Analisis Efektivitas Total Productive Maintenance (TPM) Dengan Menggunakan Metode Overall Equipment Effectiveness pada Mesin Hidrolik di SMK SMTI Makassar
1Bibliographic record
- Authors
- Wahyudi Rusydi, Takdir Alisyahbana, Ahmad Padhil
- Year
- 2025
- Venue
- Cerdika Jurnal Ilmiah Indonesia
- Country
- Indonesia
- Segment
- Food manufacturing (unspecified or mixed)
- Process family
- Slaughter, cutting and primary processing
- Study type
- Single case study
- Extraction scope
- Abstract only
- Size
- 1 plants · — lines · 1 machines
- Observation period
- —
- Data collection
- not_reported
- Intervention
Show the setting as described by the study
SMK SMTI Makassar adalah salah satu sekolah di Makassar yang memiliki pabrik pengolahan rumput laut.
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 5High risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product or sector is given but the equipment or process is only partly described. | 1 / 2 |
| Is the observation period long enough and reported?Period not reported. | 0 / 2 |
| How were loss data collected?Interviews, estimates, or method not reported. | 0 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?No definition; metrics are reported as bare numbers. | 0 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?Only selected causes are reported and the total is unknown. | 0 / 2 |
| Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method. | 2 / 2 |
| Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked. | 1 / 2 |
| Could conflicts of interest or the source of the data bias the result?Authors are employees of the plant or of an equipment/software vendor; no declaration. | 1 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
—mesin hidrolikShow verbatim quote (Abstract)Hasil perhitungan menunjukkan bahwa nilai OEE pada mesin hidrolik adalah sebesar 63%, yang termasuk dalam kategori sedang dan belum mencapai standar kelas dunia (85%). | none | OEE | 63.0 % | Both extractors agreed |
total kerugian produksi (six big losses)mesin hidrolikShow verbatim quote (Abstract)Analisis Six Big Losses mengidentifikasi bahwa total kerugian produksi mencapai 34,80%, dengan penyebab dominan berupa reduced speed losses sebesar 24,67%. | Not classifiable from the report | Share of lost time | 34.8 % | Single extractor |
reduced speed lossesmesin hidrolikShow verbatim quote (Abstract)Analisis Six Big Losses mengidentifikasi bahwa total kerugian produksi mencapai 34,80%, dengan penyebab dominan berupa reduced speed losses sebesar 24,67%. | Reduced speed | Share of lost time | 24.7 % | Single extractor |
—Mesin HidrolikShow verbatim quote (Abstract)Analisis Six Big Losses mengidentifikasi bahwa total kerugian produksi mencapai 34,80% | Not classifiable from the report | Share of planned time | 34.8 % | Single extractor |
—Mesin HidrolikShow verbatim quote (Abstract)reduced speed losses sebesar 24,67% | Reduced speed | Share of planned time | 24.7 % | Single extractor |
Observation units
- Mesin Hidrolik · Whole line or unspecified equipment · Baseline
- Hydraulic Machine · Whole line or unspecified equipment · Baseline