Investigation on a multiscale sustainable manufacturing approach to production changeover complexity reduction and its implementation through smart surfaces and process optimization

Open source

1Bibliographic record

Authors
Mustafa, Khalid
Year
2022
Venue
—
DOI
—
Country
United Kingdom
Segment
Snacks, coffee, tea and other foods
Process family
Whole plant or unspecified
Study type
Single case study
Extraction scope
Full text
Size
1 plants · 1 lines · 10 machines
Observation period
365 days
Data collection
manual_logs
Intervention
Show the setting as described by the study
In this paper, a case study of a crisps manufacturing process has been considered and studied where material sticks to the metal conveyor during the production process

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 11Moderate risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described.2 / 2
Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events).2 / 2
How were loss data collected?Manual logs or maintenance records with unknown completeness.1 / 2
Are OEE, loading time and the loss categories defined explicitly?No definition; metrics are reported as bare numbers.0 / 2
Does the loss breakdown account for the total loss it claims to explain?The reported causes or categories sum to at least 90% of the stated total, or an explicit "other" class closes the balance.2 / 2
Is there evidence of selective reporting of favourable results?Intervention study in which baseline and post-intervention periods differ in length or method.1 / 2
Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked.1 / 2
Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result.2 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
Flavour mixer cleaning and setupflavour mixer
Show verbatim quote (Table 5.1)
Flavour mixer cleaning and setup 188 minutes
Setup and adjustmentsLost time188 minBoth extractors agreed
Production machines dissembling, cleaning and assemblingproduction machines
Show verbatim quote (Table 5.1)
Production machines dissembling, cleaning and assembling 660 minutes
Setup and adjustmentsLost time660 minBoth extractors agreed
Oil drum cleaning and setupoil drum
Show verbatim quote (Table 5.1)
Oil drum cleaning and setup 135 minutes
Setup and adjustmentsLost time135 minBoth extractors agreed
Storage conveyor cleaningstorage conveyor
Show verbatim quote (Table 5.1)
Storage conveyor cleaning 60 minutes
Setup and adjustmentsLost time60.0 minBoth extractors agreed
Cleaning of conveyorsconveyors
Show verbatim quote (Table 5.1)
Cleaning of conveyors 324 minutes
Setup and adjustmentsLost time324 minBoth extractors agreed
Change Over
Show verbatim quote (Table 4.3)
Change Over 55 16.50%
Setup and adjustmentsShare of lost time16.5 %Both extractors agreed
Set up and Change Over
Show verbatim quote (Table 4.2)
Set up and Change Over 27 28 55
Setup and adjustmentsLost time55.0 minBoth extractors agreed
Cleaning Breaks
Show verbatim quote (Table 4.3)
Cleaning Breaks Minutes 79 23.23%
Setup and adjustmentsShare of lost time23.2 %Both extractors agreed
Packing Hall Breaks
Show verbatim quote (Table 4.2)
Packing Hall Breaks 23 23 46
Planned downtime (scheduled maintenance, breaks, no demand)Lost time46.0 minAdjudicated
Operator Assessments
Show verbatim quote (Table 4.2)
Operator Assessments 0 4 4
Organizational or external stops (material or personnel shortage, utilities outage)Lost time4.00 minAdjudicated
Cute Wrap Up
Show verbatim quote (Table 4.2)
Cute Wrap Up 1 1 2
Idling and minor stops (micro-stops)Lost time2.00 minAdjudicated
Conveyor Problemconveyor
Show verbatim quote (Table 4.2)
Conveyor Problem 16 12 28
Equipment failure (breakdowns)Lost time28.0 minBoth extractors agreed
Cleaning Breaks
Show verbatim quote (Table 4.2)
Cleaning Breaks 40 39 79
Setup and adjustmentsLost time79.0 minBoth extractors agreed
Gauge Rollergauge roller
Show verbatim quote (Table 4.2)
Gauge Roller 1 2 3
Idling and minor stops (micro-stops)Lost time3.00 minAdjudicated
Machine Issue
Show verbatim quote (Table 4.2)
Machine Issue 11 5 16
Equipment failure (breakdowns)Lost time16.0 minBoth extractors agreed
Oiler Stoppingoiler
Show verbatim quote (Table 4.2)
Oiler Stopping 7 5 12
Equipment failure (breakdowns)Lost time12.0 minBoth extractors agreed
Team Briefing
Show verbatim quote (Table 4.2)
Team Briefing 4 10 14
Planned downtime (scheduled maintenance, breaks, no demand)Lost time14.0 minBoth extractors agreed
TNA IssuesTNA
Show verbatim quote (Table 4.2)
TNA Issues 2 0 2
Idling and minor stops (micro-stops)Lost time2.00 minAdjudicated
Refed Bagspackaging/bagging
Show verbatim quote (Table 4.2)
Refed Bags 3 0 3
Idling and minor stops (micro-stops)Lost time3.00 minAdjudicated
Trial
Show verbatim quote (Table 4.2)
Trial 1 0 1
Not classifiable from the reportLost time1.00 minAdjudicated
Waste
Show verbatim quote (Table 4.1)
Waste % 4.85%
Process defects (scrap and rework)Defect rate4.85 %Both extractors agreed
—
Show verbatim quote (Table 4.1)
Efficiency % 87.45%
nonePerformance87.5 %Single extractor
Delay in the Ovenoven
Show verbatim quote (Table 4.2)
Delay in the Oven M I N U T E S 19 13 32
Not classifiable from the reportLost time32.0 minSingle extractor
Plant total down time
Show verbatim quote (Table 4.2)
Plant total down time 155 142 297
Not classifiable from the reportLost time297 minSingle extractor
Total Down Time (Cleaning + Change Over)
Show verbatim quote (Table 4.3)
Total Down Time 134 45.11%
Setup and adjustmentsShare of lost time45.1 %Single extractor
overall plant down time
Show verbatim quote (Section 4.10.1)
One year's data was gathered and it showed an average down time of 20.625 %; therefore, the plant's actual production was down by 20.625 % of its maximum capacity.
Not classifiable from the reportShare of planned time20.6 %Single extractor
Water Leak from the rain TC1TC1 equipment
Show verbatim quote (Table 4.2)
Water Leak from the rain TC1 | 0 | 0 | 0
Equipment failure (breakdowns)Lost time0 minSingle extractor
—
Show verbatim quote (Table 4.1)
Efficiency % 87.45%
noneShare of planned time87.5 %Single extractor

Observation units

  • Plant A production line (McVitie's) · Whole line or unspecified equipment · Baseline
  • Production facility · Whole line or unspecified equipment · Baseline