Included study
Analysis of Double indian Ballbreaker Net Sorter Machine Based on Overall Equipment Effectiveness Method Cases in Tea Plantation Plants
1Bibliographic record
- Authors
- Judi Alhilman, Ahmad F Abdillah
- Year
- 2019
- Venue
- IOP Conference Series Materials Science and Engineering
- Country
- —
- Segment
- Snacks, coffee, tea and other foods
- Process family
- Milling, extraction and separation
- Study type
- Single case study
- Extraction scope
- Abstract only
- Size
- 1 plants · — lines · 1 machines
- Observation period
- —
- Data collection
- not_reported
- Intervention
Show the setting as described by the study
This study analyzes the performance of Double Indian Ballbreaker Net Sorter (DIBN) machines, one of the machines used to produce orthodox tea which in the fact, this machine often damaged and has high downtime.
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 5High risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product or sector is given but the equipment or process is only partly described. | 1 / 2 |
| Is the observation period long enough and reported?Period not reported. | 0 / 2 |
| How were loss data collected?Interviews, estimates, or method not reported. | 0 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?No definition; metrics are reported as bare numbers. | 0 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?Only selected causes are reported and the total is unknown. | 0 / 2 |
| Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method. | 2 / 2 |
| Are the reported numbers internally consistent?Inconsistencies above 10 percentage points, or OEE factors above 100%. | 0 / 2 |
| Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result. | 2 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
—DIBN machineShow verbatim quote (abstract)Based on the OEE calculation results, the value of OEE DIBN machine is 53.98%. | none | OEE | 54.0 % | Both extractors agreed |
reduced speedDIBN machineShow verbatim quote (abstract)the most influencing factors to decrease the effectiveness of DIBN machines are rework losses (23.33%), reduced yield losses (20.17%) and reduced speed of 19.49%. | Reduced speed | Share of lost time | 19.5 % | Both extractors agreed |
reduced yield lossesDIBN machineShow verbatim quote (abstract)the most influencing factors to decrease the effectiveness of DIBN machines are rework losses (23.33%), reduced yield losses (20.17%) and reduced speed of 19.49%. | Start-up losses (reduced yield) | Share of lost time | 20.2 % | Both extractors agreed |
rework lossesDIBN machineShow verbatim quote (abstract)the most influencing factors to decrease the effectiveness of DIBN machines are rework losses (23.33%), reduced yield losses (20.17%) and reduced speed of 19.49%. | Process defects (scrap and rework) | Share of lost time | 23.3 % | Both extractors agreed |
Observation units
- DIBN machine · Separation (centrifugation, filtration, membranes) · Baseline

