Included study
Investigation on a multiscale sustainable manufacturing approach to production changeover complexity reduction and its implementation through smart surfaces and process optimization
1Bibliographic record
- Authors
- Mustafa, Khalid
- Year
- 2022
- Venue
- —
- DOI
- —
- Country
- United Kingdom
- Segment
- Snacks, coffee, tea and other foods
- Process family
- Whole plant or unspecified
- Study type
- Single case study
- Extraction scope
- Full text
- Size
- 1 plants · 1 lines · 10 machines
- Observation period
- 365 days
- Data collection
- manual_logs
- Intervention
Show the setting as described by the study
In this paper, a case study of a crisps manufacturing process has been considered and studied where material sticks to the metal conveyor during the production process
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 11Moderate risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described. | 2 / 2 |
| Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events). | 2 / 2 |
| How were loss data collected?Manual logs or maintenance records with unknown completeness. | 1 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?No definition; metrics are reported as bare numbers. | 0 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?The reported causes or categories sum to at least 90% of the stated total, or an explicit "other" class closes the balance. | 2 / 2 |
| Is there evidence of selective reporting of favourable results?Intervention study in which baseline and post-intervention periods differ in length or method. | 1 / 2 |
| Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked. | 1 / 2 |
| Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result. | 2 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
Flavour mixer cleaning and setupflavour mixerShow verbatim quote (Table 5.1)Flavour mixer cleaning and setup 188 minutes | Setup and adjustments | Lost time | 188 min | Both extractors agreed |
Production machines dissembling, cleaning and assemblingproduction machinesShow verbatim quote (Table 5.1)Production machines dissembling, cleaning and assembling 660 minutes | Setup and adjustments | Lost time | 660 min | Both extractors agreed |
Oil drum cleaning and setupoil drumShow verbatim quote (Table 5.1)Oil drum cleaning and setup 135 minutes | Setup and adjustments | Lost time | 135 min | Both extractors agreed |
Storage conveyor cleaningstorage conveyorShow verbatim quote (Table 5.1)Storage conveyor cleaning 60 minutes | Setup and adjustments | Lost time | 60.0 min | Both extractors agreed |
Cleaning of conveyorsconveyorsShow verbatim quote (Table 5.1)Cleaning of conveyors 324 minutes | Setup and adjustments | Lost time | 324 min | Both extractors agreed |
Change OverShow verbatim quote (Table 4.3)Change Over 55 16.50% | Setup and adjustments | Share of lost time | 16.5 % | Both extractors agreed |
Set up and Change OverShow verbatim quote (Table 4.2)Set up and Change Over 27 28 55 | Setup and adjustments | Lost time | 55.0 min | Both extractors agreed |
Cleaning BreaksShow verbatim quote (Table 4.3)Cleaning Breaks Minutes 79 23.23% | Setup and adjustments | Share of lost time | 23.2 % | Both extractors agreed |
Packing Hall BreaksShow verbatim quote (Table 4.2)Packing Hall Breaks 23 23 46 | Planned downtime (scheduled maintenance, breaks, no demand) | Lost time | 46.0 min | Adjudicated |
Operator AssessmentsShow verbatim quote (Table 4.2)Operator Assessments 0 4 4 | Organizational or external stops (material or personnel shortage, utilities outage) | Lost time | 4.00 min | Adjudicated |
Cute Wrap UpShow verbatim quote (Table 4.2)Cute Wrap Up 1 1 2 | Idling and minor stops (micro-stops) | Lost time | 2.00 min | Adjudicated |
Conveyor ProblemconveyorShow verbatim quote (Table 4.2)Conveyor Problem 16 12 28 | Equipment failure (breakdowns) | Lost time | 28.0 min | Both extractors agreed |
Cleaning BreaksShow verbatim quote (Table 4.2)Cleaning Breaks 40 39 79 | Setup and adjustments | Lost time | 79.0 min | Both extractors agreed |
Gauge Rollergauge rollerShow verbatim quote (Table 4.2)Gauge Roller 1 2 3 | Idling and minor stops (micro-stops) | Lost time | 3.00 min | Adjudicated |
Machine IssueShow verbatim quote (Table 4.2)Machine Issue 11 5 16 | Equipment failure (breakdowns) | Lost time | 16.0 min | Both extractors agreed |
Oiler StoppingoilerShow verbatim quote (Table 4.2)Oiler Stopping 7 5 12 | Equipment failure (breakdowns) | Lost time | 12.0 min | Both extractors agreed |
Team BriefingShow verbatim quote (Table 4.2)Team Briefing 4 10 14 | Planned downtime (scheduled maintenance, breaks, no demand) | Lost time | 14.0 min | Both extractors agreed |
TNA IssuesTNAShow verbatim quote (Table 4.2)TNA Issues 2 0 2 | Idling and minor stops (micro-stops) | Lost time | 2.00 min | Adjudicated |
Refed Bagspackaging/baggingShow verbatim quote (Table 4.2)Refed Bags 3 0 3 | Idling and minor stops (micro-stops) | Lost time | 3.00 min | Adjudicated |
TrialShow verbatim quote (Table 4.2)Trial 1 0 1 | Not classifiable from the report | Lost time | 1.00 min | Adjudicated |
WasteShow verbatim quote (Table 4.1)Waste % 4.85% | Process defects (scrap and rework) | Defect rate | 4.85 % | Both extractors agreed |
—Show verbatim quote (Table 4.1)Efficiency % 87.45% | none | Performance | 87.5 % | Single extractor |
Delay in the OvenovenShow verbatim quote (Table 4.2)Delay in the Oven M I N U T E S 19 13 32 | Not classifiable from the report | Lost time | 32.0 min | Single extractor |
Plant total down timeShow verbatim quote (Table 4.2)Plant total down time 155 142 297 | Not classifiable from the report | Lost time | 297 min | Single extractor |
Total Down Time (Cleaning + Change Over)Show verbatim quote (Table 4.3)Total Down Time 134 45.11% | Setup and adjustments | Share of lost time | 45.1 % | Single extractor |
overall plant down timeShow verbatim quote (Section 4.10.1)One year's data was gathered and it showed an average down time of 20.625 %; therefore, the plant's actual production was down by 20.625 % of its maximum capacity. | Not classifiable from the report | Share of planned time | 20.6 % | Single extractor |
Water Leak from the rain TC1TC1 equipmentShow verbatim quote (Table 4.2)Water Leak from the rain TC1 | 0 | 0 | 0 | Equipment failure (breakdowns) | Lost time | 0 min | Single extractor |
—Show verbatim quote (Table 4.1)Efficiency % 87.45% | none | Share of planned time | 87.5 % | Single extractor |
Observation units
- Plant A production line (McVitie's) · Whole line or unspecified equipment · Baseline
- Production facility · Whole line or unspecified equipment · Baseline