Production Model to increase OEE through the application of Lean Manufacturing and Total Production Maintenance tools in animal feed manufacturing SMEs

Open source

1Bibliographic record

Authors
Angelo Paolo Espinoza-Monge, Yibely Alexandra Zenteno-Correa, Juan Carlos Quiroz-Flores, Martin Fidel Collao-Diaz
Year
2023
Venue
International Conference on Industrial Engineering and Operations Management (IEOM)
Country
Peru
Segment
Animal feed and pet food
Process family
Slaughter, cutting and primary processing
Study type
Single case study
Extraction scope
Full text
Size
1 plants · 1 lines · 4 machines
Observation period
—
Data collection
questionnaire
Intervention
Show the setting as described by the study
This scientific article will study the case of a company dedicated to the Production of Feed for Animals that shows problems in the level of its operating performance.

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 8Moderate risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product or sector is given but the equipment or process is only partly described.1 / 2
Is the observation period long enough and reported?Period reported but shorter than 30 days, or only the number of shifts is given.1 / 2
How were loss data collected?Interviews, estimates, or method not reported.0 / 2
Are OEE, loading time and the loss categories defined explicitly?A standard definition is cited but its application is not shown.1 / 2
Does the loss breakdown account for the total loss it claims to explain?The reported causes or categories sum to at least 90% of the stated total, or an explicit "other" class closes the balance.2 / 2
Is there evidence of selective reporting of favourable results?Intervention study in which baseline and post-intervention periods differ in length or method.1 / 2
Are the reported numbers internally consistent?Inconsistencies above 10 percentage points, or OEE factors above 100%.0 / 2
Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result.2 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
—
Show verbatim quote (Table 3)
MTTR 3.54 MTBF 4.523 Availability 56.10%
Equipment failure (breakdowns)Time between events4.52 not reportedBoth extractors agreed
—
Show verbatim quote (Table 3)
MTTR 3.54 MTBF 4.523 Availability 56.10%
Equipment failure (breakdowns)Mean event duration3.54 not reportedBoth extractors agreed
crusher clogging due to very large stonescrusher
Show verbatim quote (Section 5.1)
the crusher clogging due to very large stones represents a lower percentage of 19.88%, which makes visible how this cause affects the indicator.
Idling and minor stops (micro-stops)Share of lost time19.9 %Adjudicated
lack of raw material and supplies
Show verbatim quote (Section 5.1)
there is the lack of raw material and supplies, which generates a 29.96% of the low performance because of the poor management of these.
Organizational or external stops (material or personnel shortage, utilities outage)Share of lost time30.0 %Both extractors agreed
maintenance problems
Show verbatim quote (Section 5.1)
there is a 50.16% for maintenance problems, which is shown in the graphic it is the cause possessing the highest percentage, affecting more the company performance on the productive part.
Equipment failure (breakdowns)Share of lost time50.2 %Both extractors agreed
—
Show verbatim quote (Table 1)
Quality > 99% Perfect orders Total orders 𝑥𝑥 100 77,54% Indicator is lower than established goal, requires measures
noneQuality77.5 %Both extractors agreed
—
Show verbatim quote (Table 1)
Performance > 95% Actual monthly production Programmed monthly production 𝑥𝑥 100 68,75% Productivity lower than goal. Requires measures
nonePerformance68.8 %Both extractors agreed
—
Show verbatim quote (Table 1)
Availability 90% T. Available −React. Mnt. −Planned Mnt. T. Available −React. Mnt. 𝑥𝑥 100 56.10% Value is too far from the goal, requires measures
noneAvailability56.1 %Both extractors agreed
—
Show verbatim quote (Table 1)
Overall Equipment Effectiveness 85% Performance 𝑥𝑥 Quality 𝑥𝑥 Availability 29,90% Value reached is too far from the goal set, requires measures
noneOEE29.9 %Both extractors agreed
—
Show verbatim quote (Table 2)
Total Annual Production (Tn) 11255 10979 10725 Programmed Annual (Tn) 15200 15400 15600 Performance 74.05% 71.29% 68.75%
nonePerformance74.1 %Single extractor
—
Show verbatim quote (Table 2)
Total Annual Production (Tn) 11255 10979 10725 Programmed Annual (Tn) 15200 15400 15600 Performance 74.05% 71.29% 68.75%
nonePerformance71.3 %Single extractor
Reactive Maintenance
Show verbatim quote (Table 4)
Reactive Maintenance Man-Hours 1340 11,390
Equipment failure (breakdowns)Lost time1,340 hSingle extractor

Observation units

  • whole plant · Whole line or unspecified equipment · Baseline