Included study
ANALISIS EFEKTIVITAS MESIN PRODUKSI GULA UNTUK MINIMALISASI PEMBOROSAN PADA PABRIK GULA PANDJIE SITUBONDO
1Bibliographic record
- Authors
- Yuli Wibowo, Siswoyo Soekarno, Siti Hasana
- Year
- 2025
- Venue
- Industri Inovatif Jurnal Teknik Industri
- Country
- Indonesia
- Segment
- Sugar and confectionery
- Process family
- Whole plant or unspecified
- Study type
- Single case study
- Extraction scope
- Full text
- Size
- 1 plants · 5 lines · 5 machines
- Observation period
- 1,825 days
- Data collection
- maintenance_records
- Intervention
Show the setting as described by the study
Pabrik Gula (PG) Pandjie Situbondo merupakan salah satu unit usaha yang berada dibawah naungan PTPN XI yang bergerak dalam bidang pengolahan tebu dengan hasil produk gula kristal putih.
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 13Low risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described. | 2 / 2 |
| Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events). | 2 / 2 |
| How were loss data collected?Manual logs or maintenance records with unknown completeness. | 1 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?Formulae or definitions are given for the reported metrics, including what counts as planned time. | 2 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?The reported causes or categories sum to at least 90% of the stated total, or an explicit "other" class closes the balance. | 2 / 2 |
| Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method. | 2 / 2 |
| Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked. | 1 / 2 |
| Could conflicts of interest or the source of the data bias the result?Authors are employees of the plant or of an equipment/software vendor; no declaration. | 1 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
—Show verbatim quote (Table 7)Rata-rata 74,97% | none | OEE | 75.0 % | Both extractors agreed |
—Show verbatim quote (Table 6)Rata-rata 74,97% | none | OEE | 75.0 % | Both extractors agreed |
—Show verbatim quote (Table 5)Rata-rata 74,97% | none | OEE | 75.0 % | Both extractors agreed |
—Show verbatim quote (Table 4)Rata-rata 74,26% | none | OEE | 74.3 % | Both extractors agreed |
—Show verbatim quote (Table 3)Rata-rata 74,97% | none | OEE | 75.0 % | Both extractors agreed |
—Show verbatim quote (Table 3)2017 99,56% 79,75% 100,00% 79,40% | none | Availability | 99.6 % | Single extractor |
—Show verbatim quote (Table 3)2017 99,56% 79,75% 100,00% 79,40% | none | Performance | 79.8 % | Single extractor |
—Show verbatim quote (Table 3)2017 99,56% 79,75% 100,00% 79,40% | none | Quality | 100 % | Single extractor |
—Show verbatim quote (Table 3)2018 98,47% 77,66% 100,00% 76,47% | none | Availability | 98.5 % | Single extractor |
—Show verbatim quote (Table 3)2018 98,47% 77,66% 100,00% 76,47% | none | Performance | 77.7 % | Single extractor |
—Show verbatim quote (Table 3)2019 97,57% 84,05% 100,00% 82,01% | none | Availability | 97.6 % | Single extractor |
—Show verbatim quote (Table 3)2019 97,57% 84,05% 100,00% 82,01% | none | Performance | 84.1 % | Single extractor |
—Show verbatim quote (Table 3)2020 99,27% 77,29% 100,00% 76,73% | none | Availability | 99.3 % | Single extractor |
—Show verbatim quote (Table 3)2020 99,27% 77,29% 100,00% 76,73% | none | Performance | 77.3 % | Single extractor |
—Show verbatim quote (Table 3)2021 99,14% 60,75% 100,00% 60,23% | none | Availability | 99.1 % | Single extractor |
—Show verbatim quote (Table 3)2021 99,14% 60,75% 100,00% 60,23% | none | Performance | 60.8 % | Single extractor |
—Show verbatim quote (Table 8)Breakdown Losses 2159,4 4,81% 4,81% | Equipment failure (breakdowns) | Lost time | 2,159 menit | Single extractor |
—Show verbatim quote (Table 8)Breakdown Losses 2159,4 4,81% 4,81% | Equipment failure (breakdowns) | Share of lost time | 4.81 % | Single extractor |
—Show verbatim quote (Table 8)Setup and Adjustment 0 0,00% 4,81% | Setup and adjustments | Lost time | 0 menit | Single extractor |
—Show verbatim quote (Table 8)Setup and Adjustment 0 0,00% 4,81% | Setup and adjustments | Share of lost time | 0 % | Single extractor |
—Show verbatim quote (Table 8)Idling and Minor Stoppges 592,56 1,32% 6,13% | Idling and minor stops (micro-stops) | Lost time | 593 menit | Single extractor |
—Show verbatim quote (Table 8)Idling and Minor Stoppges 592,56 1,32% 6,13% | Idling and minor stops (micro-stops) | Share of lost time | 1.32 % | Single extractor |
—Show verbatim quote (Table 8)Reduced Speed Losses 42127,35 93,87% 100,00% | Reduced speed | Lost time | 42,127 menit | Single extractor |
—Show verbatim quote (Table 8)Reduced Speed Losses 42127,35 93,87% 100,00% | Reduced speed | Share of lost time | 93.9 % | Single extractor |
—Show verbatim quote (Table 8)Reduced Yield 0 0,00% 100,00% | Start-up losses (reduced yield) | Lost time | 0 menit | Single extractor |
—Show verbatim quote (Table 8)Reduced Yield 0 0,00% 100,00% | Start-up losses (reduced yield) | Share of lost time | 0 % | Single extractor |
—Show verbatim quote (Table 8)Defect In Process 0 0,00% 100,00% | Process defects (scrap and rework) | Lost time | 0 menit | Single extractor |
—Show verbatim quote (Table 8)Defect In Process 0 0,00% 100,00% | Process defects (scrap and rework) | Share of lost time | 0 % | Single extractor |
—Show verbatim quote (Table 2)2017 967,20 1.550,40 469,20 25,20 0,00 109,80 | Not classifiable from the report | Lost time | 967 menit | Single extractor |
—Show verbatim quote (Table 2)2018 3.553,20 916,80 6.285,00 271,20 37,80 76,20 | Not classifiable from the report | Lost time | 3,553 menit | Single extractor |
—Show verbatim quote (Table 2)2019 3.949,80 96,00 234,00 40,20 0,00 214,80 | Not classifiable from the report | Lost time | 3,950 menit | Single extractor |
—Show verbatim quote (Table 2)2020 1.045,80 54,00 0,00 217,20 0,00 390,00 | Not classifiable from the report | Lost time | 1,046 menit | Single extractor |
—Show verbatim quote (Table 2)2021 1.281,00 0,00 1.096,80 0,00 0,00 2.172,00 | Not classifiable from the report | Lost time | 1,281 menit | Single extractor |
—Show verbatim quote (Table 4)2017 99,29% 79,96% 98,10% 77,88% | none | Availability | 99.3 % | Single extractor |
—Show verbatim quote (Table 4)2017 99,29% 79,96% 98,10% 77,88% | none | Performance | 80.0 % | Single extractor |
—Show verbatim quote (Table 4)2017 99,29% 79,96% 98,10% 77,88% | none | Quality | 98.1 % | Single extractor |
—Show verbatim quote (Table 4)2018 99,60% 76,77% 99,49% 76,08% | none | Availability | 99.6 % | Single extractor |
—Show verbatim quote (Table 4)2018 99,60% 76,77% 99,49% 76,08% | none | Performance | 76.8 % | Single extractor |
—Show verbatim quote (Table 4)2018 99,60% 76,77% 99,49% 76,08% | none | Quality | 99.5 % | Single extractor |
—Show verbatim quote (Table 4)2019 99,94% 82,06% 100,00% 82,01% | none | Availability | 99.9 % | Single extractor |
—Show verbatim quote (Table 4)2019 99,94% 82,06% 100,00% 82,01% | none | Performance | 82.1 % | Single extractor |
—Show verbatim quote (Table 4)2019 99,94% 82,06% 100,00% 82,01% | none | Quality | 100 % | Single extractor |
—Show verbatim quote (Table 4)2020 99,96% 76,76% 100,00% 76,73% | none | Availability | 100.0 % | Single extractor |
—Show verbatim quote (Table 4)2020 99,96% 76,76% 100,00% 76,73% | none | Performance | 76.8 % | Single extractor |
—Show verbatim quote (Table 4)2021 100,00% 60,23% 97,34% 58,63% | none | Availability | 100 % | Single extractor |
—Show verbatim quote (Table 4)2021 100,00% 60,23% 97,34% 58,63% | none | Performance | 60.2 % | Single extractor |
—Show verbatim quote (Table 4)2021 100,00% 60,23% 97,34% 58,63% | none | Quality | 97.3 % | Single extractor |
—Show verbatim quote (Table 9)Breakdown Losses 523,44 1,13% 1,13% | Equipment failure (breakdowns) | Lost time | 523 menit | Single extractor |
—Show verbatim quote (Table 9)Breakdown Losses 523,44 1,13% 1,13% | Equipment failure (breakdowns) | Share of lost time | 1.13 % | Single extractor |
—Show verbatim quote (Table 9)Setup and Adjustment 0 0,00% 1,13% | Setup and adjustments | Lost time | 0 menit | Single extractor |
—Show verbatim quote (Table 9)Setup and Adjustment 0 0,00% 1,13% | Setup and adjustments | Share of lost time | 0 % | Single extractor |
—Show verbatim quote (Table 9)Idling and Minor Stoppges 592,56 1,28% 2,42% | Idling and minor stops (micro-stops) | Lost time | 593 menit | Single extractor |
—Show verbatim quote (Table 9)Idling and Minor Stoppges 592,56 1,28% 2,42% | Idling and minor stops (micro-stops) | Share of lost time | 1.28 % | Single extractor |
—Show verbatim quote (Table 9)Reduced Speed Losses 43763,31 94,73% 97,14% | Reduced speed | Lost time | 43,763 menit | Single extractor |
—Show verbatim quote (Table 9)Reduced Speed Losses 43763,31 94,73% 97,14% | Reduced speed | Share of lost time | 94.7 % | Single extractor |
—Show verbatim quote (Table 9)Reduced Yield 0 0,00% 97,14% | Start-up losses (reduced yield) | Lost time | 0 menit | Single extractor |
—Show verbatim quote (Table 9)Reduced Yield 0 0,00% 97,14% | Start-up losses (reduced yield) | Share of lost time | 0 % | Single extractor |
—Show verbatim quote (Table 9)Defect In Process 1318,96 2,86% 100,00% | Process defects (scrap and rework) | Lost time | 1,319 menit | Single extractor |
—Show verbatim quote (Table 9)Defect In Process 1318,96 2,86% 100,00% | Process defects (scrap and rework) | Share of lost time | 2.86 % | Single extractor |
—Show verbatim quote (Table 2)2017 967,20 1.550,40 469,20 25,20 0,00 109,80 | Not classifiable from the report | Lost time | 1,550 menit | Single extractor |
—Show verbatim quote (Table 2)2018 3.553,20 916,80 6.285,00 271,20 37,80 76,20 | Not classifiable from the report | Lost time | 917 menit | Single extractor |
—Show verbatim quote (Table 2)2019 3.949,80 96,00 234,00 40,20 0,00 214,80 | Not classifiable from the report | Lost time | 96.0 menit | Single extractor |
—Show verbatim quote (Table 2)2020 1.045,80 54,00 0,00 217,20 0,00 390,00 | Not classifiable from the report | Lost time | 54.0 menit | Single extractor |
—Show verbatim quote (Table 2)2021 1.281,00 0,00 1.096,80 0,00 0,00 2.172,00 | Not classifiable from the report | Lost time | 0 menit | Single extractor |
—Show verbatim quote (Table 5)2017 99,79% 79,57% 100,00% 79,40% | none | Availability | 99.8 % | Single extractor |
—Show verbatim quote (Table 5)2017 99,79% 79,57% 100,00% 79,40% | none | Performance | 79.6 % | Single extractor |
—Show verbatim quote (Table 5)2017 99,79% 79,57% 100,00% 79,40% | none | Quality | 100 % | Single extractor |
—Show verbatim quote (Table 5)2018 97,29% 78,60% 100,00% 76,47% | none | Availability | 97.3 % | Single extractor |
—Show verbatim quote (Table 5)2018 97,29% 78,60% 100,00% 76,47% | none | Performance | 78.6 % | Single extractor |
—Show verbatim quote (Table 5)2019 99,86% 82,12% 100,00% 82,01% | none | Availability | 99.9 % | Single extractor |
—Show verbatim quote (Table 5)2019 99,86% 82,12% 100,00% 82,01% | none | Performance | 82.1 % | Single extractor |
—Show verbatim quote (Table 5)2020 100,00% 76,73% 100,00% 76,73% | none | Availability | 100 % | Single extractor |
—Show verbatim quote (Table 5)2020 100,00% 76,73% 100,00% 76,73% | none | Performance | 76.7 % | Single extractor |
—Show verbatim quote (Table 5)2021 99,26% 60,68% 100,00% 60,23% | none | Availability | 99.3 % | Single extractor |
—Show verbatim quote (Table 5)2021 99,26% 60,68% 100,00% 60,23% | none | Performance | 60.7 % | Single extractor |
—Show verbatim quote (Table 10)Breakdown Losses 1617 3,60% 3,60% | Equipment failure (breakdowns) | Lost time | 1,617 menit | Single extractor |
—Show verbatim quote (Table 10)Breakdown Losses 1617 3,60% 3,60% | Equipment failure (breakdowns) | Share of lost time | 3.60 % | Single extractor |
—Show verbatim quote (Table 10)Setup and Adjustment 0 0,00% 3,60% | Setup and adjustments | Lost time | 0 menit | Single extractor |
—Show verbatim quote (Table 10)Setup and Adjustment 0 0,00% 3,60% | Setup and adjustments | Share of lost time | 0 % | Single extractor |
—Show verbatim quote (Table 10)Idling and Minor Stoppges 592,56 1,32% 4,92% | Idling and minor stops (micro-stops) | Lost time | 593 menit | Single extractor |
—Show verbatim quote (Table 10)Idling and Minor Stoppges 592,56 1,32% 4,92% | Idling and minor stops (micro-stops) | Share of lost time | 1.32 % | Single extractor |
—Show verbatim quote (Table 10)Reduced Speed Losses 42669,75 95,08% 100,00% | Reduced speed | Lost time | 42,670 menit | Single extractor |
—Show verbatim quote (Table 10)Reduced Speed Losses 42669,75 95,08% 100,00% | Reduced speed | Share of lost time | 95.1 % | Single extractor |
—Show verbatim quote (Table 10)Reduced Yield 0 0,00% 100,00% | Start-up losses (reduced yield) | Lost time | 0 menit | Single extractor |
—Show verbatim quote (Table 10)Reduced Yield 0 0,00% 100,00% | Start-up losses (reduced yield) | Share of lost time | 0 % | Single extractor |
—Show verbatim quote (Table 10)Defect In Process 0 0,00% 100,00% | Process defects (scrap and rework) | Lost time | 0 menit | Single extractor |
—Show verbatim quote (Table 10)Defect In Process 0 0,00% 100,00% | Process defects (scrap and rework) | Share of lost time | 0 % | Single extractor |
—Show verbatim quote (Table 2)2017 967,20 1.550,40 469,20 25,20 0,00 109,80 | Not classifiable from the report | Lost time | 469 menit | Single extractor |
—Show verbatim quote (Table 2)2018 3.553,20 916,80 6.285,00 271,20 37,80 76,20 | Not classifiable from the report | Lost time | 6,285 menit | Single extractor |
—Show verbatim quote (Table 2)2019 3.949,80 96,00 234,00 40,20 0,00 214,80 | Not classifiable from the report | Lost time | 234 menit | Single extractor |
—Show verbatim quote (Table 2)2020 1.045,80 54,00 0,00 217,20 0,00 390,00 | Not classifiable from the report | Lost time | 0 menit | Single extractor |
—Show verbatim quote (Table 2)2021 1.281,00 0,00 1.096,80 0,00 0,00 2.172,00 | Not classifiable from the report | Lost time | 1,097 menit | Single extractor |
—Show verbatim quote (Table 6)2017 99,99% 79,40% 100,00% 79,40% | none | Availability | 100.0 % | Single extractor |
—Show verbatim quote (Table 6)2017 99,99% 79,40% 100,00% 79,40% | none | Performance | 79.4 % | Single extractor |
—Show verbatim quote (Table 6)2017 99,99% 79,40% 100,00% 79,40% | none | Quality | 100 % | Single extractor |
—Show verbatim quote (Table 6)2018 99,88% 76,56% 100,00% 76,47% | none | Availability | 99.9 % | Single extractor |
—Show verbatim quote (Table 6)2018 99,88% 76,56% 100,00% 76,47% | none | Performance | 76.6 % | Single extractor |
—Show verbatim quote (Table 6)2019 99,98% 82,03% 100,00% 82,01% | none | Availability | 100.0 % | Single extractor |
—Show verbatim quote (Table 6)2019 99,98% 82,03% 100,00% 82,01% | none | Performance | 82.0 % | Single extractor |
—Show verbatim quote (Table 6)2020 99,85% 76,84% 100,00% 76,73% | none | Availability | 99.9 % | Single extractor |
—Show verbatim quote (Table 6)2020 99,85% 76,84% 100,00% 76,73% | none | Performance | 76.8 % | Single extractor |
—Show verbatim quote (Table 6)2021 100,00% 60,23% 100,00% 60,23% | none | Availability | 100 % | Single extractor |
—Show verbatim quote (Table 6)2021 100,00% 60,23% 100,00% 60,23% | none | Performance | 60.2 % | Single extractor |
—Show verbatim quote (Table 11)Breakdown Losses 110,76 0,25% 0,25% | Equipment failure (breakdowns) | Lost time | 111 menit | Single extractor |
—Show verbatim quote (Table 11)Breakdown Losses 110,76 0,25% 0,25% | Equipment failure (breakdowns) | Share of lost time | 0.250 % | Single extractor |
—Show verbatim quote (Table 11)Setup and Adjustment 0 0,00% 0,25% | Setup and adjustments | Lost time | 0 menit | Single extractor |
—Show verbatim quote (Table 11)Setup and Adjustment 0 0,00% 0,25% | Setup and adjustments | Share of lost time | 0 % | Single extractor |
—Show verbatim quote (Table 11)Idling and Minor Stoppges 592,56 1,32% 1,57% | Idling and minor stops (micro-stops) | Lost time | 593 menit | Single extractor |
—Show verbatim quote (Table 11)Idling and Minor Stoppges 592,56 1,32% 1,57% | Idling and minor stops (micro-stops) | Share of lost time | 1.32 % | Single extractor |
—Show verbatim quote (Table 11)Reduced Speed Losses 44175,99 98,43% 100,00% | Reduced speed | Lost time | 44,176 menit | Single extractor |
—Show verbatim quote (Table 11)Reduced Speed Losses 44175,99 98,43% 100,00% | Reduced speed | Share of lost time | 98.4 % | Single extractor |
—Show verbatim quote (Table 11)Reduced Yield 0 0,00% 100,00% | Start-up losses (reduced yield) | Lost time | 0 menit | Single extractor |
—Show verbatim quote (Table 11)Reduced Yield 0 0,00% 100,00% | Start-up losses (reduced yield) | Share of lost time | 0 % | Single extractor |
—Show verbatim quote (Table 11)Defect In Process 0 0,00% 100,00% | Process defects (scrap and rework) | Lost time | 0 menit | Single extractor |
—Show verbatim quote (Table 11)Defect In Process 0 0,00% 100,00% | Process defects (scrap and rework) | Share of lost time | 0 % | Single extractor |
—Show verbatim quote (Table 2)2017 967,20 1.550,40 469,20 25,20 0,00 109,80 | Not classifiable from the report | Lost time | 25.2 menit | Single extractor |
—Show verbatim quote (Table 2)2018 3.553,20 916,80 6.285,00 271,20 37,80 76,20 | Not classifiable from the report | Lost time | 271 menit | Single extractor |
—Show verbatim quote (Table 2)2019 3.949,80 96,00 234,00 40,20 0,00 214,80 | Not classifiable from the report | Lost time | 40.2 menit | Single extractor |
—Show verbatim quote (Table 2)2020 1.045,80 54,00 0,00 217,20 0,00 390,00 | Not classifiable from the report | Lost time | 217 menit | Single extractor |
—Show verbatim quote (Table 2)2021 1.281,00 0,00 1.096,80 0,00 0,00 2.172,00 | Not classifiable from the report | Lost time | 0 menit | Single extractor |
—Show verbatim quote (Table 7)2017 100,00% 79,40% 100,00% 79,40% | none | Availability | 100 % | Single extractor |
—Show verbatim quote (Table 7)2017 100,00% 79,40% 100,00% 79,40% | none | Performance | 79.4 % | Single extractor |
—Show verbatim quote (Table 7)2017 100,00% 79,40% 100,00% 79,40% | none | Quality | 100 % | Single extractor |
—Show verbatim quote (Table 7)2018 99,98% 76,48% 100,00% 76,47% | none | Availability | 100.0 % | Single extractor |
—Show verbatim quote (Table 7)2018 99,98% 76,48% 100,00% 76,47% | none | Performance | 76.5 % | Single extractor |
—Show verbatim quote (Table 7)2019 100,00% 82,01% 100,00% 82,01% | none | Performance | 82.0 % | Single extractor |
—Show verbatim quote (Table 7)2020 100,00% 76,73% 100,00% 76,73% | none | Performance | 76.7 % | Single extractor |
—Show verbatim quote (Table 7)2021 100,00% 60,23% 100,00% 60,23% | none | Performance | 60.2 % | Single extractor |
—Show verbatim quote (Table 12)Breakdown Losses 7,56 0,02% 0,02% | Equipment failure (breakdowns) | Lost time | 7.56 menit | Single extractor |
—Show verbatim quote (Table 12)Breakdown Losses 7,56 0,02% 0,02% | Equipment failure (breakdowns) | Share of lost time | 0.0200 % | Single extractor |
—Show verbatim quote (Table 12)Setup and Adjusment 0 0,00% 0,02% | Setup and adjustments | Lost time | 0 menit | Single extractor |
—Show verbatim quote (Table 12)Setup and Adjusment 0 0,00% 0,02% | Setup and adjustments | Share of lost time | 0 % | Single extractor |
—Show verbatim quote (Table 12)Idling and Minor Stoppges 592,56 1,32% 1,34% | Idling and minor stops (micro-stops) | Lost time | 593 menit | Single extractor |
—Show verbatim quote (Table 12)Idling and Minor Stoppges 592,56 1,32% 1,34% | Idling and minor stops (micro-stops) | Share of lost time | 1.32 % | Single extractor |
—Show verbatim quote (Table 12)Reduced Speed Losses 44279,19 98,66% 100,00% | Reduced speed | Lost time | 44,279 menit | Single extractor |
—Show verbatim quote (Table 12)Reduced Speed Losses 44279,19 98,66% 100,00% | Reduced speed | Share of lost time | 98.7 % | Single extractor |
—Show verbatim quote (Table 12)Reduced Yield 0 0,00% 100,00% | Start-up losses (reduced yield) | Lost time | 0 menit | Single extractor |
—Show verbatim quote (Table 12)Reduced Yield 0 0,00% 100,00% | Start-up losses (reduced yield) | Share of lost time | 0 % | Single extractor |
—Show verbatim quote (Table 12)Defect In Process 0 0,00% 100,00% | Process defects (scrap and rework) | Lost time | 0 menit | Single extractor |
—Show verbatim quote (Table 12)Defect In Process 0 0,00% 100,00% | Process defects (scrap and rework) | Share of lost time | 0 % | Single extractor |
—Show verbatim quote (Table 2)2017 967,20 1.550,40 469,20 25,20 0,00 109,80 | Not classifiable from the report | Lost time | 0 menit | Single extractor |
—Show verbatim quote (Table 2)2018 3.553,20 916,80 6.285,00 271,20 37,80 76,20 | Not classifiable from the report | Lost time | 37.8 menit | Single extractor |
Planned ShutdownShow verbatim quote (Table 1)2017 223.200,00 4.320,00 218.880,00 193.089,50 3.675,62 | Planned downtime (scheduled maintenance, breaks, no demand) | Lost time | 4,320 menit | Single extractor |
Non Productive TimeShow verbatim quote (Table 2)2017 967,20 1.550,40 469,20 25,20 0,00 109,80 | Organizational or external stops (material or personnel shortage, utilities outage) | Lost time | 110 menit | Single extractor |
Non Productive TimeShow verbatim quote (Table 2)2018 3.553,20 916,80 6.285,00 271,20 37,80 76,20 | Organizational or external stops (material or personnel shortage, utilities outage) | Lost time | 76.2 menit | Single extractor |
Non Productive TimeShow verbatim quote (Table 2)2019 3.949,80 96,00 234,00 40,20 0,00 214,80 | Organizational or external stops (material or personnel shortage, utilities outage) | Lost time | 215 menit | Single extractor |
Non Productive TimeShow verbatim quote (Table 2)2020 1.045,80 54,00 0,00 217,20 0,00 390,00 | Organizational or external stops (material or personnel shortage, utilities outage) | Lost time | 390 menit | Single extractor |
Non Productive TimeShow verbatim quote (Table 2)2021 1.281,00 0,00 1.096,80 0,00 0,00 2.172,00 | Organizational or external stops (material or personnel shortage, utilities outage) | Lost time | 2,172 menit | Single extractor |
Observation units
- St. Puteran · Separation (centrifugation, filtration, membranes) · Baseline
- St. Masakan · Cooking and frying · Baseline
- St. Penguapan · Evaporation · Baseline
- St. Pemurnian · Separation (centrifugation, filtration, membranes) · Baseline
- St. Gilingan · Milling and grinding · Baseline
- PG Pandjie (keseluruhan) · Whole line or unspecified equipment · Baseline