planned downtime

Maintenance Program Downtime (Planned and Reactive)

In short

It appears in about 2 of every 100 lines studied.

When it appears, it takes on average about 57 % of the line's lost time. Reported by 5 of the 127 studies that could observe it (good evidence).

What happens

Production stops occur because equipment or civil structures are taken out of service for scheduled preventive or condition-based maintenance tasks, or unexpectedly for reactive repairs when the maintenance strategy fails to anticipate a failure. Coordination activities such as maintenance planning meetings also occupy line time without producing output. The underlying driver is the plant's overall maintenance policy, which determines the split between planned interventions and unplanned, failure-driven stops.

What is done about it

Strengthen the maintenance strategy by shifting the balance from reactive repair toward preventive and condition-based maintenance, and plan maintenance windows, meetings and civil works to minimize their impact on scheduled production. Track maintenance KPIs such as planned versus unplanned downtime ratios to continuously refine the maintenance management program.

Practical guidance written from engineering knowledge; it is not a statistical estimate.

1Probability and evidence

Pooled over all segments. A wide interval is a result: it states how much the evidence allows us to know.
Probability of presence
1.6% [0.5–3.6%]
Expected share of lost time
0.9% [0.3–2.0%]
Share of lost time when present
57% [46–67%]
Studies / units
127 / 161
Evidence grade
B

Grade B: 5 to 9 studies, or an interval width between 0.20 and 0.35.

2Probability by segment

Partially pooled estimates for each industry segment.
  • Dairy products
    1.7% [0.3–5.3%]13 studies
  • Soft drinks, bottled water and juices
    1.8% [0.3–5.1%]26 studies
  • Brewing, wine and spirits
    2.3% [0.4–6.9%]11 studies
  • Bakery and pasta
    1.4% [0.2–4.1%]24 studies
  • Meat, poultry and seafood
    1.7% [0.3–5.5%]9 studies
  • Fruit and vegetable processing
    1.7% [0.3–5.3%]7 studies
  • Grain and oilseed milling
    1.7% [0.3–5.5%]6 studies
  • Sugar and confectionery
    2.3% [0.4–7.3%]9 studies
  • Snacks, coffee, tea and other foods
    1.7% [0.3–5.5%]5 studies
  • Animal feed and pet food
    2.4% [0.4–7.5%]7 studies
  • Food manufacturing (unspecified or mixed)
    2.4% [0.4–8.0%]10 studies

3Mechanism, SCADA signature and countermeasure

Engineering guidance that helps recognise and address the cause; it is not part of the statistical estimate.

Mechanism

Engineering guidance

Production stops occur because equipment or civil structures are taken out of service for scheduled preventive or condition-based maintenance tasks, or unexpectedly for reactive repairs when the maintenance strategy fails to anticipate a failure. Coordination activities such as maintenance planning meetings also occupy line time without producing output. The underlying driver is the plant's overall maintenance policy, which determines the split between planned interventions and unplanned, failure-driven stops.

How it looks in SCADA data

Engineering guidance

SCADA/MES logs show machine-state transitions to maintenance or stopped states tagged with work-order, PM-code or meeting references, with a mix of short recurring scheduled blocks and longer irregular reactive events. Stop reason codes point to maintenance activities or administrative coordination rather than to a specific component failure mode, and downtime clusters around maintenance calendars or condition-monitoring alerts.

Countermeasure

Engineering guidance

Strengthen the maintenance strategy by shifting the balance from reactive repair toward preventive and condition-based maintenance, and plan maintenance windows, meetings and civil works to minimize their impact on scheduled production. Track maintenance KPIs such as planned versus unplanned downtime ratios to continuously refine the maintenance management program.

4Sources

Every extracted datum with its study, value and verbatim quote.
  1. Mean event duration: 13.6 jam · as reported: “condition based maintenance (PM02)”
    Show verbatim quote
    Kegiatan PM 02 memerlukan waktu rata-rata 13,6 jam.
  2. Share of lost time: 27.0 % · as reported: “maintenance strategy followed by the plant”
    Show verbatim quote
    the main causes of the losses in production are stated as mechanical failure in washing section which covers the largest portion (35%), maintenance strategy followed by the plant (27%), maintenance management program (25%), and high cost of maintenance inventory control, and other (13%).
  3. Share of lost time: 25.0 % · as reported: “maintenance management program”
    Show verbatim quote
    the main causes of the losses in production are stated as mechanical failure in washing section which covers the largest portion (35%), maintenance strategy followed by the plant (27%), maintenance management program (25%), and high cost of maintenance inventory control, and other (13%).
  4. Time between events: 7.53 log(min) · as reported: “Civil Maintenance”
    Show verbatim quote
    Civil Maintenance 2 7.534 (5.100; 9.969)
  5. Lost time: 42,723 min · as reported: “Scheduled Maintenance”
    Show verbatim quote
    Scheduled Maintenance 42723 40.82 40.82
  6. Share of lost time: 40.8 % · as reported: “Scheduled Maintenance”
    Show verbatim quote
    Scheduled Maintenance 42723 40.82 40.82
  7. Lost time: 9,723 min · as reported: “Maintenance job meetings”
    Show verbatim quote
    Maintenance job meetings 9723 9.29 93.3
  8. Share of lost time: 9.29 % · as reported: “Maintenance job meetings”
    Show verbatim quote
    Maintenance job meetings 9723 9.29 93.3
  9. Share of lost time: 50.2 % · as reported: “maintenance problems”
    Show verbatim quote
    there is a 50.16% for maintenance problems, which is shown in the graphic it is the cause possessing the highest percentage, affecting more the company performance on the productive part.
  10. Lost time: 1,340 h · as reported: “Reactive Maintenance”
    Show verbatim quote
    Reactive Maintenance Man-Hours 1340 11,390
  11. Lost time: 7.00 hrs · as reported: “Routine maintenance”
    Show verbatim quote
    Glass Washer Line 5 Routine Maintenance May 7 5.1 2.8 ₦360,000 6.0