Application of Lean-Total Productive Maintenance Tools to Reduce Setup Times and Machine Stoppages on the Molding Line of an SME in the Food Industry

Open source

1Bibliographic record

Authors
Renzo Peralta-Pereda, Frank Zamora, Juan Carlos Quiroz-Flores, Martin Fidel Collao-Diaz, Alberto Flores-Pérez
Year
2023
Venue
International Journal of Engineering and Technology
Country
Peru
Segment
Dairy products
Process family
Whole plant or unspecified
Study type
Before/after intervention
Extraction scope
Full text
Size
1 plants · 1 lines · 7 machines
Observation period
30 days
Data collection
manual_logs
Intervention
Show the setting as described by the study
For the validation, a data collection of the operation times and the necessary times for the analysis of the indicators was carried out, all this in one month for the production batches of cream ice cream in the presentation of 63 grams, obtaining as data the daily production of 5443 boxes of ice cream

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 12Moderate risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described.2 / 2
Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events).2 / 2
How were loss data collected?Manual logs or maintenance records with unknown completeness.1 / 2
Are OEE, loading time and the loss categories defined explicitly?A standard definition is cited but its application is not shown.1 / 2
Does the loss breakdown account for the total loss it claims to explain?Only the top causes are reported and the unexplained remainder can be computed.1 / 2
Is there evidence of selective reporting of favourable results?Intervention study in which baseline and post-intervention periods differ in length or method.1 / 2
Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points.2 / 2
Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result.2 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
—Wrapper
Show verbatim quote (Section IV.B)
During the analysis period, the following machine stops were observed: 2 stops in the Mix Plant, 8 stops in the Freezer, 3 stops in the Cold Compressor and Boiler, 1 stop in the Air Compressor, 86 stops in the Palletizer and 25 in the Wrapper.
Equipment failure (breakdowns)Number of events25.0 eventsBoth extractors agreed
—Palletizer
Show verbatim quote (Section IV.B)
During the analysis period, the following machine stops were observed: 2 stops in the Mix Plant, 8 stops in the Freezer, 3 stops in the Cold Compressor and Boiler, 1 stop in the Air Compressor, 86 stops in the Palletizer and 25 in the Wrapper.
Equipment failure (breakdowns)Number of events86.0 eventsBoth extractors agreed
—Air Compressor
Show verbatim quote (Section IV.B)
During the analysis period, the following machine stops were observed: 2 stops in the Mix Plant, 8 stops in the Freezer, 3 stops in the Cold Compressor and Boiler, 1 stop in the Air Compressor, 86 stops in the Palletizer and 25 in the Wrapper.
Equipment failure (breakdowns)Number of events1.00 eventsBoth extractors agreed
—Boiler
Show verbatim quote (Section IV.B)
During the analysis period, the following machine stops were observed: 2 stops in the Mix Plant, 8 stops in the Freezer, 3 stops in the Cold Compressor and Boiler, 1 stop in the Air Compressor, 86 stops in the Palletizer and 25 in the Wrapper.
Equipment failure (breakdowns)Number of events3.00 eventsBoth extractors agreed
—Cold Compressor
Show verbatim quote (Section IV.B)
During the analysis period, the following machine stops were observed: 2 stops in the Mix Plant, 8 stops in the Freezer, 3 stops in the Cold Compressor and Boiler, 1 stop in the Air Compressor, 86 stops in the Palletizer and 25 in the Wrapper.
Equipment failure (breakdowns)Number of events3.00 eventsBoth extractors agreed
—Freezer
Show verbatim quote (Section IV.B)
During the analysis period, the following machine stops were observed: 2 stops in the Mix Plant, 8 stops in the Freezer, 3 stops in the Cold Compressor and Boiler, 1 stop in the Air Compressor, 86 stops in the Palletizer and 25 in the Wrapper.
Equipment failure (breakdowns)Number of events8.00 eventsBoth extractors agreed
—Mix Plant
Show verbatim quote (Section IV.B)
During the analysis period, the following machine stops were observed: 2 stops in the Mix Plant, 8 stops in the Freezer, 3 stops in the Cold Compressor and Boiler, 1 stop in the Air Compressor, 86 stops in the Palletizer and 25 in the Wrapper.
Equipment failure (breakdowns)Number of events2.00 eventsBoth extractors agreed
—
Show verbatim quote (Section IV.B)
A global average MTBF (Mean Time Between Failures) equivalent to 185.22 h was obtained and concerning the MTTR (Mean Time to Repair), a global average of 88.45 minutes/stop was obtained for the machines.
Equipment failure (breakdowns)Mean event duration88.5 min/stopBoth extractors agreed
—
Show verbatim quote (Section IV.B)
A global average MTBF (Mean Time Between Failures) equivalent to 185.22 h was obtained and concerning the MTTR (Mean Time to Repair), a global average of 88.45 minutes/stop was obtained for the machines.
Equipment failure (breakdowns)Time between events185 hBoth extractors agreed
Total duration of mold change
Show verbatim quote (Section IV.B / Table II)
From the data collection of the total duration of mold change times, a total of 280 minutes on average was obtained, and the times of internal activities, 254 min, and external activities, 26 min.
Setup and adjustmentsLost time280 minSingle extractor
Duration of internal activities
Show verbatim quote (Section IV.B / Table II)
From the data collection of the total duration of mold change times, a total of 280 minutes on average was obtained, and the times of internal activities, 254 min, and external activities, 26 min.
Setup and adjustmentsLost time254 minSingle extractor
Duration of external activities
Show verbatim quote (Section IV.B / Table II)
From the data collection of the total duration of mold change times, a total of 280 minutes on average was obtained, and the times of internal activities, 254 min, and external activities, 26 min.
Setup and adjustmentsLost time26.0 minSingle extractor
mold change
Show verbatim quote (Page 4, Section B (Initial Diagnosis); Table II)
From the data collection of the total duration of mold change times, a total of 280 minutes on average was obtained
Setup and adjustmentsMean event duration280 minSingle extractor
internal activities
Show verbatim quote (Page 4, Section B)
the times of internal activities, 254 min, and external activities, 26 min
Setup and adjustmentsMean event duration254 minSingle extractor
external activities
Show verbatim quote (Page 4, Section B)
the times of internal activities, 254 min, and external activities, 26 min
Setup and adjustmentsMean event duration26.0 minSingle extractor
—
Show verbatim quote (Page 4, Section B)
obtaining as data the daily production of 5443 boxes of ice cream (each box contains 40 popsicles of cream ice cream)
noneThroughput5,443 boxes/daySingle extractor

Observation units

  • Wrapper · Packaging (forming, sealing, wrapping, case packing, palletizing) · Baseline
  • Palletizer · Packaging (forming, sealing, wrapping, case packing, palletizing) · Baseline
  • Air Compressor · Utilities (steam, compressed air, chilled water, power) · Baseline
  • Boiler · Utilities (steam, compressed air, chilled water, power) · Baseline
  • Cold Compressor · Utilities (steam, compressed air, chilled water, power) · Baseline
  • Freezer · Refrigeration and freezing · Baseline
  • Mix Plant · Mixing and blending · Baseline
  • Molding line (mold change / setup process) · Forming, moulding and depositing · Baseline
  • Molding line · Whole line or unspecified equipment · Baseline