Enhancing Operational Effectiveness in a Beverage Bottling SME through SMED, 5S, and TPM Maintenance Practices
1Bibliographic record
- Authors
- Diana Stella Rossi-Huamán, Billy Manfred Tecse-Villacorta, Richard Nicholas Meza-Ortiz
- Year
- 2025
- Venue
- International Journal of Industrial Engineering
- Country
- Peru
- Segment
- Soft drinks, bottled water and juices
- Process family
- Filling and packaging line
- Study type
- Before/after intervention
- Extraction scope
- Full text
- Size
- 1 plants · 1 lines · — machines
- Observation period
- 120 days
- Data collection
- not_reported
- Intervention
Show the setting as described by the study
The company specializes in the production and commercialization of carbonated and energy drinks, sustaining more than twelve years of market presence.
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 11Moderate risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described. | 2 / 2 |
| Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events). | 2 / 2 |
| How were loss data collected?Interviews, estimates, or method not reported. | 0 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?No definition; metrics are reported as bare numbers. | 0 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?The reported causes or categories sum to at least 90% of the stated total, or an explicit "other" class closes the balance. | 2 / 2 |
| Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method. | 2 / 2 |
| Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked. | 1 / 2 |
| Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result. | 2 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
—Show verbatim quote (Section 4.3.4 TPM: Enhancing Reliability through Preventive and Autonomous Maintenance)Overall Equipment Effectiveness (OEE) rose from 61% to 79%, and the defect rate experienced a 22% contraction. | none | OEE | 79.0 % | Both extractors agreed |
—Show verbatim quote (Section 4.3.4 TPM: Enhancing Reliability through Preventive and Autonomous Maintenance)Overall Equipment Effectiveness (OEE) rose from 61% to 79%, and the defect rate experienced a 22% contraction. | none | OEE | 61.0 % | Both extractors agreed |
the necessity for product reprocessingShow verbatim quote (Section 4.2 Initial Diagnosis)Detailed decomposition of the shortfall reveals that parasitic machine velocity losses exert a 47% share on ineffective output, protracted repair durations 34%, and the necessity for product reprocessing 19%. | Process defects (scrap and rework) | Share of lost time | 19.0 % | Both extractors agreed |
protracted repair durationsShow verbatim quote (Section 4.2 Initial Diagnosis)Detailed decomposition of the shortfall reveals that parasitic machine velocity losses exert a 47% share on ineffective output, protracted repair durations 34%, and the necessity for product reprocessing 19%. | Equipment failure (breakdowns) | Share of lost time | 34.0 % | Both extractors agreed |
parasitic machine velocity lossesShow verbatim quote (Section 4.2 Initial Diagnosis)Detailed decomposition of the shortfall reveals that parasitic machine velocity losses exert a 47% share on ineffective output, protracted repair durations 34%, and the necessity for product reprocessing 19%. | Reduced speed | Share of lost time | 47.0 % | Both extractors agreed |
—Show verbatim quote (Table 2. Validation Results of the Lean-TPM Maintenance Model)Effectiveness % 68% 95% 90% 32.35% | none | Performance | 68.0 % | Single extractor |
—Show verbatim quote (Table 2. Validation Results of the Lean-TPM Maintenance Model)Effectiveness % 68% 95% 90% 32.35% | none | Performance | 90.0 % | Single extractor |
—Show verbatim quote (Section 4.3.4)The Mean Time Between Failures (MTBF) increased by 31% | Equipment failure (breakdowns) | Time between events | 31.0 % | Single extractor |
—Show verbatim quote (Section 4.3.4)The Mean Time to Repair (MTTR) decreased by 25% | Equipment failure (breakdowns) | Mean event duration | -25.0 % | Single extractor |
—Show verbatim quote (Section 4.3.4)The incidence of breakdowns decreased by 68% | Equipment failure (breakdowns) | Number of events | -68.0 % | Single extractor |
—Show verbatim quote (Section 4.3.4)the defect rate experienced a 22% contraction | Process defects (scrap and rework) | Defect rate | -22.0 % | Single extractor |
Observation units
- SME bottling line · Whole line or unspecified equipment · After intervention
- SME bottling line · Whole line or unspecified equipment · Baseline
- Bottling line · Whole line or unspecified equipment · After intervention