foratvise
Get Started
Included study

Analysis of Filling Machine Effectiveness Using the Overall Equipment Effectiveness and Six Big Losses Method

Open source

1Bibliographic record

Authors
Yusuf Gustri Alfari, Hana Catur Wahyuni
Year
2025
Venue
—
Country
Indonesia
Segment
Food manufacturing (unspecified or mixed)
Process family
Filling and packaging line
Study type
Single case study
Extraction scope
Full text
Size
1 plants · — lines · 1 machines
Observation period
—
Data collection
not_reported
Intervention
Show the setting as described by the study
PT. XYZ is a company that has a problem with one of its filling machines experiencing a process failure, resulting in waste.

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 3High risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?The setting cannot be classified beyond "a food company".0 / 2
Is the observation period long enough and reported?Period not reported.0 / 2
How were loss data collected?Interviews, estimates, or method not reported.0 / 2
Are OEE, loading time and the loss categories defined explicitly?No definition; metrics are reported as bare numbers.0 / 2
Does the loss breakdown account for the total loss it claims to explain?Only selected causes are reported and the total is unknown.0 / 2
Is there evidence of selective reporting of favourable results?Intervention study in which baseline and post-intervention periods differ in length or method.1 / 2
Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked.1 / 2
Could conflicts of interest or the source of the data bias the result?Authors are employees of the plant or of an equipment/software vendor; no declaration.1 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
—
Show verbatim quote (Abstract)
The OEE calculation results show a value of 73.748%.
noneOEE73.7 %Single extractor
machine damage
Show verbatim quote (Abstract)
losses due to machine damage with a losses value of 9.389%
Equipment failure (breakdowns)Share of planned time9.39 %Single extractor
equipment operating below standard speed
Show verbatim quote (Abstract)
losses due to equipment operating below standard speed with a losses value of 6.770%.
Reduced speedShare of planned time6.77 %Single extractor

Observation units

  • Filling Machine · Filling · Baseline