Operational improvement of the technological process in instant noodle production

Open source

1Bibliographic record

Authors
Serhii Yakymenko, Bohdan Pashchenko, Оксана Миколаївна Вашека
Year
2025
Venue
Ukrainian Journal of Food Science
Country
Ukraine
Segment
Bakery and pasta
Process family
Forming, baking and cooking
Study type
Simulation (input data only)
Extraction scope
Full text
Size
1 plants · 1 lines · — machines
Observation period
365 days
Data collection
manual_logs
Intervention
Show the setting as described by the study
The research was conducted at the facilities of a food market operator located in the Kyiv region.

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 11Moderate risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product or sector is given but the equipment or process is only partly described.1 / 2
Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events).2 / 2
How were loss data collected?Manual logs or maintenance records with unknown completeness.1 / 2
Are OEE, loading time and the loss categories defined explicitly?Formulae or definitions are given for the reported metrics, including what counts as planned time.2 / 2
Does the loss breakdown account for the total loss it claims to explain?Only the top causes are reported and the unexplained remainder can be computed.1 / 2
Is there evidence of selective reporting of favourable results?Intervention study in which baseline and post-intervention periods differ in length or method.1 / 2
Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked.1 / 2
Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result.2 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
—
Show verbatim quote (Overall equipment effectiveness section)
availability – 94.9 %, performance – 85.6 %, quality – 97.2 %, resulting in an overall OEE value of approximately 78.96 %
noneQuality97.2 %Both extractors agreed
—
Show verbatim quote (Overall equipment effectiveness section)
availability – 94.9 %, performance – 85.6 %, quality – 97.2 %, resulting in an overall OEE value of approximately 78.96 %
nonePerformance85.6 %Both extractors agreed
—
Show verbatim quote (Overall equipment effectiveness section)
availability – 94.9 %, performance – 85.6 %, quality – 97.2 %, resulting in an overall OEE value of approximately 78.96 %
noneAvailability94.9 %Both extractors agreed
—
Show verbatim quote (Overall equipment effectiveness section / Figure 1)
resulting in an overall OEE value of approximately 78.96 %. This value classifies equipment performance as acceptable
noneOEE79.0 %Both extractors agreed
quality control stage losses
Show verbatim quote (Overall equipment effectiveness section)
Losses at the quality control stage amounted to approximately 2.8 %, which is considered an acceptable level for high-volume continuous production in the food industry
Process defects (scrap and rework)Defect rate2.80 %Both extractors agreed
—
Show verbatim quote (Materials section)
the actual output reached 107 million units, of which 104 million met quality standards
noneThroughput107 million unitsSingle extractor
—
Show verbatim quote (Page 3, Materials section)
The total production period duration was 8.760 hours, of which 8.640 hours were allocated to operational cycles, and 120 hours were reserved for planned downtime not related to technical needs (e.g., holidays)
Planned downtime (scheduled maintenance, breaks, no demand)Lost time120 hSingle extractor
disruptions in external power supply or failures in specific equipment units
Show verbatim quote (Page 6, Time losses in the instant noodle production process section)
At the same time, an additional 419 hours of unplanned downtime were recorded due to disruptions in external power supply or failures in specific equipment units
Not classifiable from the reportLost time419 hSingle extractor

Observation units

  • Instant noodle production line · Whole line or unspecified equipment · Baseline