Included study
COMPARATIVE ANALYSIS OF PRODUCTION LINE EFFICIENCY UNDER VARYING DEMAND SCENARIOS USING MULTILAYER PERCEPTRON
1Bibliographic record
- Authors
- Raphael Okosiemiema, Okwu Elemchukwu Isaac, Unyeawaji Brownson Ntesat
- Year
- 2026
- Venue
- World Journal of Advanced Engineering Technology and Sciences
- Country
- Nigeria
- Segment
- Soft drinks, bottled water and juices
- Process family
- Filling and packaging line
- Study type
- Multiple case study
- Extraction scope
- Full text
- Size
- 1 plants · 5 lines · 6 machines
- Observation period
- 181 days
- Data collection
- manual_logs
- Intervention
Show the setting as described by the study
The study used production records from the Nigerian Bottling Company (NBC), Port Harcourt plant.
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 11Moderate risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described. | 2 / 2 |
| Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events). | 2 / 2 |
| How were loss data collected?Manual logs or maintenance records with unknown completeness. | 1 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?A standard definition is cited but its application is not shown. | 1 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?Only the top causes are reported and the unexplained remainder can be computed. | 1 / 2 |
| Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method. | 2 / 2 |
| Are the reported numbers internally consistent?Inconsistencies above 10 percentage points, or OEE factors above 100%. | 0 / 2 |
| Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result. | 2 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
Conveyor JamConveyorShow verbatim quote (Table 1)4 Eva Water 75cl 24 20,000 18,430 3.0 Conveyor Jam 86.2 Inconsistent water supply pressure | Equipment failure (breakdowns) | Lost time | 3.00 hrs | Adjudicated |
Labeling MisalignmentLabellerShow verbatim quote (Table 1)3 Sprite 50cl PET 24 18,500 17,200 2.5 Labeling Misalignment 89.5 Changeover delay | Equipment failure (breakdowns) | Lost time | 2.50 hrs | Adjudicated |
Capper InconsistencyCapperShow verbatim quote (Table 1)2 Fanta Orange 35cl 24 17,000 14,980 4.7 Capper Inconsistency 78.7 Operator shortage | Equipment failure (breakdowns) | Lost time | 4.70 hrs | Both extractors agreed |
Glass Breakage HandlingShow verbatim quote (Table 1)5 Coca- Cola 1L Glass 24 14,000 12,400 5.1 Glass Breakage Handling 74.3 Fragility of packaging material | Equipment failure (breakdowns) | Lost time | 5.10 hrs | Both extractors agreed |
Filler MalfunctionFiller MachineShow verbatim quote (Table 1)1 Coca- Cola 50cl PET 24 18,000 16,250 3.2 Filler Malfunction 84.2 Low spare part stock | Equipment failure (breakdowns) | Lost time | 3.20 hrs | Both extractors agreed |
Cap defects, bottle warpingShow verbatim quote (Table 7)May 115,000 2,300 Cap defects, bottle warping 2.0 Supplier quality review | Process defects (scrap and rework) | Defect rate | 2.00 % | Both extractors agreed |
—Labeller Line 3Show verbatim quote (Table 3)Labeller Line 3 Preventive Mar 8 1.5 1.0 ₦185,000 2.0 | Equipment failure (breakdowns) | Lost time | 2.00 hrs | Adjudicated |
—Filler Machine Line 1Show verbatim quote (Table 3)Filler Machine Line 1 Preventive Jan 10 2.5 1.2 ₦250,000 3.0 | Equipment failure (breakdowns) | Lost time | 3.00 hrs | Both extractors agreed |
—Conveyor Line 4Show verbatim quote (Table 3)Conveyor Line 4 Emergency Repair Apr 0 3.0 3.2 ₦290,000 3.5 | Equipment failure (breakdowns) | Lost time | 3.50 hrs | Adjudicated |
—Glass Washer Line 5Show verbatim quote (Table 3)Glass Washer Line 5 Routine Maintenance May 7 5.1 2.8 ₦360,000 6.0 | Equipment failure (breakdowns) | Lost time | 6.00 hrs | Both extractors agreed |
—Capper Line 2Show verbatim quote (Table 3)Capper Line 2 Corrective Feb 0 4.7 2.1 ₦410,000 5.0 | Equipment failure (breakdowns) | Lost time | 5.00 hrs | Both extractors agreed |
—Show verbatim quote (Table 1)1 Coca- Cola 50cl PET 24 18,000 16,250 3.2 Filler Malfunction 84.2 Low spare part stock | none | Availability | 84.2 % | Single extractor |
—Show verbatim quote (Table 10)Efficiency (%) 90.28 88.12 92.97 92.15 88.57 | none | Performance | 90.3 % | Single extractor |
—Show verbatim quote (Table 10)Throughput (cases/hr) 677.08 624.17 716.67 767.92 516.67 | none | Throughput | 677 cases/hr | Single extractor |
Preventive maintenanceFiller Machine Line 1Show verbatim quote (Table 3)Filler Machine Line 1 Preventive Jan 10 2.5 1.2 ₦250,000 3.0 | Planned downtime (scheduled maintenance, breaks, no demand) | Lost time | 10.0 hrs | Single extractor |
—Filler Machine Line 1Show verbatim quote (Table 3)Filler Machine Line 1 Preventive Jan 10 2.5 1.2 ₦250,000 3.0 | Equipment failure (breakdowns) | Lost time | 2.50 hrs | Single extractor |
—Show verbatim quote (Table 1)2 Fanta Orange 35cl 24 17,000 14,980 4.7 Capper Inconsistency 78.7 Operator shortage | none | Availability | 78.7 % | Single extractor |
—Show verbatim quote (Table 10)Efficiency (%) 90.28 88.12 92.97 92.15 88.57 | none | Performance | 88.1 % | Single extractor |
—Show verbatim quote (Table 10)Throughput (cases/hr) 677.08 624.17 716.67 767.92 516.67 | none | Throughput | 624 cases/hr | Single extractor |
—Capper Line 2Show verbatim quote (Table 3)Capper Line 2 Corrective Feb 0 4.7 2.1 ₦410,000 5.0 | Equipment failure (breakdowns) | Lost time | 4.70 hrs | Single extractor |
—Show verbatim quote (Table 1)3 Sprite 50cl PET 24 18,500 17,200 2.5 Labeling Misalignment 89.5 Changeover delay | none | Availability | 89.5 % | Single extractor |
—Show verbatim quote (Table 10)Efficiency (%) 90.28 88.12 92.97 92.15 88.57 | none | Performance | 93.0 % | Single extractor |
—Show verbatim quote (Table 10)Throughput (cases/hr) 677.08 624.17 716.67 767.92 516.67 | none | Throughput | 717 cases/hr | Single extractor |
Preventive maintenanceLabeller Line 3Show verbatim quote (Table 3)Labeller Line 3 Preventive Mar 8 1.5 1.0 ₦185,000 2.0 | Planned downtime (scheduled maintenance, breaks, no demand) | Lost time | 8.00 hrs | Single extractor |
—Labeller Line 3Show verbatim quote (Table 3)Labeller Line 3 Preventive Mar 8 1.5 1.0 ₦185,000 2.0 | Equipment failure (breakdowns) | Lost time | 1.50 hrs | Single extractor |
—Show verbatim quote (Table 1)4 Eva Water 75cl 24 20,000 18,430 3.0 Conveyor Jam 86.2 Inconsistent water supply pressure | none | Availability | 86.2 % | Single extractor |
—Show verbatim quote (Table 10)Efficiency (%) 90.28 88.12 92.97 92.15 88.57 | none | Performance | 92.2 % | Single extractor |
—Show verbatim quote (Table 10)Throughput (cases/hr) 677.08 624.17 716.67 767.92 516.67 | none | Throughput | 768 cases/hr | Single extractor |
—Conveyor Line 4Show verbatim quote (Table 3)Conveyor Line 4 Emergency Repair Apr 0 3.0 3.2 ₦290,000 3.5 | Equipment failure (breakdowns) | Lost time | 3.00 hrs | Single extractor |
—Show verbatim quote (Table 1)5 Coca- Cola 1L Glass 24 14,000 12,400 5.1 Glass Breakage Handling 74.3 Fragility of packaging material | none | Availability | 74.3 % | Single extractor |
—Show verbatim quote (Table 10)Efficiency (%) 90.28 88.12 92.97 92.15 88.57 | none | Performance | 88.6 % | Single extractor |
—Show verbatim quote (Table 10)Throughput (cases/hr) 677.08 624.17 716.67 767.92 516.67 | none | Throughput | 517 cases/hr | Single extractor |
Routine maintenanceGlass Washer Line 5Show verbatim quote (Table 3)Glass Washer Line 5 Routine Maintenance May 7 5.1 2.8 ₦360,000 6.0 | Planned downtime (scheduled maintenance, breaks, no demand) | Lost time | 7.00 hrs | Single extractor |
—Glass Washer Line 5Show verbatim quote (Table 3)Glass Washer Line 5 Routine Maintenance May 7 5.1 2.8 ₦360,000 6.0 | Equipment failure (breakdowns) | Lost time | 5.10 hrs | Single extractor |
—Cooling SystemShow verbatim quote (Table 3)Cooling System Corrective Jun 0 2.6 1.5 ₦320,000 2.5 | Equipment failure (breakdowns) | Lost time | 2.60 hrs | Single extractor |
—Cooling SystemShow verbatim quote (Table 3)Cooling System Corrective Jun 0 2.6 1.5 ₦320,000 2.5 | Equipment failure (breakdowns) | Lost time | 2.50 hrs | Single extractor |
Labeling errors, cap seal failuresShow verbatim quote (Table 7)January 95,000 1,900 Labeling errors, cap seal failures 2.0 Rework and reinspection | Process defects (scrap and rework) | Defect rate | 2.00 % | Single extractor |
Bottle cracks, contaminationShow verbatim quote (Table 7)February 100,000 2,100 Bottle cracks, contamination 2.1 Increased inspection frequency | Process defects (scrap and rework) | Defect rate | 2.10 % | Single extractor |
Filler over/under fill, packagingShow verbatim quote (Table 7)March 92,500 1,850 Filler over/under fill, packaging 2.0 Staff retraining initiated | Process defects (scrap and rework) | Defect rate | 2.00 % | Single extractor |
Seal leaks, label misprintsShow verbatim quote (Table 7)April 110,000 2,200 Seal leaks, label misprints 2.0 Process adjustments and audits | Process defects (scrap and rework) | Defect rate | 2.00 % | Single extractor |
Label adhesion, fill level varianceShow verbatim quote (Table 7)June 112,000 2,240 Label adhesion, fill level variance 2.0 Corrective maintenance | Process defects (scrap and rework) | Defect rate | 2.00 % | Single extractor |
Observation units
- Line 4 - Eva Water 75cl · Whole line or unspecified equipment · Baseline
- Line 3 - Sprite 50cl PET · Whole line or unspecified equipment · Baseline
- Line 2 - Fanta Orange 35cl · Whole line or unspecified equipment · Baseline
- Line 5 - Coca-Cola 1L Glass · Whole line or unspecified equipment · Baseline
- Line 1 - Coca-Cola 50cl PET · Whole line or unspecified equipment · Baseline
- NBC Port Harcourt plant - quality inspection · Whole line or unspecified equipment · Baseline
- Cooling System · Utilities (steam, compressed air, chilled water, power) · Baseline