Setup and adjustments

Changeover material staging and organization

In short

It appears in about 1 of every 100 lines studied.

When it appears, it takes on average about 58 % of the line's lost time. Reported by 4 of the 112 studies that could observe it (sparse evidence).

What happens

During a changeover the operator must sort, consolidate or relocate leftover materials, components or packaging inputs from the previous production run before the new format or product can be loaded onto the packaging machine. This housekeeping and staging activity is performed while the equipment is stopped, extending the internal setup time beyond the strict tool or format change.

What is done about it

Apply external-setup practices by pre-staging and kitting the materials and components needed for the next run before the current run ends, and designate a clearly marked holding area for leftover inputs from the previous run so sorting does not occur on stopped equipment. Use changeover checklists and visual workplace organization at the packaging station to shorten the internal portion of the changeover.

Practical guidance written from engineering knowledge; it is not a statistical estimate.

1Probability and evidence

Pooled over all segments. A wide interval is a result: it states how much the evidence allows us to know.
Probability of presence
0.5% [0.1–1.4%]
Expected share of lost time
0.3% [0.1–0.8%]
Share of lost time when present
58% [46–68%]
Studies / units
112 / 155
Evidence grade
D

Grade D: 0 or 1 study; the estimate is driven by partial pooling and priors, and the wide interval is the result.

2Probability by segment

Partially pooled estimates for each industry segment.
  • Dairy products
    0.6% [0.1–2.1%]14 studies
  • Soft drinks, bottled water and juices
    0.5% [0.1–1.7%]33 studies
  • Brewing, wine and spirits
    0.8% [0.1–2.9%]14 studies
  • Bakery and pasta
    0.6% [0.1–2.3%]6 studies
  • Meat, poultry and seafood
    0.6% [0.1–2.3%]6 studies
  • Fruit and vegetable processing
    0.6% [0.1–2.4%]4 studies
  • Grain and oilseed milling
    0.6% [0.1–2.2%]4 studies
  • Sugar and confectionery
    0.6% [0.1–2.2%]4 studies
  • Snacks, coffee, tea and other foods
    0.6% [0.1–2.3%]8 studies
  • Animal feed and pet food
    0.6% [0.1–2.3%]5 studies
  • Food manufacturing (unspecified or mixed)
    0.6% [0.1–2.1%]14 studies

3Mechanism, SCADA signature and countermeasure

Engineering guidance that helps recognise and address the cause; it is not part of the statistical estimate.

Mechanism

Engineering guidance

During a changeover the operator must sort, consolidate or relocate leftover materials, components or packaging inputs from the previous production run before the new format or product can be loaded onto the packaging machine. This housekeeping and staging activity is performed while the equipment is stopped, extending the internal setup time beyond the strict tool or format change.

How it looks in SCADA data

Engineering guidance

Shows up as an extended changeover or setup machine-state duration on the packaging equipment, with no fault or alarm code associated, bounded by the last good pack of the previous order and the first good pack of the new order. The state log typically shows the line idle with upstream and downstream equipment also stopped or starved, and no cycling of actuators during the staging interval.

Countermeasure

Engineering guidance

Apply external-setup practices by pre-staging and kitting the materials and components needed for the next run before the current run ends, and designate a clearly marked holding area for leftover inputs from the previous run so sorting does not occur on stopped equipment. Use changeover checklists and visual workplace organization at the packaging station to shorten the internal portion of the changeover.

4Sources

Every extracted datum with its study, value and verbatim quote.
  1. Lost time: 3.00 min · as reported: “Organize inputs from previous production”
    Show verbatim quote
    20 Organizar insumos da produção anterior 02:15:00 02:18:00 00:03:00 00:03:00 -
  2. Lost time: 3.00 min · as reported: “Organize inputs from previous production”
    Show verbatim quote
    16 Organizar insumos da produção anterior 00:29:00 00:32:00 00:03:00 - 00:03:00
  3. Lost time: 0 min · as reported: “proactive retrieval of Format Parts”
    Show verbatim quote
    Line 6 8 1.0/1.5 0.0 1.0/1.5
  4. Lost time: 0.500 min · as reported: “proactive retrieval of Format Parts”
    Show verbatim quote
    Line 1 6 0.5 0.0 0.5
  5. Lost time: 0 min · as reported: “proactive retrieval of Format Parts”
    Show verbatim quote
    Line 1 6 0.5 0.0 0.5
  6. Lost time: 1.00 min · as reported: “proactive retrieval of Format Parts”
    Show verbatim quote
    Line 2 6 1.0 0.0 1.0
  7. Lost time: 0 min · as reported: “proactive retrieval of Format Parts”
    Show verbatim quote
    Line 2 6 1.0 0.0 1.0
  8. Lost time: 1.00 min · as reported: “proactive retrieval of Format Parts”
    Show verbatim quote
    Line 5 10 1.0 0.0 1.0
  9. Lost time: 0 min · as reported: “proactive retrieval of Format Parts”
    Show verbatim quote
    Line 5 10 1.0 0.0 1.0
  10. Lost time: 1.00 min · as reported: “proactive retrieval of Format Parts”
    Show verbatim quote
    Line 6 8 1.0/1.5 0.0 1.0/1.5