In short
It appears in about 1 of every 100 lines studied.
When it appears, it takes on average about 57 % of the line's lost time. Reported by 2 of the 127 studies that could observe it (limited evidence).
What happens
The line is deliberately stopped as part of the production schedule, for example during periods of no demand, holidays, shift gaps or planned maintenance windows, with no equipment malfunction involved. The stop is anticipated and built into the operating calendar rather than triggered by a process event.
What is done about it
Ensure the stop is correctly flagged as planned downtime in the scheduling and MES systems so it is excluded from availability loss calculations, and use the window efficiently for maintenance, cleaning or changeover preparation to minimize its impact on subsequent startup.
Practical guidance written from engineering knowledge; it is not a statistical estimate.
1Probability and evidence
- Probability of presence
- 0.8% [0.2–1.9%]
- Expected share of lost time
- 0.4% [0.1–1.1%]
- Share of lost time when present
- 57% [45–68%]
- Studies / units
- 127 / 161
- Evidence grade
- C
Grade C: 2 to 4 studies, or an interval wider than 0.35.
2Probability by segment
- Dairy products0.8% [0.1–2.8%]13 studies
- Soft drinks, bottled water and juices1.0% [0.2–3.1%]26 studies
- Brewing, wine and spirits0.8% [0.1–2.9%]11 studies
- Bakery and pasta0.8% [0.1–2.5%]24 studies
- Meat, poultry and seafood0.8% [0.1–2.9%]9 studies
- Fruit and vegetable processing0.9% [0.1–3.1%]7 studies
- Grain and oilseed milling0.9% [0.1–3.0%]6 studies
- Sugar and confectionery1.2% [0.2–4.3%]9 studies
- Snacks, coffee, tea and other foods0.8% [0.1–3.0%]5 studies
- Animal feed and pet food0.9% [0.1–3.2%]7 studies
- Food manufacturing (unspecified or mixed)0.9% [0.1–3.1%]10 studies
3Mechanism, SCADA signature and countermeasure
Mechanism
Engineering guidanceThe line is deliberately stopped as part of the production schedule, for example during periods of no demand, holidays, shift gaps or planned maintenance windows, with no equipment malfunction involved. The stop is anticipated and built into the operating calendar rather than triggered by a process event.
How it looks in SCADA data
Engineering guidanceMES/SCADA shows a long machine-off or idle state that coincides with the planned production calendar, with no preceding fault alarms, no fault codes logged, and no material or utility shortage flags; the stop start and end times typically align with shift boundaries or scheduled maintenance entries.
Countermeasure
Engineering guidanceEnsure the stop is correctly flagged as planned downtime in the scheduling and MES systems so it is excluded from availability loss calculations, and use the window efficiently for maintenance, cleaning or changeover preparation to minimize its impact on subsequent startup.
4Sources
- IMPLEMENTASI 5R+1S SEBAGAI UPAYA PENINGKATAN EFEKTIVITAS PRODUKSI DENGAN METODE OVERALL EQUIPMENT EFFECTIVENESS (OEE) DI PT. COCA-COLA BOTTLING INDONESIA (2018)Open sourceLost time: 2,171 menit · as reported: “Schedule Shutdown”
Show verbatim quote
Juni 992 2.171 6.164
- IMPLEMENTASI 5R+1S SEBAGAI UPAYA PENINGKATAN EFEKTIVITAS PRODUKSI DENGAN METODE OVERALL EQUIPMENT EFFECTIVENESS (OEE) DI PT. COCA-COLA BOTTLING INDONESIA (2018)Open sourceLost time: 6,341 menit · as reported: “Schedule Shutdown”
Show verbatim quote
Mei 980 6.341 4.452
- IMPLEMENTASI 5R+1S SEBAGAI UPAYA PENINGKATAN EFEKTIVITAS PRODUKSI DENGAN METODE OVERALL EQUIPMENT EFFECTIVENESS (OEE) DI PT. COCA-COLA BOTTLING INDONESIA (2018)Open sourceLost time: 8,680 menit · as reported: “Schedule Shutdown”
Show verbatim quote
April 1.599 8.680 5.376
- IMPLEMENTASI 5R+1S SEBAGAI UPAYA PENINGKATAN EFEKTIVITAS PRODUKSI DENGAN METODE OVERALL EQUIPMENT EFFECTIVENESS (OEE) DI PT. COCA-COLA BOTTLING INDONESIA (2018)Open sourceLost time: 14,278 menit · as reported: “Schedule Shutdown”
Show verbatim quote
Maret 1.957 14.278 1.707
- IMPLEMENTASI 5R+1S SEBAGAI UPAYA PENINGKATAN EFEKTIVITAS PRODUKSI DENGAN METODE OVERALL EQUIPMENT EFFECTIVENESS (OEE) DI PT. COCA-COLA BOTTLING INDONESIA (2018)Open sourceLost time: 10,424 menit · as reported: “Schedule Shutdown”
Show verbatim quote
Februari 2.051 10.424 1.098
- IMPLEMENTASI 5R+1S SEBAGAI UPAYA PENINGKATAN EFEKTIVITAS PRODUKSI DENGAN METODE OVERALL EQUIPMENT EFFECTIVENESS (OEE) DI PT. COCA-COLA BOTTLING INDONESIA (2018)Open sourceLost time: 13,731 menit · as reported: “Schedule Shutdown”
Show verbatim quote
Januari 1.278 13.731 929
- IMPLEMENTASI 5R+1S SEBAGAI UPAYA PENINGKATAN EFEKTIVITAS PRODUKSI DENGAN METODE OVERALL EQUIPMENT EFFECTIVENESS (OEE) DI PT. COCA-COLA BOTTLING INDONESIA (2018)Open sourceLost time: 9,274 menit · as reported: “Schedule Shutdown”
Show verbatim quote
Desember 986 9.274 9.307
- IMPLEMENTASI 5R+1S SEBAGAI UPAYA PENINGKATAN EFEKTIVITAS PRODUKSI DENGAN METODE OVERALL EQUIPMENT EFFECTIVENESS (OEE) DI PT. COCA-COLA BOTTLING INDONESIA (2018)Open sourceLost time: 8,213 menit · as reported: “Schedule Shutdown”
Show verbatim quote
Oktober 1.687 8.213 15.131
- IMPLEMENTASI 5R+1S SEBAGAI UPAYA PENINGKATAN EFEKTIVITAS PRODUKSI DENGAN METODE OVERALL EQUIPMENT EFFECTIVENESS (OEE) DI PT. COCA-COLA BOTTLING INDONESIA (2018)Open sourceLost time: 6,057 menit · as reported: “Schedule Shutdown”
Show verbatim quote
Agustus 1.120 6.057 16.715
- IMPLEMENTASI 5R+1S SEBAGAI UPAYA PENINGKATAN EFEKTIVITAS PRODUKSI DENGAN METODE OVERALL EQUIPMENT EFFECTIVENESS (OEE) DI PT. COCA-COLA BOTTLING INDONESIA (2018)Open sourceLost time: 8,963 menit · as reported: “Schedule Shutdown”
Show verbatim quote
Juli 1.025 8.963 14.174
- IMPLEMENTASI 5R+1S SEBAGAI UPAYA PENINGKATAN EFEKTIVITAS PRODUKSI DENGAN METODE OVERALL EQUIPMENT EFFECTIVENESS (OEE) DI PT. COCA-COLA BOTTLING INDONESIA (2018)Open sourceLost time: 12,412 menit · as reported: “Schedule Shutdown”
Show verbatim quote
September 1.768 12.412 9.943
- IMPLEMENTASI 5R+1S SEBAGAI UPAYA PENINGKATAN EFEKTIVITAS PRODUKSI DENGAN METODE OVERALL EQUIPMENT EFFECTIVENESS (OEE) DI PT. COCA-COLA BOTTLING INDONESIA (2018)Open sourceLost time: 12,512 menit · as reported: “Schedule Shutdown”
Show verbatim quote
November 788 12.512 9.670
- ANALISIS EFEKTIVITAS MESIN PRODUKSI GULA UNTUK MINIMALISASI PEMBOROSAN PADA PABRIK GULA PANDJIE SITUBONDO (2025)Open sourceLost time: 4,320 menit · as reported: “Planned Shutdown”
Show verbatim quote
2017 223.200,00 4.320,00 218.880,00 193.089,50 3.675,62