Analisis Overall Equipment Effectiveness (OEE) dan Evaluasi Proses Cleaning menggunakan Metode ERCS (Eliminate, Reduce, Combine, Simplify) untuk Peningkatan Efektivitas Produksi di PT Yili Indonesia Dairy

Open source

1Bibliographic record

Authors
Monang Aprinda Putra, Erwin Widodo
Year
2026
Venue
Jurnal Multidisiplin Indonesia
Country
Indonesia
Segment
Dairy products
Process family
Filling and packaging line
Study type
Before/after intervention
Extraction scope
Full text
Size
1 plants · 1 lines · — machines
Observation period
26 days
Data collection
manual_logs
Intervention
Show the setting as described by the study
Penelitian ini merupakan praktik keinsinyuran yang dilaksanakan di lini produksi PT Yili Indonesia Dairy dengan fokus menganalisis pengaruh durasi cleaning process terhadap nilai Overall Equipment Effectiveness (OEE).

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 12Moderate risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described.2 / 2
Is the observation period long enough and reported?Period reported but shorter than 30 days, or only the number of shifts is given.1 / 2
How were loss data collected?Manual logs or maintenance records with unknown completeness.1 / 2
Are OEE, loading time and the loss categories defined explicitly?Formulae or definitions are given for the reported metrics, including what counts as planned time.2 / 2
Does the loss breakdown account for the total loss it claims to explain?The reported causes or categories sum to at least 90% of the stated total, or an explicit "other" class closes the balance.2 / 2
Is there evidence of selective reporting of favourable results?Intervention study in which baseline and post-intervention periods differ in length or method.1 / 2
Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points.2 / 2
Could conflicts of interest or the source of the data bias the result?Authors are employees of the plant or of an equipment/software vendor; no declaration.1 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
—
Show verbatim quote (Kesimpulan)
dan nilai rata-rata Quality sebesar 99,24%.
noneQuality99.2 %Both extractors agreed
—
Show verbatim quote (Kesimpulan)
nilai rata-rata Performance sebesar 97,60%, dan nilai rata-rata Quality sebesar 99,24%.
nonePerformance97.6 %Both extractors agreed
—
Show verbatim quote (Kesimpulan)
Berdasarkan hasil perhitungan terhadap delapan cycle produksi, diperoleh nilai rata-rata Availability sebesar 84,18%, nilai rata-rata Performance sebesar 97,60%, dan nilai rata-rata Quality sebesar 99,24%.
noneAvailability84.2 %Both extractors agreed
Cleaning
Show verbatim quote (Kesimpulan)
Berdasarkan ujicoba, durasi cleaning menurun dari rata-rata 4,78 jam menjadi 3,75 jam atau berpotensi mengalami penurunan sebesar 21,55%.
Planned downtime (scheduled maintenance, breaks, no demand)Lost time4.78 jamBoth extractors agreed
—
Show verbatim quote (Kesimpulan)
Dari ketiga komponen tersebut diperoleh nilai rata-rata Overall Equipment Effectiveness (OEE) sebesar 81,54%.
noneOEE81.5 %Both extractors agreed
Breakdown
Show verbatim quote (Tabel 1. Data Hasil Observasi.)
1 05/01/2026 07/01/26 21,2 40 3,00 5,67 38660
Equipment failure (breakdowns)Lost time3.00 jamSingle extractor
Cleaning
Show verbatim quote (Tabel 1. Data Hasil Observasi.)
1 05/01/2026 07/01/26 21,2 40 3,00 5,67 38660
Planned downtime (scheduled maintenance, breaks, no demand)Lost time5.67 jamSingle extractor
—
Show verbatim quote (Tabel 1. Data Hasil Observasi.)
1 05/01/2026 07/01/26 21,2 40 3,00 5,67 38660
noneThroughput38,660 pcsSingle extractor
Breakdown
Show verbatim quote (Tabel 1. Data Hasil Observasi.)
2 07/01/2026 09/01/26 21,2 40 0,83 4,67 42884
Equipment failure (breakdowns)Lost time0.830 jamSingle extractor
Cleaning
Show verbatim quote (Tabel 1. Data Hasil Observasi.)
2 07/01/2026 09/01/26 21,2 40 0,83 4,67 42884
Planned downtime (scheduled maintenance, breaks, no demand)Lost time4.67 jamSingle extractor
—
Show verbatim quote (Tabel 1. Data Hasil Observasi.)
2 07/01/2026 09/01/26 21,2 40 0,83 4,67 42884
noneThroughput42,884 pcsSingle extractor
Breakdown
Show verbatim quote (Tabel 1. Data Hasil Observasi.)
3 12/01/2026 14/01/26 21,2 40 2,25 4,00 40930
Equipment failure (breakdowns)Lost time2.25 jamSingle extractor
Cleaning
Show verbatim quote (Tabel 1. Data Hasil Observasi.)
3 12/01/2026 14/01/26 21,2 40 2,25 4,00 40930
Planned downtime (scheduled maintenance, breaks, no demand)Lost time4.00 jamSingle extractor
—
Show verbatim quote (Tabel 1. Data Hasil Observasi.)
3 12/01/2026 14/01/26 21,2 40 2,25 4,00 40930
noneThroughput40,930 pcsSingle extractor
Breakdown
Show verbatim quote (Tabel 1. Data Hasil Observasi.)
4 14/01/2026 16/01/26 21,2 40 3,13 5,52 39181
Equipment failure (breakdowns)Lost time3.13 jamSingle extractor
Cleaning
Show verbatim quote (Tabel 1. Data Hasil Observasi.)
4 14/01/2026 16/01/26 21,2 40 3,13 5,52 39181
Planned downtime (scheduled maintenance, breaks, no demand)Lost time5.52 jamSingle extractor
—
Show verbatim quote (Tabel 1. Data Hasil Observasi.)
4 14/01/2026 16/01/26 21,2 40 3,13 5,52 39181
noneThroughput39,181 pcsSingle extractor
Breakdown
Show verbatim quote (Tabel 1. Data Hasil Observasi.)
5 19/01/2026 21/01/26 21,2 40 0,67 4,00 44438
Equipment failure (breakdowns)Lost time0.670 jamSingle extractor
—
Show verbatim quote (Tabel 1. Data Hasil Observasi.)
5 19/01/2026 21/01/26 21,2 40 0,67 4,00 44438
noneThroughput44,438 pcsSingle extractor
Breakdown
Show verbatim quote (Tabel 1. Data Hasil Observasi.)
6 21/01/2026 23/01/26 21,2 40 1,17 3,65 42747
Equipment failure (breakdowns)Lost time1.17 jamSingle extractor
Cleaning
Show verbatim quote (Tabel 1. Data Hasil Observasi.)
6 21/01/2026 23/01/26 21,2 40 1,17 3,65 42747
Planned downtime (scheduled maintenance, breaks, no demand)Lost time3.65 jamSingle extractor
—
Show verbatim quote (Tabel 1. Data Hasil Observasi.)
6 21/01/2026 23/01/26 21,2 40 1,17 3,65 42747
noneThroughput42,747 pcsSingle extractor
Breakdown
Show verbatim quote (Tabel 1. Data Hasil Observasi.)
7 26/01/2026 28/01/26 21,2 40 0,42 5,25 43266
Equipment failure (breakdowns)Lost time0.420 jamSingle extractor
Cleaning
Show verbatim quote (Tabel 1. Data Hasil Observasi.)
7 26/01/2026 28/01/26 21,2 40 0,42 5,25 43266
Planned downtime (scheduled maintenance, breaks, no demand)Lost time5.25 jamSingle extractor
—
Show verbatim quote (Tabel 1. Data Hasil Observasi.)
7 26/01/2026 28/01/26 21,2 40 0,42 5,25 43266
noneThroughput43,266 pcsSingle extractor
Breakdown
Show verbatim quote (Tabel 1. Data Hasil Observasi.)
8 28/01/2026 30/01/26 21,2 40 0,92 5,50 42312
Equipment failure (breakdowns)Lost time0.920 jamSingle extractor
Cleaning
Show verbatim quote (Tabel 1. Data Hasil Observasi.)
8 28/01/2026 30/01/26 21,2 40 0,92 5,50 42312
Planned downtime (scheduled maintenance, breaks, no demand)Lost time5.50 jamSingle extractor
—
Show verbatim quote (Tabel 1. Data Hasil Observasi.)
8 28/01/2026 30/01/26 21,2 40 0,92 5,50 42312
noneThroughput42,312 pcsSingle extractor
cleaning process after ERCS improvementsfilling line
Show verbatim quote (Kesimpulan)
durasi cleaning menurun dari 4,78 jam menjadi 3,75 jam, atau berpotensi mengalami penurunan sebesar 21,55%
Planned downtime (scheduled maintenance, breaks, no demand)Lost time3.75 hSingle extractor

Observation units

  • Ice cream production line (PT Yili Indonesia Dairy) · Whole line or unspecified equipment · Baseline
  • Ice cream production line - post-intervention trial · Whole line or unspecified equipment · After intervention