foratvise
Get Started
Start-up losses (reduced yield)

Yield loss during start-up/transition

Start-up losses (reduced yield)QualityWhole line or unspecified equipment

In short

It appears in fewer than 1 of every 100 lines studied.

When it appears, it takes on average about 47 % of the line's lost time. Reported by 0 of the 127 studies that could observe it (sparse evidence).

What happens

Before the line or machine reaches stable operating conditions after a start-up, product changeover or process transition, output does not yet meet specification and is diverted as scrap, rework or discard. This yield loss accumulates from flushing, purging, warm-up of process parameters, and the time needed for control loops and mechanical settings to stabilize.

What is done about it

Standardize and shorten start-up and changeover procedures with defined ramp curves, pre-heating or pre-conditioning steps, and automated recipe loading to reach stable conditions faster, and track start-up yield as a separate KPI to drive continuous improvement.

Practical guidance written from engineering knowledge; it is not a statistical estimate.

1Probability and evidence

Pooled over all segments. A wide interval is a result: it states how much the evidence allows us to know.
Probability of presence
0.3% [0.0–1.0%]
Expected share of lost time
0.1% [0.0–0.5%]
Share of lost time when present
47% [29–65%]
Studies / units
127 / 161
Evidence grade
D

Grade D: 0 or 1 study; the estimate is driven by partial pooling and priors, and the wide interval is the result.

2Probability by segment

Partially pooled estimates for each industry segment.
  • Dairy products
    0.4% [0.0–1.4%]13 studies
  • Soft drinks, bottled water and juices
    0.3% [0.0–1.3%]26 studies
  • Brewing, wine and spirits
    0.3% [0.0–1.3%]11 studies
  • Bakery and pasta
    0.3% [0.0–1.3%]24 studies
  • Meat, poultry and seafood
    0.4% [0.0–1.5%]9 studies
  • Fruit and vegetable processing
    0.4% [0.0–1.5%]7 studies
  • Grain and oilseed milling
    0.4% [0.0–1.6%]6 studies
  • Sugar and confectionery
    0.4% [0.0–1.5%]9 studies
  • Snacks, coffee, tea and other foods
    0.4% [0.0–1.4%]5 studies
  • Animal feed and pet food
    0.4% [0.0–1.6%]7 studies
  • Food manufacturing (unspecified or mixed)
    0.4% [0.0–1.5%]10 studies

3Mechanism, SCADA signature and countermeasure

Engineering guidance that helps recognise and address the cause; it is not part of the statistical estimate.

Mechanism

Engineering guidance

Before the line or machine reaches stable operating conditions after a start-up, product changeover or process transition, output does not yet meet specification and is diverted as scrap, rework or discard. This yield loss accumulates from flushing, purging, warm-up of process parameters, and the time needed for control loops and mechanical settings to stabilize.

How it looks in SCADA data

Engineering guidance

MES/SCADA shows an elevated reject or downgrade count concentrated immediately after a run-start or changeover event, correlated with ramp periods in speed, temperature or pressure trends before they settle at setpoint; good-count yield per run is lower in the initial segment than in the steady-state segment of the same run.

Countermeasure

Engineering guidance

Standardize and shorten start-up and changeover procedures with defined ramp curves, pre-heating or pre-conditioning steps, and automated recipe loading to reach stable conditions faster, and track start-up yield as a separate KPI to drive continuous improvement.

4Sources

Every extracted datum with its study, value and verbatim quote.
  1. Share of lost time: 20.2 % · as reported: “reduced yield losses”
    Show verbatim quote
    the most influencing factors to decrease the effectiveness of DIBN machines are rework losses (23.33%), reduced yield losses (20.17%) and reduced speed of 19.49%.
  2. Share of planned time: 0 % · as reported: “Reduced yield losses”
    Show verbatim quote
    𝑅𝑒𝑑𝑢𝑐𝑒𝑑 𝑦𝑖𝑒𝑙𝑑 𝑙𝑜𝑠𝑠𝑒𝑠= 0 %
  3. Share of lost time: 3.78 % · as reported: “Reduced Yield Losses”
    Show verbatim quote
    Kegagalan karena Reduced Yield Losses 9,98 3,78 Rendah
  4. Lost time: 9.98 Jam · as reported: “Reduced Yield Losses”
    Show verbatim quote
    Kegagalan karena Reduced Yield Losses 9,98 3,78 Rendah