foratvise
Get Started
Equipment failure (breakdowns)

Sterilizer piping and valve component failure

Equipment failure (breakdowns)AvailabilitySterilization (retort, UHT)

In short

It appears in about 6 of every 100 lines studied.

When it appears, it takes on average about 60 % of the line's lost time. Reported by 7 of the 34 studies that could observe it (good evidence).

What happens

Mechanical components of the sterilizer such as pipes, flanges, elbows, liners, nuts and pneumatic actuators suffer wear, corrosion, fatigue or loosening under repeated thermal and pressure cycling, leading to leaks, seizing or loss of actuation. This causes the sterilization process to stop until the damaged part is repaired or replaced by maintenance personnel.

What is done about it

Implement a preventive and predictive maintenance program covering piping, flanges, elbows, liners, nuts and actuators, including periodic inspection, torque verification, gasket and liner replacement schedules, and corrosion monitoring. Maintain critical spare parts on hand to shorten repair time when a failure occurs.

Practical guidance written from engineering knowledge; it is not a statistical estimate.

1Probability and evidence

Pooled over all segments. A wide interval is a result: it states how much the evidence allows us to know.
Probability of presence
6.2% [1.9–13.9%]
Expected share of lost time
3.7% [1.1–8.3%]
Share of lost time when present
60% [49–70%]
Studies / units
34 / 37
Evidence grade
B

Grade B: 5 to 9 studies, or an interval width between 0.20 and 0.35.

2Probability by segment

Partially pooled estimates for each industry segment.
  • Dairy products
    6.2% [1.0–17.7%]5 studies
  • Soft drinks, bottled water and juices
    6.5% [1.0–20.2%]2 studies
  • Brewing, wine and spirits
    9.5% [1.7–28.2%]1 study
  • Bakery and pasta
    7.1% [1.0–21.8%]0 studies
  • Meat, poultry and seafood
    6.8% [1.0–20.8%]1 study
  • Fruit and vegetable processing
    6.4% [1.0–18.6%]2 studies
  • Grain and oilseed milling
    29% [8–60%]6 studies
  • Sugar and confectionery
    6.3% [1.1–17.9%]3 studies
  • Snacks, coffee, tea and other foods
    6.0% [0.9–17.2%]3 studies
  • Animal feed and pet food
    6.2% [1.0–18.1%]4 studies
  • Food manufacturing (unspecified or mixed)
    5.8% [1.0–16.4%]7 studies

3Mechanism, SCADA signature and countermeasure

Engineering guidance that helps recognise and address the cause; it is not part of the statistical estimate.

Mechanism

Engineering guidance

Mechanical components of the sterilizer such as pipes, flanges, elbows, liners, nuts and pneumatic actuators suffer wear, corrosion, fatigue or loosening under repeated thermal and pressure cycling, leading to leaks, seizing or loss of actuation. This causes the sterilization process to stop until the damaged part is repaired or replaced by maintenance personnel.

How it looks in SCADA data

Engineering guidance

SCADA/MES logs show the sterilizer entering an unplanned stop or fault state with alarms tied to pressure deviation, actuator position feedback mismatch, or valve and piping fault codes, often recurring on the same subsystem. These events appear as discrete downtime entries attributed to mechanical components rather than to process parameters, and may be followed by extended maintenance intervention time.

Countermeasure

Engineering guidance

Implement a preventive and predictive maintenance program covering piping, flanges, elbows, liners, nuts and actuators, including periodic inspection, torque verification, gasket and liner replacement schedules, and corrosion monitoring. Maintain critical spare parts on hand to shorten repair time when a failure occurs.

4Sources

Every extracted datum with its study, value and verbatim quote.
  1. Share of lost time: 61.5 % · as reported: “Equipment Failures”
    Show verbatim quote
    Faktor terbesar yang mempengaruhi efektifitas mesin Sterilizer dan menjadi prioritas untuk dieleminasi adalah faktor Equipment Failures sebesar 61,54% dan faktor Idling minor Stoppages sebesar 25,15%.
  2. Lost time: 500 min · as reported: “SM”
    Show verbatim quote
    Total 2540 485 500 560 450 265 225 240 220 5485 224940 2.44%
  3. Number of events: 24.0 events · as reported: “SM”
    Show verbatim quote
    Total 61 21 24 22 17 7 11 10 8 181
  4. Share of lost time: 0 % · as reported: “Rework Loss”
    Show verbatim quote
    Idling And Minor Stoppages by 0% and Rework Loss by 0%
  5. Share of lost time: 4.69 % · as reported: “Yield / Scrap Losses”
    Show verbatim quote
    Reduced Speed Losses by 67.54%, then Breakdown Lossses by 18.48%, Set Up and Adjustment Losses by 9.35%, Yield / Scrap Losses by 4.69 %, Idling And Minor Stoppages by 0% and Rework Loss by 0%
  6. Share of lost time: 9.35 % · as reported: “Set Up and Adjustment Losses”
    Show verbatim quote
    Reduced Speed Losses by 67.54%, then Breakdown Lossses by 18.48%, Set Up and Adjustment Losses by 9.35%, Yield / Scrap Losses by 4.69 %, Idling And Minor Stoppages by 0% and Rework Loss by 0%
  7. Share of lost time: 18.5 % · as reported: “Breakdown Losses”
    Show verbatim quote
    Reduced Speed Losses by 67.54%, then Breakdown Lossses by 18.48%, Set Up and Adjustment Losses by 9.35%, Yield / Scrap Losses by 4.69 %, Idling And Minor Stoppages by 0% and Rework Loss by 0%
  8. Share of lost time: 67.5 % · as reported: “Reduced Speed Losses”
    Show verbatim quote
    Reduced Speed Losses by 67.54%, then Breakdown Lossses by 18.48%, Set Up and Adjustment Losses by 9.35%, Yield / Scrap Losses by 4.69 %, Idling And Minor Stoppages by 0% and Rework Loss by 0%
  9. Number of events: 4.00 events · as reported: “Flange Pipe”
    Show verbatim quote
    Flange Pipe 4
  10. Number of events: 2.00 events · as reported: “Ball Valve”
    Show verbatim quote
    Ball Valve 2
  11. Number of events: 2.00 events · as reported: “Actuator”
    Show verbatim quote
    Actuator 2
  12. Number of events: 2.00 events · as reported: “Valve Exhaust”
    Show verbatim quote
    Valve Exhaust 2
  13. Number of events: 1.00 events · as reported: “Valve Condensat”
    Show verbatim quote
    Valve Condensat 1
  14. Number of events: 1.00 events · as reported: “Streiner Valve”
    Show verbatim quote
    Streiner Valve 1
  15. Time between events: 510 hours · as reported: “Elbow”
    Show verbatim quote
    Elbow 4 510,1
  16. Time between events: 510 hours · as reported: “Flange Pipe”
    Show verbatim quote
    Flange Pipe 4 510,1
  17. Time between events: 680 hours · as reported: “Pipe”
    Show verbatim quote
    Pipe 3 680,13
  18. Time between events: 1,020 hours · as reported: “Ball Valve”
    Show verbatim quote
    Ball Valve 2 1020,2
  19. Time between events: 1,020 hours · as reported: “Liner”
    Show verbatim quote
    Liner 2 1020,2
  20. Time between events: 1,020 hours · as reported: “Actuator”
    Show verbatim quote
    Actuator 2 1020,2
  21. Time between events: 1,020 hours · as reported: “Valve Exhaust”
    Show verbatim quote
    Valve Exhaust 2 1020,2
  22. Time between events: 2,040 hours · as reported: “Valve Condensat”
    Show verbatim quote
    Valve Condensat 1 2040
  23. Time between events: 2,040 hours · as reported: “Streiner Valve”
    Show verbatim quote
    Streiner Valve 1 2040
  24. Lost time: 19,320 min · as reported: “planned downtime”
    Show verbatim quote
    selain itu terdapat total data dari planned downtime dari bulan Januari-Agustus 2023 adalah 19.320 menit.
  25. Lost time: 22,786 min · as reported: “downtime mesin”
    Show verbatim quote
    Data dari Januari hingga Agustus 2023 mencapai 22.786 menit, yang berdampak negatif pada proses produksi.
  26. Lost time: 47.0 h/month · as reported: “downtime”
    Show verbatim quote
    tercatat bahwa mesin sterilizer mengalami downtime rata-rata 47 jam per bulan, dengan jumlah gangguan teknis mencapai 6–8 kali per bulan.
  27. Defect rate: 0.0400 % · as reported: “USF (unstripped fruit)”
    Show verbatim quote
    Nilai rata-rata losses USF selama periode pengamatan tercatat sebesar 0,04%, sedangkan batas norma industri berada pada nilai 0,09%.
  28. Defect rate: 0.370 % · as reported: “Janjangan kosong”
    Show verbatim quote
    Evaluasi terhadap janjang kosong memperlihatkan bahwa rata-rata losses berada pada nilai 0,37% dengan batas norma maksimum sebesar 0,44%.
  29. Defect rate: 0.0900 % · as reported: “Nut”
    Show verbatim quote
    Nut 0,09 0,10 Mendekati batas