Included study
Production Model to increase OEE through the application of Lean Manufacturing and Total Production Maintenance tools in animal feed manufacturing SMEs
1Bibliographic record
- Authors
- Angelo Paolo Espinoza-Monge, Yibely Alexandra Zenteno-Correa, Juan Carlos Quiroz-Flores, Martin Fidel Collao-Diaz
- Year
- 2023
- Venue
- International Conference on Industrial Engineering and Operations Management (IEOM)
- Country
- Peru
- Segment
- Animal feed and pet food
- Process family
- Slaughter, cutting and primary processing
- Study type
- Single case study
- Extraction scope
- Full text
- Size
- 1 plants · 1 lines · 4 machines
- Observation period
- —
- Data collection
- questionnaire
- Intervention
Show the setting as described by the study
This scientific article will study the case of a company dedicated to the Production of Feed for Animals that shows problems in the level of its operating performance.
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 8Moderate risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product or sector is given but the equipment or process is only partly described. | 1 / 2 |
| Is the observation period long enough and reported?Period reported but shorter than 30 days, or only the number of shifts is given. | 1 / 2 |
| How were loss data collected?Interviews, estimates, or method not reported. | 0 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?A standard definition is cited but its application is not shown. | 1 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?The reported causes or categories sum to at least 90% of the stated total, or an explicit "other" class closes the balance. | 2 / 2 |
| Is there evidence of selective reporting of favourable results?Intervention study in which baseline and post-intervention periods differ in length or method. | 1 / 2 |
| Are the reported numbers internally consistent?Inconsistencies above 10 percentage points, or OEE factors above 100%. | 0 / 2 |
| Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result. | 2 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
—Show verbatim quote (Table 3)MTTR 3.54 MTBF 4.523 Availability 56.10% | Equipment failure (breakdowns) | Time between events | 4.52 not reported | Both extractors agreed |
—Show verbatim quote (Table 3)MTTR 3.54 MTBF 4.523 Availability 56.10% | Equipment failure (breakdowns) | Mean event duration | 3.54 not reported | Both extractors agreed |
crusher clogging due to very large stonescrusherShow verbatim quote (Section 5.1)the crusher clogging due to very large stones represents a lower percentage of 19.88%, which makes visible how this cause affects the indicator. | Idling and minor stops (micro-stops) | Share of lost time | 19.9 % | Adjudicated |
lack of raw material and suppliesShow verbatim quote (Section 5.1)there is the lack of raw material and supplies, which generates a 29.96% of the low performance because of the poor management of these. | Organizational or external stops (material or personnel shortage, utilities outage) | Share of lost time | 30.0 % | Both extractors agreed |
maintenance problemsShow verbatim quote (Section 5.1)there is a 50.16% for maintenance problems, which is shown in the graphic it is the cause possessing the highest percentage, affecting more the company performance on the productive part. | Equipment failure (breakdowns) | Share of lost time | 50.2 % | Both extractors agreed |
—Show verbatim quote (Table 1)Quality > 99% Perfect orders Total orders 𝑥𝑥 100 77,54% Indicator is lower than established goal, requires measures | none | Quality | 77.5 % | Both extractors agreed |
—Show verbatim quote (Table 1)Performance > 95% Actual monthly production Programmed monthly production 𝑥𝑥 100 68,75% Productivity lower than goal. Requires measures | none | Performance | 68.8 % | Both extractors agreed |
—Show verbatim quote (Table 1)Availability 90% T. Available −React. Mnt. −Planned Mnt. T. Available −React. Mnt. 𝑥𝑥 100 56.10% Value is too far from the goal, requires measures | none | Availability | 56.1 % | Both extractors agreed |
—Show verbatim quote (Table 1)Overall Equipment Effectiveness 85% Performance 𝑥𝑥 Quality 𝑥𝑥 Availability 29,90% Value reached is too far from the goal set, requires measures | none | OEE | 29.9 % | Both extractors agreed |
—Show verbatim quote (Table 2)Total Annual Production (Tn) 11255 10979 10725 Programmed Annual (Tn) 15200 15400 15600 Performance 74.05% 71.29% 68.75% | none | Performance | 74.1 % | Single extractor |
—Show verbatim quote (Table 2)Total Annual Production (Tn) 11255 10979 10725 Programmed Annual (Tn) 15200 15400 15600 Performance 74.05% 71.29% 68.75% | none | Performance | 71.3 % | Single extractor |
Reactive MaintenanceShow verbatim quote (Table 4)Reactive Maintenance Man-Hours 1340 11,390 | Equipment failure (breakdowns) | Lost time | 1,340 h | Single extractor |
Observation units
- whole plant · Whole line or unspecified equipment · Baseline