Included study
Analisis Overall Equipment Effectiveness (OEE) dan Evaluasi Proses Cleaning menggunakan Metode ERCS (Eliminate, Reduce, Combine, Simplify) untuk Peningkatan Efektivitas Produksi di PT Yili Indonesia Dairy
1Bibliographic record
- Authors
- Monang Aprinda Putra, Erwin Widodo
- Year
- 2026
- Venue
- Jurnal Multidisiplin Indonesia
- Country
- Indonesia
- Segment
- Dairy products
- Process family
- Filling and packaging line
- Study type
- Before/after intervention
- Extraction scope
- Full text
- Size
- 1 plants · 1 lines · — machines
- Observation period
- 26 days
- Data collection
- manual_logs
- Intervention
Show the setting as described by the study
Penelitian ini merupakan praktik keinsinyuran yang dilaksanakan di lini produksi PT Yili Indonesia Dairy dengan fokus menganalisis pengaruh durasi cleaning process terhadap nilai Overall Equipment Effectiveness (OEE).
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 12Moderate risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described. | 2 / 2 |
| Is the observation period long enough and reported?Period reported but shorter than 30 days, or only the number of shifts is given. | 1 / 2 |
| How were loss data collected?Manual logs or maintenance records with unknown completeness. | 1 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?Formulae or definitions are given for the reported metrics, including what counts as planned time. | 2 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?The reported causes or categories sum to at least 90% of the stated total, or an explicit "other" class closes the balance. | 2 / 2 |
| Is there evidence of selective reporting of favourable results?Intervention study in which baseline and post-intervention periods differ in length or method. | 1 / 2 |
| Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points. | 2 / 2 |
| Could conflicts of interest or the source of the data bias the result?Authors are employees of the plant or of an equipment/software vendor; no declaration. | 1 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
—Show verbatim quote (Kesimpulan)dan nilai rata-rata Quality sebesar 99,24%. | none | Quality | 99.2 % | Both extractors agreed |
—Show verbatim quote (Kesimpulan)nilai rata-rata Performance sebesar 97,60%, dan nilai rata-rata Quality sebesar 99,24%. | none | Performance | 97.6 % | Both extractors agreed |
—Show verbatim quote (Kesimpulan)Berdasarkan hasil perhitungan terhadap delapan cycle produksi, diperoleh nilai rata-rata Availability sebesar 84,18%, nilai rata-rata Performance sebesar 97,60%, dan nilai rata-rata Quality sebesar 99,24%. | none | Availability | 84.2 % | Both extractors agreed |
CleaningShow verbatim quote (Kesimpulan)Berdasarkan ujicoba, durasi cleaning menurun dari rata-rata 4,78 jam menjadi 3,75 jam atau berpotensi mengalami penurunan sebesar 21,55%. | Planned downtime (scheduled maintenance, breaks, no demand) | Lost time | 4.78 jam | Both extractors agreed |
—Show verbatim quote (Kesimpulan)Dari ketiga komponen tersebut diperoleh nilai rata-rata Overall Equipment Effectiveness (OEE) sebesar 81,54%. | none | OEE | 81.5 % | Both extractors agreed |
BreakdownShow verbatim quote (Tabel 1. Data Hasil Observasi.)1 05/01/2026 07/01/26 21,2 40 3,00 5,67 38660 | Equipment failure (breakdowns) | Lost time | 3.00 jam | Single extractor |
CleaningShow verbatim quote (Tabel 1. Data Hasil Observasi.)1 05/01/2026 07/01/26 21,2 40 3,00 5,67 38660 | Planned downtime (scheduled maintenance, breaks, no demand) | Lost time | 5.67 jam | Single extractor |
—Show verbatim quote (Tabel 1. Data Hasil Observasi.)1 05/01/2026 07/01/26 21,2 40 3,00 5,67 38660 | none | Throughput | 38,660 pcs | Single extractor |
BreakdownShow verbatim quote (Tabel 1. Data Hasil Observasi.)2 07/01/2026 09/01/26 21,2 40 0,83 4,67 42884 | Equipment failure (breakdowns) | Lost time | 0.830 jam | Single extractor |
CleaningShow verbatim quote (Tabel 1. Data Hasil Observasi.)2 07/01/2026 09/01/26 21,2 40 0,83 4,67 42884 | Planned downtime (scheduled maintenance, breaks, no demand) | Lost time | 4.67 jam | Single extractor |
—Show verbatim quote (Tabel 1. Data Hasil Observasi.)2 07/01/2026 09/01/26 21,2 40 0,83 4,67 42884 | none | Throughput | 42,884 pcs | Single extractor |
BreakdownShow verbatim quote (Tabel 1. Data Hasil Observasi.)3 12/01/2026 14/01/26 21,2 40 2,25 4,00 40930 | Equipment failure (breakdowns) | Lost time | 2.25 jam | Single extractor |
CleaningShow verbatim quote (Tabel 1. Data Hasil Observasi.)3 12/01/2026 14/01/26 21,2 40 2,25 4,00 40930 | Planned downtime (scheduled maintenance, breaks, no demand) | Lost time | 4.00 jam | Single extractor |
—Show verbatim quote (Tabel 1. Data Hasil Observasi.)3 12/01/2026 14/01/26 21,2 40 2,25 4,00 40930 | none | Throughput | 40,930 pcs | Single extractor |
BreakdownShow verbatim quote (Tabel 1. Data Hasil Observasi.)4 14/01/2026 16/01/26 21,2 40 3,13 5,52 39181 | Equipment failure (breakdowns) | Lost time | 3.13 jam | Single extractor |
CleaningShow verbatim quote (Tabel 1. Data Hasil Observasi.)4 14/01/2026 16/01/26 21,2 40 3,13 5,52 39181 | Planned downtime (scheduled maintenance, breaks, no demand) | Lost time | 5.52 jam | Single extractor |
—Show verbatim quote (Tabel 1. Data Hasil Observasi.)4 14/01/2026 16/01/26 21,2 40 3,13 5,52 39181 | none | Throughput | 39,181 pcs | Single extractor |
BreakdownShow verbatim quote (Tabel 1. Data Hasil Observasi.)5 19/01/2026 21/01/26 21,2 40 0,67 4,00 44438 | Equipment failure (breakdowns) | Lost time | 0.670 jam | Single extractor |
—Show verbatim quote (Tabel 1. Data Hasil Observasi.)5 19/01/2026 21/01/26 21,2 40 0,67 4,00 44438 | none | Throughput | 44,438 pcs | Single extractor |
BreakdownShow verbatim quote (Tabel 1. Data Hasil Observasi.)6 21/01/2026 23/01/26 21,2 40 1,17 3,65 42747 | Equipment failure (breakdowns) | Lost time | 1.17 jam | Single extractor |
CleaningShow verbatim quote (Tabel 1. Data Hasil Observasi.)6 21/01/2026 23/01/26 21,2 40 1,17 3,65 42747 | Planned downtime (scheduled maintenance, breaks, no demand) | Lost time | 3.65 jam | Single extractor |
—Show verbatim quote (Tabel 1. Data Hasil Observasi.)6 21/01/2026 23/01/26 21,2 40 1,17 3,65 42747 | none | Throughput | 42,747 pcs | Single extractor |
BreakdownShow verbatim quote (Tabel 1. Data Hasil Observasi.)7 26/01/2026 28/01/26 21,2 40 0,42 5,25 43266 | Equipment failure (breakdowns) | Lost time | 0.420 jam | Single extractor |
CleaningShow verbatim quote (Tabel 1. Data Hasil Observasi.)7 26/01/2026 28/01/26 21,2 40 0,42 5,25 43266 | Planned downtime (scheduled maintenance, breaks, no demand) | Lost time | 5.25 jam | Single extractor |
—Show verbatim quote (Tabel 1. Data Hasil Observasi.)7 26/01/2026 28/01/26 21,2 40 0,42 5,25 43266 | none | Throughput | 43,266 pcs | Single extractor |
BreakdownShow verbatim quote (Tabel 1. Data Hasil Observasi.)8 28/01/2026 30/01/26 21,2 40 0,92 5,50 42312 | Equipment failure (breakdowns) | Lost time | 0.920 jam | Single extractor |
CleaningShow verbatim quote (Tabel 1. Data Hasil Observasi.)8 28/01/2026 30/01/26 21,2 40 0,92 5,50 42312 | Planned downtime (scheduled maintenance, breaks, no demand) | Lost time | 5.50 jam | Single extractor |
—Show verbatim quote (Tabel 1. Data Hasil Observasi.)8 28/01/2026 30/01/26 21,2 40 0,92 5,50 42312 | none | Throughput | 42,312 pcs | Single extractor |
cleaning process after ERCS improvementsfilling lineShow verbatim quote (Kesimpulan)durasi cleaning menurun dari 4,78 jam menjadi 3,75 jam, atau berpotensi mengalami penurunan sebesar 21,55% | Planned downtime (scheduled maintenance, breaks, no demand) | Lost time | 3.75 h | Single extractor |
Observation units
- Ice cream production line (PT Yili Indonesia Dairy) · Whole line or unspecified equipment · Baseline
- Ice cream production line - post-intervention trial · Whole line or unspecified equipment · After intervention