Included study
Optimizing Side Guard Angles on Multi-to-Single Conveyors to Minimize Infeed Stuck and Increase Overall Equipment Effectiveness
1Bibliographic record
- Authors
- Lusianawati, Muchamad Malik, Wardatul Jannah
- Year
- 2026
- Venue
- JURUTERA - Jurnal Umum Teknik Terapan
- Country
- Indonesia
- Segment
- Soft drinks, bottled water and juices
- Process family
- Filling and packaging line
- Study type
- Before/after intervention
- Extraction scope
- Full text
- Size
- 1 plants · 1 lines · 1 machines
- Observation period
- 5 days
- Data collection
- manual_logs
- Intervention
Show the setting as described by the study
At PT XYZ, frequent empty-can jamming (infeed stuck) in the multi-to-single conveyor section caused significant filler machine downtime and reduced production efficiency.
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 14Low risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described. | 2 / 2 |
| Is the observation period long enough and reported?Period reported but shorter than 30 days, or only the number of shifts is given. | 1 / 2 |
| How were loss data collected?Manual logs or maintenance records with unknown completeness. | 1 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?Formulae or definitions are given for the reported metrics, including what counts as planned time. | 2 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?The reported causes or categories sum to at least 90% of the stated total, or an explicit "other" class closes the balance. | 2 / 2 |
| Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method. | 2 / 2 |
| Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points. | 2 / 2 |
| Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result. | 2 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
—filler machineShow verbatim quote (Tabel 2)Kecepatan Aktual (kaleng/jam) 36.300 47.760 +11.460 kaleng/jam | none | Throughput | 47,760 kaleng/jam | Both extractors agreed |
Infeed Stuckmulti-to-single conveyor / side guard (combiner plow)Show verbatim quote (Tabel 2)Infeed Stuck (menit) 128,0 73,1 -54,9 menit | Idling and minor stops (micro-stops) | Lost time | 73.1 menit | Both extractors agreed |
—Show verbatim quote (Tabel 2)Overall Equipment Effectiveness (OEE) 55,36% 83,92% +28,56% | none | OEE | 55.4 % | Both extractors agreed |
—Show verbatim quote (Tabel 2)Quality (Tingkat Kualitas) 99,82% 99,98% +0,16% | none | Quality | 99.8 % | Both extractors agreed |
—Show verbatim quote (Tabel 2)Performance (Efisiensi Kinerja) 75,63% 99,50% +23,87% | none | Performance | 75.6 % | Both extractors agreed |
—Show verbatim quote (Tabel 2)Availability (Ketersediaan) 73,33% 84,77% +11,44% | none | Availability | 73.3 % | Both extractors agreed |
—filler machineShow verbatim quote (Tabel 2)Kecepatan Aktual (kaleng/jam) 36.300 47.760 +11.460 kaleng/jam | none | Throughput | 36,300 kaleng/jam | Both extractors agreed |
Infeed Stuckmulti-to-single conveyor / side guard (combiner plow)Show verbatim quote (Tabel 2)Infeed Stuck (menit) 128,0 73,1 -54,9 menit | Idling and minor stops (micro-stops) | Lost time | 128 menit | Both extractors agreed |
—Show verbatim quote (Tabel 2)Quality (Tingkat Kualitas) 99,82% 99,98% +0,16% | none | Quality | 100.0 % | Both extractors agreed |
—Show verbatim quote (Tabel 2)Overall Equipment Effectiveness (OEE) 55,36% 83,92% +28,56% | none | OEE | 83.9 % | Both extractors agreed |
Produk Cacat / Rejectmulti-to-single conveyor / fillerShow verbatim quote (Tabel 2)Produk Cacat / Reject (kaleng) 65 9 -56 kaleng | Process defects (scrap and rework) | Number of events | 9.00 kaleng | Both extractors agreed |
Produk Cacat / Rejectmulti-to-single conveyor / fillerShow verbatim quote (Tabel 2)Produk Cacat / Reject (kaleng) 65 9 -56 kaleng | Process defects (scrap and rework) | Number of events | 65.0 kaleng | Both extractors agreed |
—Show verbatim quote (Tabel 2)Availability (Ketersediaan) 73,33% 84,77% +11,44% | none | Availability | 84.8 % | Single extractor |
—Show verbatim quote (Tabel 2)Performance (Efisiensi Kinerja) 75,63% 99,50% +23,87% | none | Performance | 99.5 % | Single extractor |
Observation units
- Multi-to-single conveyor / filler line (PT XYZ), side guard 2° · Conveying and accumulation · After intervention
- Multi-to-single conveyor / filler line (PT XYZ), side guard 3° · Conveying and accumulation · Baseline