COMPARATIVE ANALYSIS OF PRODUCTION LINE EFFICIENCY UNDER VARYING DEMAND SCENARIOS USING MULTILAYER PERCEPTRON

Open source

1Bibliographic record

Authors
Raphael Okosiemiema, Okwu Elemchukwu Isaac, Unyeawaji Brownson Ntesat
Year
2026
Venue
World Journal of Advanced Engineering Technology and Sciences
Country
Nigeria
Segment
Soft drinks, bottled water and juices
Process family
Filling and packaging line
Study type
Multiple case study
Extraction scope
Full text
Size
1 plants · 5 lines · 6 machines
Observation period
181 days
Data collection
manual_logs
Intervention
Show the setting as described by the study
The study used production records from the Nigerian Bottling Company (NBC), Port Harcourt plant.

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 11Moderate risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described.2 / 2
Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events).2 / 2
How were loss data collected?Manual logs or maintenance records with unknown completeness.1 / 2
Are OEE, loading time and the loss categories defined explicitly?A standard definition is cited but its application is not shown.1 / 2
Does the loss breakdown account for the total loss it claims to explain?Only the top causes are reported and the unexplained remainder can be computed.1 / 2
Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method.2 / 2
Are the reported numbers internally consistent?Inconsistencies above 10 percentage points, or OEE factors above 100%.0 / 2
Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result.2 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
Conveyor JamConveyor
Show verbatim quote (Table 1)
4 Eva Water 75cl 24 20,000 18,430 3.0 Conveyor Jam 86.2 Inconsistent water supply pressure
Equipment failure (breakdowns)Lost time3.00 hrsAdjudicated
Labeling MisalignmentLabeller
Show verbatim quote (Table 1)
3 Sprite 50cl PET 24 18,500 17,200 2.5 Labeling Misalignment 89.5 Changeover delay
Equipment failure (breakdowns)Lost time2.50 hrsAdjudicated
Capper InconsistencyCapper
Show verbatim quote (Table 1)
2 Fanta Orange 35cl 24 17,000 14,980 4.7 Capper Inconsistency 78.7 Operator shortage
Equipment failure (breakdowns)Lost time4.70 hrsBoth extractors agreed
Glass Breakage Handling
Show verbatim quote (Table 1)
5 Coca- Cola 1L Glass 24 14,000 12,400 5.1 Glass Breakage Handling 74.3 Fragility of packaging material
Equipment failure (breakdowns)Lost time5.10 hrsBoth extractors agreed
Filler MalfunctionFiller Machine
Show verbatim quote (Table 1)
1 Coca- Cola 50cl PET 24 18,000 16,250 3.2 Filler Malfunction 84.2 Low spare part stock
Equipment failure (breakdowns)Lost time3.20 hrsBoth extractors agreed
Cap defects, bottle warping
Show verbatim quote (Table 7)
May 115,000 2,300 Cap defects, bottle warping 2.0 Supplier quality review
Process defects (scrap and rework)Defect rate2.00 %Both extractors agreed
—Labeller Line 3
Show verbatim quote (Table 3)
Labeller Line 3 Preventive Mar 8 1.5 1.0 ₦185,000 2.0
Equipment failure (breakdowns)Lost time2.00 hrsAdjudicated
—Filler Machine Line 1
Show verbatim quote (Table 3)
Filler Machine Line 1 Preventive Jan 10 2.5 1.2 ₦250,000 3.0
Equipment failure (breakdowns)Lost time3.00 hrsBoth extractors agreed
—Conveyor Line 4
Show verbatim quote (Table 3)
Conveyor Line 4 Emergency Repair Apr 0 3.0 3.2 ₦290,000 3.5
Equipment failure (breakdowns)Lost time3.50 hrsAdjudicated
—Glass Washer Line 5
Show verbatim quote (Table 3)
Glass Washer Line 5 Routine Maintenance May 7 5.1 2.8 ₦360,000 6.0
Equipment failure (breakdowns)Lost time6.00 hrsBoth extractors agreed
—Capper Line 2
Show verbatim quote (Table 3)
Capper Line 2 Corrective Feb 0 4.7 2.1 ₦410,000 5.0
Equipment failure (breakdowns)Lost time5.00 hrsBoth extractors agreed
—
Show verbatim quote (Table 1)
1 Coca- Cola 50cl PET 24 18,000 16,250 3.2 Filler Malfunction 84.2 Low spare part stock
noneAvailability84.2 %Single extractor
—
Show verbatim quote (Table 10)
Efficiency (%) 90.28 88.12 92.97 92.15 88.57
nonePerformance90.3 %Single extractor
—
Show verbatim quote (Table 10)
Throughput (cases/hr) 677.08 624.17 716.67 767.92 516.67
noneThroughput677 cases/hrSingle extractor
Preventive maintenanceFiller Machine Line 1
Show verbatim quote (Table 3)
Filler Machine Line 1 Preventive Jan 10 2.5 1.2 ₦250,000 3.0
Planned downtime (scheduled maintenance, breaks, no demand)Lost time10.0 hrsSingle extractor
—Filler Machine Line 1
Show verbatim quote (Table 3)
Filler Machine Line 1 Preventive Jan 10 2.5 1.2 ₦250,000 3.0
Equipment failure (breakdowns)Lost time2.50 hrsSingle extractor
—
Show verbatim quote (Table 1)
2 Fanta Orange 35cl 24 17,000 14,980 4.7 Capper Inconsistency 78.7 Operator shortage
noneAvailability78.7 %Single extractor
—
Show verbatim quote (Table 10)
Efficiency (%) 90.28 88.12 92.97 92.15 88.57
nonePerformance88.1 %Single extractor
—
Show verbatim quote (Table 10)
Throughput (cases/hr) 677.08 624.17 716.67 767.92 516.67
noneThroughput624 cases/hrSingle extractor
—Capper Line 2
Show verbatim quote (Table 3)
Capper Line 2 Corrective Feb 0 4.7 2.1 ₦410,000 5.0
Equipment failure (breakdowns)Lost time4.70 hrsSingle extractor
—
Show verbatim quote (Table 1)
3 Sprite 50cl PET 24 18,500 17,200 2.5 Labeling Misalignment 89.5 Changeover delay
noneAvailability89.5 %Single extractor
—
Show verbatim quote (Table 10)
Efficiency (%) 90.28 88.12 92.97 92.15 88.57
nonePerformance93.0 %Single extractor
—
Show verbatim quote (Table 10)
Throughput (cases/hr) 677.08 624.17 716.67 767.92 516.67
noneThroughput717 cases/hrSingle extractor
Preventive maintenanceLabeller Line 3
Show verbatim quote (Table 3)
Labeller Line 3 Preventive Mar 8 1.5 1.0 ₦185,000 2.0
Planned downtime (scheduled maintenance, breaks, no demand)Lost time8.00 hrsSingle extractor
—Labeller Line 3
Show verbatim quote (Table 3)
Labeller Line 3 Preventive Mar 8 1.5 1.0 ₦185,000 2.0
Equipment failure (breakdowns)Lost time1.50 hrsSingle extractor
—
Show verbatim quote (Table 1)
4 Eva Water 75cl 24 20,000 18,430 3.0 Conveyor Jam 86.2 Inconsistent water supply pressure
noneAvailability86.2 %Single extractor
—
Show verbatim quote (Table 10)
Efficiency (%) 90.28 88.12 92.97 92.15 88.57
nonePerformance92.2 %Single extractor
—
Show verbatim quote (Table 10)
Throughput (cases/hr) 677.08 624.17 716.67 767.92 516.67
noneThroughput768 cases/hrSingle extractor
—Conveyor Line 4
Show verbatim quote (Table 3)
Conveyor Line 4 Emergency Repair Apr 0 3.0 3.2 ₦290,000 3.5
Equipment failure (breakdowns)Lost time3.00 hrsSingle extractor
—
Show verbatim quote (Table 1)
5 Coca- Cola 1L Glass 24 14,000 12,400 5.1 Glass Breakage Handling 74.3 Fragility of packaging material
noneAvailability74.3 %Single extractor
—
Show verbatim quote (Table 10)
Efficiency (%) 90.28 88.12 92.97 92.15 88.57
nonePerformance88.6 %Single extractor
—
Show verbatim quote (Table 10)
Throughput (cases/hr) 677.08 624.17 716.67 767.92 516.67
noneThroughput517 cases/hrSingle extractor
Routine maintenanceGlass Washer Line 5
Show verbatim quote (Table 3)
Glass Washer Line 5 Routine Maintenance May 7 5.1 2.8 ₦360,000 6.0
Planned downtime (scheduled maintenance, breaks, no demand)Lost time7.00 hrsSingle extractor
—Glass Washer Line 5
Show verbatim quote (Table 3)
Glass Washer Line 5 Routine Maintenance May 7 5.1 2.8 ₦360,000 6.0
Equipment failure (breakdowns)Lost time5.10 hrsSingle extractor
—Cooling System
Show verbatim quote (Table 3)
Cooling System Corrective Jun 0 2.6 1.5 ₦320,000 2.5
Equipment failure (breakdowns)Lost time2.60 hrsSingle extractor
—Cooling System
Show verbatim quote (Table 3)
Cooling System Corrective Jun 0 2.6 1.5 ₦320,000 2.5
Equipment failure (breakdowns)Lost time2.50 hrsSingle extractor
Labeling errors, cap seal failures
Show verbatim quote (Table 7)
January 95,000 1,900 Labeling errors, cap seal failures 2.0 Rework and reinspection
Process defects (scrap and rework)Defect rate2.00 %Single extractor
Bottle cracks, contamination
Show verbatim quote (Table 7)
February 100,000 2,100 Bottle cracks, contamination 2.1 Increased inspection frequency
Process defects (scrap and rework)Defect rate2.10 %Single extractor
Filler over/under fill, packaging
Show verbatim quote (Table 7)
March 92,500 1,850 Filler over/under fill, packaging 2.0 Staff retraining initiated
Process defects (scrap and rework)Defect rate2.00 %Single extractor
Seal leaks, label misprints
Show verbatim quote (Table 7)
April 110,000 2,200 Seal leaks, label misprints 2.0 Process adjustments and audits
Process defects (scrap and rework)Defect rate2.00 %Single extractor
Label adhesion, fill level variance
Show verbatim quote (Table 7)
June 112,000 2,240 Label adhesion, fill level variance 2.0 Corrective maintenance
Process defects (scrap and rework)Defect rate2.00 %Single extractor

Observation units

  • Line 4 - Eva Water 75cl · Whole line or unspecified equipment · Baseline
  • Line 3 - Sprite 50cl PET · Whole line or unspecified equipment · Baseline
  • Line 2 - Fanta Orange 35cl · Whole line or unspecified equipment · Baseline
  • Line 5 - Coca-Cola 1L Glass · Whole line or unspecified equipment · Baseline
  • Line 1 - Coca-Cola 50cl PET · Whole line or unspecified equipment · Baseline
  • NBC Port Harcourt plant - quality inspection · Whole line or unspecified equipment · Baseline
  • Cooling System · Utilities (steam, compressed air, chilled water, power) · Baseline