foratvise
Get Started
Included study

Evaluation of reliability, availability and maintainability of a milk production line

Open source

1Bibliographic record

Authors
Panagiotis Tsarouhas
Year
2019
Venue
International Journal of Industrial and Systems Engineering
Country
—
Segment
Dairy products
Process family
Whole plant or unspecified
Study type
Reliability analysis
Extraction scope
Abstract only
Size
1 plants · 1 lines · — machines
Observation period
—
Data collection
not_reported
Intervention
Show the setting as described by the study
The application of statistical approaches of failure data for analysing the reliability, availability and maintainability of a milk production line were carried out.

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 8Moderate risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product or sector is given but the equipment or process is only partly described.1 / 2
Is the observation period long enough and reported?Period not reported.0 / 2
How were loss data collected?Interviews, estimates, or method not reported.0 / 2
Are OEE, loading time and the loss categories defined explicitly?No definition; metrics are reported as bare numbers.0 / 2
Does the loss breakdown account for the total loss it claims to explain?Only the top causes are reported and the unexplained remainder can be computed.1 / 2
Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method.2 / 2
Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points.2 / 2
Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result.2 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
—
Show verbatim quote (abstract)
the availability for the milk production line was 96.13% and the line was down or under repair for 3.9%
noneAvailability96.1 %Both extractors agreed
bottling machine and heat exchanger/pasteuriser machine failuresbottling machine and heat exchanger/pasteuriser machine
Show verbatim quote (abstract)
both bottling machine and heat exchanger/pasteuriser machine had 57.5% of all the failures that presented on the production line
Equipment failure (breakdowns)Share of loss events57.5 %Both extractors agreed
down or under repair
Show verbatim quote (abstract)
the availability for the milk production line was 96.13% and the line was down or under repair for 3.9%
Not classifiable from the reportShare of lost time3.90 %Single extractor

Observation units

  • milk production line · Whole line or unspecified equipment · Baseline