos produtos tiveram que ser descartados por motivos de qualidade.
Process defects (scrap and rework)Defect rate0.310 %Both extractors agreed
Geral
Show verbatim quote (Figura 4)
Geral 30,9%
Not classifiable from the reportShare of lost time30.9 %Both extractors agreed
Disponibilidade (total)
Show verbatim quote (Results, page 12)
verificou-se que cerca de 18% das perdas em relação ao tempo total são referentes a disponibilidade
Not classifiable from the reportShare of lost time18.0 %Single extractor
Disponibilidade P
Show verbatim quote (Figura 3)
Disponibilidade P 8%
Planned downtime (scheduled maintenance, breaks, no demand)Share of lost time8.00 %Single extractor
Disponibilidade de NP
Show verbatim quote (Figura 3)
Disponibilidade de NP 10%
Not classifiable from the reportShare of lost time10.0 %Single extractor
dez principais paradas
Show verbatim quote (Figura 5 / Results text, page 13)
representam cerca de 48% do total de tempo perdido e as demais foram agrupadas
Idling and minor stops (micro-stops)Share of lost time48.0 %Single extractor
Planned availability losses
Show verbatim quote (Page 12, Figura 3)
Disponibilidade P 8%
Planned downtime (scheduled maintenance, breaks, no demand)Share of planned time8.00 %Single extractor
Unplanned availability losses
Show verbatim quote (Page 12, Figura 3)
Disponibilidade de NP 10%
Organizational or external stops (material or personnel shortage, utilities outage)Share of planned time10.0 %Single extractor
Limpeza de Pallets
Show verbatim quote (Page 14, Figura 6)
limpeza de Pallets 31
Idling and minor stops (micro-stops)Number of events31.0 eventsSingle extractor
Ajuste no Sensor do Cabeçote
Show verbatim quote (Page 14, Figura 6)
ajustes no Sensor do Cabeçote 10
Setup and adjustmentsNumber of events10.0 eventsSingle extractor
Trancou uma Gaiola
Show verbatim quote (Page 14, Figura 6)
Trancou uma Gaiola 5
Idling and minor stops (micro-stops)Number of events5.00 eventsSingle extractor
Limpeza de Esponjas
Show verbatim quote (Page 14, Figura 6)
limpeza de Esponjas 5
Idling and minor stops (micro-stops)Number of events5.00 eventsSingle extractor
Troca de bicos
Show verbatim quote (Page 14, Figura 6)
Troca de bicos 4
Setup and adjustmentsNumber of events4.00 eventsSingle extractor

Observation units

  • Linha de engarrafamento (piloto) · Whole line or unspecified equipment · Baseline
  • Bottling line · Whole line or unspecified equipment · Baseline