Sterilizer Reliability Analysis Using Reliability Block Diagram Based on Failure Identification Through Fault Tree Analysis

Open source

1Bibliographic record

Authors
Syamsul Bahri, Fatimah Fatimah, Saifuddin Muhammad Jalil, Amri Amri, Muhammad Ilham
Year
2021
Venue
International Journal of Engineering Science and Information Technology
Country
Indonesia
Segment
Grain and oilseed milling
Process family
Slaughter, cutting and primary processing
Study type
Reliability analysis
Extraction scope
Full text
Size
1 plants · — lines · 1 machines
Observation period
365 days
Data collection
maintenance_records
Intervention
Show the setting as described by the study
PT. X is a company engaged in the processing of fresh fruit bunches (FFB) into Crude Palm Oil and Palm Kernel.

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 12Moderate risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described.2 / 2
Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events).2 / 2
How were loss data collected?Manual logs or maintenance records with unknown completeness.1 / 2
Are OEE, loading time and the loss categories defined explicitly?A standard definition is cited but its application is not shown.1 / 2
Does the loss breakdown account for the total loss it claims to explain?Only the top causes are reported and the unexplained remainder can be computed.1 / 2
Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method.2 / 2
Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked.1 / 2
Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result.2 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
Packing doorPacking door
Show verbatim quote (Table 3)
Packing door 11
Equipment failure (breakdowns)Number of events11.0 eventsSingle extractor
Flange PipeFlange Pipe
Show verbatim quote (Table 3)
Flange Pipe 4
Equipment failure (breakdowns)Number of events4.00 eventsSingle extractor
Ball ValveBall Valve
Show verbatim quote (Table 3)
Ball Valve 2
Equipment failure (breakdowns)Number of events2.00 eventsSingle extractor
Nozzle CondensatNozzle Condensat
Show verbatim quote (Table 3)
Nozzle Condensat 2
Equipment failure (breakdowns)Number of events2.00 eventsSingle extractor
ActuatorActuator
Show verbatim quote (Table 3)
Actuator 2
Equipment failure (breakdowns)Number of events2.00 eventsSingle extractor
Valve ExhaustValve Exhaust
Show verbatim quote (Table 3)
Valve Exhaust 2
Equipment failure (breakdowns)Number of events2.00 eventsSingle extractor
Valve CondensatValve Condensat
Show verbatim quote (Table 3)
Valve Condensat 1
Equipment failure (breakdowns)Number of events1.00 eventsSingle extractor
Streiner ValveStreiner Valve
Show verbatim quote (Table 3)
Streiner Valve 1
Equipment failure (breakdowns)Number of events1.00 eventsSingle extractor
Packing FlangePacking Flange
Show verbatim quote (Table 3)
Packing Flange 1
Equipment failure (breakdowns)Number of events1.00 eventsSingle extractor
Packing doorPacking door
Show verbatim quote (Table 4)
Packing door 11 185,49
Equipment failure (breakdowns)Time between events185 hoursSingle extractor
ElbowElbow
Show verbatim quote (Table 4)
Elbow 4 510,1
Equipment failure (breakdowns)Time between events510 hoursSingle extractor
Flange PipeFlange Pipe
Show verbatim quote (Table 4)
Flange Pipe 4 510,1
Equipment failure (breakdowns)Time between events510 hoursSingle extractor
PipePipe
Show verbatim quote (Table 4)
Pipe 3 680,13
Equipment failure (breakdowns)Time between events680 hoursSingle extractor
Ball ValveBall Valve
Show verbatim quote (Table 4)
Ball Valve 2 1020,2
Equipment failure (breakdowns)Time between events1,020 hoursSingle extractor
Nozzle CondensatNozzle Condensat
Show verbatim quote (Table 4)
Nozzle Condensat 2 1020,2
Equipment failure (breakdowns)Time between events1,020 hoursSingle extractor
LinerLiner
Show verbatim quote (Table 4)
Liner 2 1020,2
Equipment failure (breakdowns)Time between events1,020 hoursSingle extractor
ActuatorActuator
Show verbatim quote (Table 4)
Actuator 2 1020,2
Equipment failure (breakdowns)Time between events1,020 hoursSingle extractor
Valve ExhaustValve Exhaust
Show verbatim quote (Table 4)
Valve Exhaust 2 1020,2
Equipment failure (breakdowns)Time between events1,020 hoursSingle extractor
Valve CondensatValve Condensat
Show verbatim quote (Table 4)
Valve Condensat 1 2040
Equipment failure (breakdowns)Time between events2,040 hoursSingle extractor
Streiner ValveStreiner Valve
Show verbatim quote (Table 4)
Streiner Valve 1 2040
Equipment failure (breakdowns)Time between events2,040 hoursSingle extractor
Packing FlangePacking Flange
Show verbatim quote (Table 4)
Packing Flange 1 2040
Equipment failure (breakdowns)Time between events2,040 hoursSingle extractor
—
Show verbatim quote (Table 2)
July 2020 20
Planned downtime (scheduled maintenance, breaks, no demand)Lost time20.0 hSingle extractor
—
Show verbatim quote (Table 2)
August 2020 15
Planned downtime (scheduled maintenance, breaks, no demand)Lost time15.0 hSingle extractor

Observation units

  • Horizontal Sterilizer · Sterilization (retort, UHT) · Baseline