Included study
Operational improvement of the technological process in instant noodle production
1Bibliographic record
- Authors
- Serhii Yakymenko, Bohdan Pashchenko, Оксана Миколаївна Вашека
- Year
- 2025
- Venue
- Ukrainian Journal of Food Science
- Country
- Ukraine
- Segment
- Bakery and pasta
- Process family
- Forming, baking and cooking
- Study type
- Simulation (input data only)
- Extraction scope
- Full text
- Size
- 1 plants · 1 lines · — machines
- Observation period
- 365 days
- Data collection
- manual_logs
- Intervention
Show the setting as described by the study
The research was conducted at the facilities of a food market operator located in the Kyiv region.
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 11Moderate risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product or sector is given but the equipment or process is only partly described. | 1 / 2 |
| Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events). | 2 / 2 |
| How were loss data collected?Manual logs or maintenance records with unknown completeness. | 1 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?Formulae or definitions are given for the reported metrics, including what counts as planned time. | 2 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?Only the top causes are reported and the unexplained remainder can be computed. | 1 / 2 |
| Is there evidence of selective reporting of favourable results?Intervention study in which baseline and post-intervention periods differ in length or method. | 1 / 2 |
| Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked. | 1 / 2 |
| Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result. | 2 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
—Show verbatim quote (Overall equipment effectiveness section)availability – 94.9 %, performance – 85.6 %, quality – 97.2 %, resulting in an overall OEE value of approximately 78.96 % | none | Quality | 97.2 % | Both extractors agreed |
—Show verbatim quote (Overall equipment effectiveness section)availability – 94.9 %, performance – 85.6 %, quality – 97.2 %, resulting in an overall OEE value of approximately 78.96 % | none | Performance | 85.6 % | Both extractors agreed |
—Show verbatim quote (Overall equipment effectiveness section)availability – 94.9 %, performance – 85.6 %, quality – 97.2 %, resulting in an overall OEE value of approximately 78.96 % | none | Availability | 94.9 % | Both extractors agreed |
—Show verbatim quote (Overall equipment effectiveness section / Figure 1)resulting in an overall OEE value of approximately 78.96 %. This value classifies equipment performance as acceptable | none | OEE | 79.0 % | Both extractors agreed |
quality control stage lossesShow verbatim quote (Overall equipment effectiveness section)Losses at the quality control stage amounted to approximately 2.8 %, which is considered an acceptable level for high-volume continuous production in the food industry | Process defects (scrap and rework) | Defect rate | 2.80 % | Both extractors agreed |
—Show verbatim quote (Materials section)the actual output reached 107 million units, of which 104 million met quality standards | none | Throughput | 107 million units | Single extractor |
—Show verbatim quote (Page 3, Materials section)The total production period duration was 8.760 hours, of which 8.640 hours were allocated to operational cycles, and 120 hours were reserved for planned downtime not related to technical needs (e.g., holidays) | Planned downtime (scheduled maintenance, breaks, no demand) | Lost time | 120 h | Single extractor |
disruptions in external power supply or failures in specific equipment unitsShow verbatim quote (Page 6, Time losses in the instant noodle production process section)At the same time, an additional 419 hours of unplanned downtime were recorded due to disruptions in external power supply or failures in specific equipment units | Not classifiable from the report | Lost time | 419 h | Single extractor |
Observation units
- Instant noodle production line · Whole line or unspecified equipment · Baseline