Included study
Penerapan Konsep Total Productive Maintenance (TPM) dalam Peningkatan Overall Equipment Effectiveness (OEE) pada Mesin Pengisian Botol di PT Trita Musi Prasada
1Bibliographic record
- Authors
- Benedikto Nugroho Prasetya, Dominikus Budiarto
- Year
- 2026
- Venue
- Journal of Innovative and Creativity (Joecy)
- Country
- Indonesia
- Segment
- Soft drinks, bottled water and juices
- Process family
- Filling and packaging line
- Study type
- Before/after intervention
- Extraction scope
- Full text
- Size
- 1 plants · 1 lines · 1 machines
- Observation period
- 304 days
- Data collection
- manual_logs
- Intervention
Show the setting as described by the study
PT Trita Musi Prasada di Palembang, sebagai produsen AMDK lokal, memproduksi berbagai ukuran kemasan mulai 200 ml hingga galon 19 liter untuk memenuhi permintaan pasar.
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 10Moderate risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described. | 2 / 2 |
| Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events). | 2 / 2 |
| How were loss data collected?Manual logs or maintenance records with unknown completeness. | 1 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?Formulae or definitions are given for the reported metrics, including what counts as planned time. | 2 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?Only the top causes are reported and the unexplained remainder can be computed. | 1 / 2 |
| Is there evidence of selective reporting of favourable results?Intervention study in which baseline and post-intervention periods differ in length or method. | 1 / 2 |
| Are the reported numbers internally consistent?Inconsistencies above 10 percentage points, or OEE factors above 100%. | 0 / 2 |
| Could conflicts of interest or the source of the data bias the result?Authors are employees of the plant or of an equipment/software vendor; no declaration. | 1 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
—Show verbatim quote (Tabel 18)Reduced Speed Loss 261 9% 91% | Reduced speed | Share of lost time | 9.00 % | Both extractors agreed |
—Show verbatim quote (Tabel 18)Idling Minor Stoppages 560 20% 82% | Idling and minor stops (micro-stops) | Share of lost time | 20.0 % | Both extractors agreed |
—Show verbatim quote (Tabel 8)Setup and Adjustment Loss 6540 17% 85% | Setup and adjustments | Lost time | 6,540 menit | Both extractors agreed |
—Show verbatim quote (Tabel 22)Rata-rata Quality Ratio 94,51 % 99,37 % | none | Quality | 94.5 % | Both extractors agreed |
—Show verbatim quote (Tabel 22)Rata-rata Performance Efficiency 51,55 % 85,91 % | none | Performance | 51.6 % | Both extractors agreed |
—Show verbatim quote (Tabel 22)Rata-rata Availability Ratio 84,42 % 98,42 % | none | Availability | 84.4 % | Both extractors agreed |
—Show verbatim quote (Tabel 22)Rata-rata Nilai OEE 42,00 % 84,03 % | none | OEE | 42.0 % | Both extractors agreed |
—Show verbatim quote (Tabel 22)Rata-rata Availability Ratio 84,42 % 98,42 % | none | Availability | 98.4 % | Both extractors agreed |
—Show verbatim quote (Tabel 22)Rata-rata Performance Efficiency 51,55 % 85,91 % | none | Performance | 85.9 % | Both extractors agreed |
—Show verbatim quote (Tabel 22)Rata-rata Nilai OEE 42,00 % 84,03 % | none | OEE | 84.0 % | Both extractors agreed |
—Show verbatim quote (Tabel 22)Rata-rata Quality Ratio 94,51 % 99,37 % | none | Quality | 99.4 % | Both extractors agreed |
—Show verbatim quote (Tabel 8)Setup and Adjustment Loss 6540 17% 85% | Setup and adjustments | Share of lost time | 17.0 % | Both extractors agreed |
—Show verbatim quote (Tabel 18)Setup and Adjustment Loss 1740 62% 62% | Setup and adjustments | Share of lost time | 62.0 % | Both extractors agreed |
—Show verbatim quote (Tabel 18)Setup and Adjustment Loss 1740 62% 62% | Setup and adjustments | Lost time | 1,740 menit | Both extractors agreed |
—Show verbatim quote (Tabel 18)Reduced Speed Loss 261 9% 91% | Reduced speed | Lost time | 261 menit | Both extractors agreed |
—Show verbatim quote (Tabel 18)Idling Minor Stoppages 560 20% 82% | Idling and minor stops (micro-stops) | Lost time | 560 menit | Both extractors agreed |
—Show verbatim quote (Tabel 8)Idling Minor Stoppages 19007 49% 49% | Idling and minor stops (micro-stops) | Share of lost time | 49.0 % | Both extractors agreed |
—Show verbatim quote (Tabel 8)Idling Minor Stoppages 19007 49% 49% | Idling and minor stops (micro-stops) | Lost time | 19,007 menit | Both extractors agreed |
—Show verbatim quote (Tabel 8)Breakdown Loss 5927 15% 100% | Equipment failure (breakdowns) | Lost time | 5,927 menit | Both extractors agreed |
—Show verbatim quote (Tabel 23)Availability 51 % 99 % + 48 % Downtime turun drastic karena perawatan mandiri | none | Availability | 51.0 % | Single extractor |
—Show verbatim quote (Tabel 23)Performance 31,2 % 85,91 % + 54,7 % Mesin jarang berhenti mendadak | none | Performance | 31.2 % | Single extractor |
—Show verbatim quote (Tabel 23)Quality 80 % 99 % + 19 % Produk cacat yang berkurang karena mesin stabil | none | Quality | 80.0 % | Single extractor |
—Show verbatim quote (Tabel 8)Breakdown Loss 5927 15% 100% | Equipment failure (breakdowns) | Share of lost time | 15.0 % | Single extractor |
—Show verbatim quote (Tabel 8)Reduced Speed Loss 7223 19% 68% | Reduced speed | Lost time | 7,223 menit | Single extractor |
—Show verbatim quote (Tabel 8)Reduced Speed Loss 7223 19% 68% | Reduced speed | Share of lost time | 19.0 % | Single extractor |
Rework LossShow verbatim quote (Tabel 8)Rework Loss 0 0% 100% | Process defects (scrap and rework) | Lost time | 0 menit | Single extractor |
Scrap/Yield LossShow verbatim quote (Tabel 8)Scrap/Yield Loss 0 0% 100% | Process defects (scrap and rework) | Lost time | 0 menit | Single extractor |
—Filling Monoblock 20 NozzleShow verbatim quote (Results - Data Spesifikasi Mesin)namun dalam praktiknya dijalankan sekitar 2.800 botol per jam untuk menjaga kualitas | none | Throughput | 2,800 botol/jam | Single extractor |
—Show verbatim quote (Tabel 23)Availability 51 % 99 % + 48 % Downtime turun drastic karena perawatan mandiri | none | Availability | 99.0 % | Single extractor |
—Show verbatim quote (Tabel 23)Quality 80 % 99 % + 19 % Produk cacat yang berkurang karena mesin stabil | none | Quality | 99.0 % | Single extractor |
—Show verbatim quote (Tabel 18)Breakdown Loss 240 9% 100% | Equipment failure (breakdowns) | Lost time | 240 menit | Single extractor |
—Show verbatim quote (Tabel 18)Breakdown Loss 240 9% 100% | Equipment failure (breakdowns) | Share of lost time | 9.00 % | Single extractor |
Rework LossShow verbatim quote (Tabel 18)Rework Loss 0 0% 100% | Process defects (scrap and rework) | Lost time | 0 menit | Single extractor |
Scrap/Yield LossShow verbatim quote (Tabel 18)Scrap/Yield Loss 0 0% 100% | Process defects (scrap and rework) | Lost time | 0 menit | Single extractor |
Observation units
- Filling Monoblock 20 Nozzle · Filling · After intervention
- Filling Monoblock 20 Nozzle · Filling · Baseline