CHANGEOVER TIME REDUCTION THROUGH LEAN TOOL “SMED” – A CASE STUDY FROM FOOD SECTOR

Quelle öffnen

1Bibliografische Angaben

Autoren
Kateřina Gálová
Jahr
2018
Publikationsorgan
International Bata Conference for Ph.D. Students and Young Researchers (DOKBAT)
Land
Czech Republic
Segment
Zucker und Süßwaren
Prozessfamilie
Formen, Backen und Garen
Studientyp
Vorher-nachher-Intervention
Extraktionsumfang
Volltext
Umfang
1 Werke · 5 Linien · — Maschinen
Beobachtungszeitraum
365 Tage
Datenerhebung
automatic_monitoring
Intervention
Umfeld laut Studie anzeigen
The plant itself, in which the case study was processed, focuses on the production of chocolate and chocolate confectionery.

2Verzerrungsrisiko

Bewertet nach dem Schema des Protokolls: 2 geringe Bedenken, 1 einige Bedenken, 0 hohe Bedenken.
Gesamtpunktzahl 10Mittleres Risiko
KriteriumPunkte
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described.2 / 2
Is the observation period long enough and reported?Period reported but shorter than 30 days, or only the number of shifts is given.1 / 2
How were loss data collected?Manual logs or maintenance records with unknown completeness.1 / 2
Are OEE, loading time and the loss categories defined explicitly?A standard definition is cited but its application is not shown.1 / 2
Does the loss breakdown account for the total loss it claims to explain?Only the top causes are reported and the unexplained remainder can be computed.1 / 2
Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method.2 / 2
Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked.1 / 2
Could conflicts of interest or the source of the data bias the result?Authors are employees of the plant or of an equipment/software vendor; no declaration.1 / 2

3Extrahierte Daten

Jeder Datenpunkt mit seiner Einordnung und dem wörtlichen Zitat, das ihn belegt.
Berichtete UrsacheVerlustkategorieKennzahlWertExtraktion
—
Wörtliches Zitat anzeigen (Section 4.2 Actual impacts of the project, p.111)
Savings in the form of released production were 21 tons / year.
noneDurchsatz21,0 tons/yearBeide Extraktionen übereinstimmend
Internal activities
Wörtliches Zitat anzeigen (Section 4.2, Figure 9, p.111)
Internal activities occupied 83% of the total time.
Rüsten und EinstellenAnteil an der Verlustzeit83,0 %Beide Extraktionen übereinstimmend
changeover (selected type, average, long-run)
Wörtliches Zitat anzeigen (Section 4.2 Actual impacts of the project, p.111)
The new changeover time was even lower than the project goal, but in the long run, the time was 210 minutes. This time is kept without any major problems.
Rüsten und EinstellenMittlere Ereignisdauer210 minBeide Extraktionen übereinstimmend
changeover (selected type, annual frequency)
Wörtliches Zitat anzeigen (Section 4.2, p.109)
At a frequency of 58 changeovers per year and with a given number of operators and wage rates, the annual savings would be 91 thousand. CZK.
Rüsten und EinstellenAnzahl der Ereignisse58,0 events/yearBeide Extraktionen übereinstimmend
changeover (selected type, average)
Wörtliches Zitat anzeigen (Section 4.2 Specification of the project objective, p.109)
The project team decided on the main goal of the project, which was to reduce the time of the selected sort by 10% of the average changeover time, from 244 minutes to 220 minutes.
Rüsten und EinstellenMittlere Ereignisdauer244 minBeide Extraktionen übereinstimmend
Planned stoppages
Wörtliches Zitat anzeigen (Section 4.1 / Figure 4, p.108)
It is clear from the chart that the most important were planned stoppages with total time 10184 hours.
Geplanter Stillstand (geplante Instandhaltung, Pausen, keine Nachfrage)Verlustzeit10.184 hoursEinfache Extraktion
Planned stoppages
Wörtliches Zitat anzeigen (Section 5 Conclusion, p.113)
Plates fall into planned stoppages, accounting for 61% of all stoppages of the company.
Geplanter Stillstand (geplante Instandhaltung, Pausen, keine Nachfrage)Anteil an der Verlustzeit61,0 %Einfache Extraktion
Changeovers
Wörtliches Zitat anzeigen (Section 5 Conclusion, p.113)
Changeovers on a particular selected line then account for a total of 77% of all planned stoppages on this line.
Rüsten und EinstellenAnteil an der Verlustzeit77,0 %Einfache Extraktion
changeover (most frequent type)
Wörtliches Zitat anzeigen (Section 4.1, Figure 8, p.109)
Of these types of changeovers, the fourth longest changeover was the most frequent (which would take 185 minutes), but the longest and second most frequent type of changeover (240 minutes) was eventually chosen by project team for the next step.
Rüsten und EinstellenMittlere Ereignisdauer185 minEinfache Extraktion
changeover (selected type for SMED project)
Wörtliches Zitat anzeigen (Section 4.1, Figure 8, p.109)
Of these types of changeovers, the fourth longest changeover was the most frequent (which would take 185 minutes), but the longest and second most frequent type of changeover (240 minutes) was eventually chosen by project team for the next step.
Rüsten und EinstellenMittlere Ereignisdauer240 minEinfache Extraktion
External activities
Wörtliches Zitat anzeigen (Figure 9, p.111)
internal; 83% external; 17% breakdown; 6% Figure 9 Internal vs external activities. Source: own
Rüsten und EinstellenAnteil an der Verlustzeit17,0 %Einfache Extraktion
breakdown (within changeover)valve
Wörtliches Zitat anzeigen (Figure 9, p.111)
internal; 83% external; 17% breakdown; 6% Figure 9 Internal vs external activities. Source: own
Anlagenausfall (Störungen)Anteil an der Verlustzeit6,00 %Einfache Extraktion
changeover (selected type, average, first re-measurement)
Wörtliches Zitat anzeigen (Section 4.2 Actual impacts of the project, p.111)
The average throw time dropped from 244 minutes to 194 minutes (Figure 7) and the target was met.
Rüsten und EinstellenMittlere Ereignisdauer194 minEinfache Extraktion
Flushing masses
Wörtliches Zitat anzeigen (Table 6 (Changeover activities))
Flushing masses: 0:39:00
Rüsten und EinstellenMittlere Ereignisdauer39,0 minEinfache Extraktion
Dismantling the divider
Wörtliches Zitat anzeigen (Table 6 (Changeover activities))
Dismantling the divider: 0:28:00
Rüsten und EinstellenMittlere Ereignisdauer28,0 minEinfache Extraktion
Assembly of dividers
Wörtliches Zitat anzeigen (Table 6 (Changeover activities))
Assembly of dividers: 0:22:00
Rüsten und EinstellenMittlere Ereignisdauer22,0 minEinfache Extraktion
Valve failure
Wörtliches Zitat anzeigen (Table 6 (Changeover activities))
Valve failure: 0:13:00
Rüsten und EinstellenMittlere Ereignisdauer13,0 minEinfache Extraktion
Flush with butter
Wörtliches Zitat anzeigen (Table 6 (Changeover activities))
Flush with butter: 0:06:00
Rüsten und EinstellenMittlere Ereignisdauer6,00 minEinfache Extraktion
Exchange of molds
Wörtliches Zitat anzeigen (Table 6 (Changeover activities))
Exchange of molds: 0:04:00
Rüsten und EinstellenMittlere Ereignisdauer4,00 minEinfache Extraktion
Forming of molds
Wörtliches Zitat anzeigen (Table 6 (Changeover activities))
Forming of molds: 0:07:00
Rüsten und EinstellenMittlere Ereignisdauer7,00 minEinfache Extraktion
Blowing the front of the bass
Wörtliches Zitat anzeigen (Table 6 (Changeover activities))
Blowing the front of the bass: 0:06:00
Rüsten und EinstellenMittlere Ereignisdauer6,00 minEinfache Extraktion
Start of production
Wörtliches Zitat anzeigen (Table 6 (Changeover activities))
Start of production: 0:03:00
Rüsten und EinstellenMittlere Ereignisdauer3,00 minEinfache Extraktion
First good form
Wörtliches Zitat anzeigen (Table 6 (Changeover activities))
First good form: 0:03:00
Rüsten und EinstellenMittlere Ereignisdauer3,00 minEinfache Extraktion
First good product
Wörtliches Zitat anzeigen (Table 6 (Changeover activities))
First good product: 0:27:00
Rüsten und EinstellenMittlere Ereignisdauer27,0 minEinfache Extraktion
—
Wörtliches Zitat anzeigen (Section 4.2, Table 8 (Financial impact of the project))
At a frequency of 58 changeovers per year and with a given number of operators and wage rates, the annual savings would be 91 thousand. CZK.
Rüsten und EinstellenAnzahl der Ereignisse58,0 eventsEinfache Extraktion

Beobachtungseinheiten

  • D1 line · Formen, Gießen und Dosieren · Nach der Intervention
  • D1 line · Formen, Gießen und Dosieren · Ausgangslage
  • Whole plant · Gesamte Linie oder nicht spezifizierte Anlage · Ausgangslage