WORK SAMPLING METHODOLOGY AND ITS APPLICATION IN TIME STUDIES

Open source

1Bibliographic record

Authors
Dr Adekunle Ibrahim Musa
Year
2025
Venue
Journal of Engineering and Technology (JET)
Country
Nigeria
Segment
Soft drinks, bottled water and juices
Process family
Whole plant or unspecified
Study type
Single case study
Extraction scope
Abstract only
Size
1 plants · — lines · — machines
Observation period
21 days
Data collection
manual_logs
Intervention
Show the setting as described by the study
This research is about conducting work sampling in a Nigerian carbonated beverage organization to measure employee efficiency levels and identify time-consuming tasks, addressing the lack of local productivity statistics in Sub-Saharan Africa.

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 8Moderate risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?The setting cannot be classified beyond "a food company".0 / 2
Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events).2 / 2
How were loss data collected?Manual logs or maintenance records with unknown completeness.1 / 2
Are OEE, loading time and the loss categories defined explicitly?No definition; metrics are reported as bare numbers.0 / 2
Does the loss breakdown account for the total loss it claims to explain?The reported causes or categories sum to at least 90% of the stated total, or an explicit "other" class closes the balance.2 / 2
Is there evidence of selective reporting of favourable results?Intervention study in which baseline and post-intervention periods differ in length or method.1 / 2
Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked.1 / 2
Could conflicts of interest or the source of the data bias the result?Authors are employees of the plant or of an equipment/software vendor; no declaration.1 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
equipment mechanical issues
Show verbatim quote (Abstract)
60% of work time produced results but 30% was lost because materials needed to wait for 40% of the time and 10% stemmed from machine downtime where 50% resulted from equipment mechanical issues.
Equipment failure (breakdowns)Share of lost time50.0 %Both extractors agreed
—
Show verbatim quote (Abstract)
60% of work time produced results but 30% was lost because materials needed to wait for 40% of the time and 10% stemmed from machine downtime where 50% resulted from equipment mechanical issues.
Not classifiable from the reportShare of planned time30.0 %Adjudicated
materials needed to wait
Show verbatim quote (Abstract)
60% of work time produced results but 30% was lost because materials needed to wait for 40% of the time and 10% stemmed from machine downtime where 50% resulted from equipment mechanical issues.
Organizational or external stops (material or personnel shortage, utilities outage)Share of lost time40.0 %Single extractor
machine downtime
Show verbatim quote (Abstract)
60% of work time produced results but 30% was lost because materials needed to wait for 40% of the time and 10% stemmed from machine downtime where 50% resulted from equipment mechanical issues.
Equipment failure (breakdowns)Share of lost time10.0 %Single extractor
machine downtime
Show verbatim quote (Abstract)
10% stemmed from machine downtime
Equipment failure (breakdowns)Share of planned time10.0 %Single extractor

Observation units

  • Nigerian carbonated beverage organization (whole plant) · Whole line or unspecified equipment · Baseline
  • Carbonated beverage organization · Whole line or unspecified equipment · Baseline