What happens

During a product or format changeover on the filler, operators must complete batch records, line-clearance checklists and other required paperwork before production can restart; this administrative step runs sequentially rather than in parallel with mechanical changeover tasks, extending the total non-productive time. When the associated downtime event is logged loosely, the same stoppage can be recorded either as a changeover delay or, if the machine sits idle with no clear fault, be misattributed as a filler malfunction.

What is done about it

Replace paper-based batch records and clearance checklists with electronic, pre-populated digital forms that can be completed in parallel with the mechanical changeover, and pre-stage documentation requirements before the line is stopped; standardize downtime coding so administrative delays are logged separately from true equipment failures.

Practical guidance written from engineering knowledge; it is not a statistical estimate.

1Probability and evidence

Pooled over all segments. A wide interval is a result: it states how much the evidence allows us to know.
Probability of presence
0.5% [0.1–1.4%]
Expected share of lost time
0.3% [0.0–0.7%]
Share of lost time when present
54% [39–65%]
Studies / units
120 / 162
Evidence grade
D

Grade D: 0 or 1 study; the estimate is driven by partial pooling and priors, and the wide interval is the result.

2Probability by segment

Partially pooled estimates for each industry segment.
  • Dairy products
    0.5% [0.1–1.9%]18 studies
  • Soft drinks, bottled water and juices
    0.6% [0.1–2.1%]44 studies
  • Brewing, wine and spirits
    0.5% [0.1–1.9%]16 studies
  • Bakery and pasta
    0.6% [0.1–2.2%]0 studies
  • Meat, poultry and seafood
    0.6% [0.1–2.1%]6 studies
  • Fruit and vegetable processing
    0.6% [0.1–2.3%]4 studies
  • Grain and oilseed milling
    0.6% [0.1–2.1%]6 studies
  • Sugar and confectionery
    0.6% [0.1–2.1%]3 studies
  • Snacks, coffee, tea and other foods
    0.6% [0.1–2.2%]6 studies
  • Animal feed and pet food
    0.6% [0.1–2.1%]4 studies
  • Food manufacturing (unspecified or mixed)
    0.6% [0.1–2.1%]13 studies

3Mechanism, SCADA signature and countermeasure

Engineering guidance that helps recognise and address the cause; it is not part of the statistical estimate.

Mechanism

Engineering guidance

During a product or format changeover on the filler, operators must complete batch records, line-clearance checklists and other required paperwork before production can restart; this administrative step runs sequentially rather than in parallel with mechanical changeover tasks, extending the total non-productive time. When the associated downtime event is logged loosely, the same stoppage can be recorded either as a changeover delay or, if the machine sits idle with no clear fault, be misattributed as a filler malfunction.

How it looks in SCADA data

Engineering guidance

The filler or line shows an extended stop or idle state during the changeover window with no active fault or alarm code, often starting right after the last good unit of the previous run and ending when production resumes; machine-state logs show the stop duration tracking paperwork or administrative activity rather than mechanical adjustment, and occasionally the event is coded as an undefined equipment stop.

Countermeasure

Engineering guidance

Replace paper-based batch records and clearance checklists with electronic, pre-populated digital forms that can be completed in parallel with the mechanical changeover, and pre-stage documentation requirements before the line is stopped; standardize downtime coding so administrative delays are logged separately from true equipment failures.

4Sources

Every extracted datum with its study, value and verbatim quote.
  1. Lost time: 0.500 min · as reported: “Documentation”
    Show verbatim quote
    Documentation 0.5 min 18 min External
  2. Lost time: 0.500 min · as reported: “Documentation papers”
    Show verbatim quote
    Documentation papers | 0.5 min | 11 min | External
  3. Lost time: 3.20 hrs · as reported: “Filler Malfunction”
    Show verbatim quote
    1 Coca- Cola 50cl PET 24 18,000 16,250 3.2 Filler Malfunction 84.2 Low spare part stock