Changeover disassembly, cleaning and reassembly of machine parts
In short
It appears in about 1 of every 100 lines studied.
When it appears, it takes on average about 57 % of the line's lost time. Reported by 2 of the 127 studies that could observe it (limited evidence).
What happens
At a product or format changeover the line must be stopped so that contact parts and tooling can be unbolted, taken off the machine, cleaned or sanitised to remove residual product and allergens, and then refitted and aligned before the next run can start. This manual, sequential work occupies the whole changeover window and keeps the line in a non-productive setup state until the first good unit is produced.
What is done about it
Apply SMED principles to convert internal tasks into external ones prepared in advance, standardise and pre-stage clean tooling sets, use quick-release fasteners and modular contact parts, and sequence or parallelise disassembly, cleaning and reassembly steps with trained changeover crews to shorten the non-productive window.
Practical guidance written from engineering knowledge; it is not a statistical estimate.
1Probability and evidence
- Probability of presence
- 0.7% [0.2–1.8%]
- Expected share of lost time
- 0.4% [0.1–1.0%]
- Share of lost time when present
- 57% [46–67%]
- Studies / units
- 127 / 161
- Evidence grade
- C
Grade C: 2 to 4 studies, or an interval wider than 0.35.
2Probability by segment
- Dairy products0.8% [0.1–2.8%]13 studies
- Soft drinks, bottled water and juices0.7% [0.1–2.2%]26 studies
- Brewing, wine and spirits0.8% [0.1–2.7%]11 studies
- Bakery and pasta0.7% [0.1–2.3%]24 studies
- Meat, poultry and seafood0.8% [0.1–2.6%]9 studies
- Fruit and vegetable processing0.8% [0.1–2.9%]7 studies
- Grain and oilseed milling0.8% [0.1–2.9%]6 studies
- Sugar and confectionery0.8% [0.1–2.8%]9 studies
- Snacks, coffee, tea and other foods1.2% [0.2–4.1%]5 studies
- Animal feed and pet food1.2% [0.1–3.7%]7 studies
- Food manufacturing (unspecified or mixed)0.8% [0.1–2.9%]10 studies
3Mechanism, SCADA signature and countermeasure
Mechanism
Engineering guidanceAt a product or format changeover the line must be stopped so that contact parts and tooling can be unbolted, taken off the machine, cleaned or sanitised to remove residual product and allergens, and then refitted and aligned before the next run can start. This manual, sequential work occupies the whole changeover window and keeps the line in a non-productive setup state until the first good unit is produced.
How it looks in SCADA data
Engineering guidanceMES/SCADA shows an extended machine-state period classified as changeover or setup, bounded by the last good unit of the previous order and the first good unit of the next, with no production counts advancing; operators log manual start/stop events for disassembly, cleaning and reassembly steps, and the duration correlates with format or recipe change events rather than with fault alarms.
Countermeasure
Engineering guidanceApply SMED principles to convert internal tasks into external ones prepared in advance, standardise and pre-stage clean tooling sets, use quick-release fasteners and modular contact parts, and sequence or parallelise disassembly, cleaning and reassembly steps with trained changeover crews to shorten the non-productive window.
4Sources
- Investigation on a multiscale sustainable manufacturing approach to production changeover complexity reduction and its implementation through smart surfaces and process optimization (2022)Open sourceLost time: 660 min · as reported: “Production machines dissembling, cleaning and assembling”
Show verbatim quote
Production machines dissembling, cleaning and assembling 660 minutes
- Production Management Model Based on Lean Manufacturing Tools and SLP to Increase Productivity in a Meatball (BARF) Plant (2026)Open sourceMean event duration: 4.04 min · as reported: “Disassemble parts of inactive equipment”
Show verbatim quote
Disassemble parts of inactive equipment 4.04 Internal External
- Production Management Model Based on Lean Manufacturing Tools and SLP to Increase Productivity in a Meatball (BARF) Plant (2026)Open sourceLost time: 4.04 min · as reported: “Disassemble parts of inactive equipment”
Show verbatim quote
Disassemble parts of inactive equipment 4.04