Included study
Analisis Efisiensi Dan Produktivitas Mesin Produksi Keripik Telur Cumi (Keritcu)
1Bibliographic record
- Authors
- Pahreza Yawenda, Husman Husman, Ilham Ary Wahyudie
- Year
- 2025
- Venue
- Jurnal Inovasi Teknologi Terapan
- Country
- Indonesia
- Segment
- Snacks, coffee, tea and other foods
- Process family
- Whole plant or unspecified
- Study type
- Single case study
- Extraction scope
- Full text
- Size
- 1 plants · 1 lines · 1 machines
- Observation period
- —
- Data collection
- manual_logs
- Intervention
Show the setting as described by the study
Berdasarkan pengamatan di pabrik keritcu milik Ibu Erin, proses pembuatan keritcu masih dilakukan secara manual, memerlukan tenaga kedua tangan dan waktu yang cukup lama.
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 8Moderate risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product or sector is given but the equipment or process is only partly described. | 1 / 2 |
| Is the observation period long enough and reported?Period not reported. | 0 / 2 |
| How were loss data collected?Manual logs or maintenance records with unknown completeness. | 1 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?Formulae or definitions are given for the reported metrics, including what counts as planned time. | 2 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?Only selected causes are reported and the total is unknown. | 0 / 2 |
| Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method. | 2 / 2 |
| Are the reported numbers internally consistent?Inconsistencies above 10 percentage points, or OEE factors above 100%. | 0 / 2 |
| Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result. | 2 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
—Show verbatim quote (Hasil dan Pembahasan - Analisis OEE)Availability: 360 𝑀𝑒𝑛𝑖𝑡 480 𝑀𝑒𝑛𝑖𝑡 𝑥 100 = 75% | none | Availability | 75.0 % | Both extractors agreed |
—Show verbatim quote (Pembahasan Analisis point 4)Quality berada di angka 90%, menunjukkan tingkat reject produk sebesar 10%. | none | Quality | 90.0 % | Both extractors agreed |
—Show verbatim quote (Abstrak)Hasil menunjukkan efisiensi mesin sebesar 75% dengan produktivitas rata-rata 2,5 kg/jam. | none | Throughput | 2.50 kg/jam | Both extractors agreed |
—Show verbatim quote (Pembahasan Analisis - Produktivitas Mesin)Produktivitas mencapai 2.5 kg/jam, Mesin hanya memanfaatkan 66.7% dari potensi maksimumnya. | none | Performance | 66.7 % | Both extractors agreed |
—Show verbatim quote (Abstrak/Simpulan)Nilai OEE sebesar 45% berada di bawah standar industri ideal (>85%). | none | OEE | 45.0 % | Both extractors agreed |
reject produkShow verbatim quote (Pembahasan Analisis point 3)Tingkat reject produk mencapai 10%, yang cukup signifikan untuk diperbaiki. | Process defects (scrap and rework) | Defect rate | 10.0 % | Both extractors agreed |
—Show verbatim quote (Hasil dan Pembahasan - Analisis OEE, Performance)𝑂𝑢𝑡𝑝𝑢𝑡 𝑝𝑟𝑜𝑑𝑢𝑘𝑠𝑖 𝑎𝑘𝑡𝑢𝑎𝑙 𝑘𝑎𝑝𝑎𝑠𝑖𝑡𝑎𝑠 𝑝𝑟𝑜𝑑𝑢𝑘𝑠𝑖 𝑚𝑎𝑘𝑠𝑖𝑚𝑢𝑚 𝑝𝑎𝑑𝑎 𝑤𝑎𝑘𝑡𝑢 𝑒𝑓𝑒𝑘𝑡𝑖𝑓 20 30 𝑥 360 480 = 20 22.5 = 88.9 | none | Performance | 88.9 % | Single extractor |
Downtime mesinShow verbatim quote (Hasil Analisis - Data Operasional Mesin)Downtime mesin: 1 jam (60 menit). | Not classifiable from the report | Lost time | 60.0 menit | Single extractor |
—Show verbatim quote (Hasil Analisis - Data Operasional Mesin)Output produksi rata-rata: 20 kg/hari. | none | Throughput | 20.0 kg/hari | Single extractor |
—Show verbatim quote (Page 3, Data Operasional Mesin section)Downtime mesin: 1 jam (60 menit). | Not classifiable from the report | Lost time | 1.00 h | Single extractor |
—Show verbatim quote (Page 3, Perhitungan Efisiensi section)Efisiensi Mesin: waktu operasi efektif / waktu operasi total x 100 = 360 / 480 x 100% = 75% | none | Share of planned time | 75.0 % | Single extractor |
Observation units
- Mesin produksi keritcu · Whole line or unspecified equipment · Baseline
- Keritcu Production Machine · Whole line or unspecified equipment · Baseline