foratvise
Get Started
Included study

Método SMED: Análise e aperfeiçoamento

Open source

1Bibliographic record

Authors
—
Year
—
Venue
—
Country
Brazil
Segment
Soft drinks, bottled water and juices
Process family
Filling and packaging line
Study type
Before/after intervention
Extraction scope
Full text
Size
1 plants · 1 lines · 6 machines
Observation period
213 days
Data collection
manual_logs
Intervention
Show the setting as described by the study
O local onde foi realizado o estudo de caso é a linha de refrigerante PET, que envasa diversos sabores de refrigerantes nos formatos de 250ml e 2000ml.

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 13Low risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described.2 / 2
Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events).2 / 2
How were loss data collected?Manual logs or maintenance records with unknown completeness.1 / 2
Are OEE, loading time and the loss categories defined explicitly?A standard definition is cited but its application is not shown.1 / 2
Does the loss breakdown account for the total loss it claims to explain?The reported causes or categories sum to at least 90% of the stated total, or an explicit "other" class closes the balance.2 / 2
Is there evidence of selective reporting of favourable results?Intervention study in which baseline and post-intervention periods differ in length or method.1 / 2
Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points.2 / 2
Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result.2 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
—Sopradora
Show verbatim quote (Tabela 1)
Sopradora 73 minutos 90 minutos
Setup and adjustmentsMean event duration73.0 minSingle extractor
—Rotuladora
Show verbatim quote (Tabela 1)
Rotuladora 68 minutos 85 minutos
Setup and adjustmentsMean event duration68.0 minSingle extractor
—Enchedora
Show verbatim quote (Tabela 1)
Enchedora 76 minutos 70 minutos
Setup and adjustmentsMean event duration76.0 minSingle extractor
—Paletizador
Show verbatim quote (Tabela 1)
Paletizador 35 minutos 95 minutos
Setup and adjustmentsMean event duration35.0 minSingle extractor
—Embaladora
Show verbatim quote (Tabela 1)
Embaladora 146 minutos 0 minutos
Setup and adjustmentsMean event duration146 minSingle extractor
Separate necessary keys for setupEmbaladora
Show verbatim quote (Tabela 2)
1 Separar as chaves necessárias para setup 00:00:00 00:02:00 00:02:00 00:02:00 -
Setup and adjustmentsLost time2.00 minSingle extractor
Fetch test bottlesEmbaladora
Show verbatim quote (Tabela 2)
2 Buscar garrafas testes 00:02:00 00:04:00 00:02:00 00:02:00 -
Setup and adjustmentsLost time2.00 minSingle extractor
Adjust bottle conveyor guidesEmbaladora
Show verbatim quote (Tabela 2)
3 Ajuste dos guias do transporte de garrafas 00:04:00 00:07:00 00:03:00 00:03:00 -
Setup and adjustmentsLost time3.00 minSingle extractor
Adjust inlet guides (10 guides)Embaladora
Show verbatim quote (Tabela 2)
4 Ajuste dos guias de entrada (10 guias) 00:07:00 00:45:00 00:38:00 00:38:00 -
Setup and adjustmentsLost time38.0 minSingle extractor
Adjust flapsEmbaladora
Show verbatim quote (Tabela 2)
5 Ajuste das aletas 00:45:00 00:58:00 00:13:00 00:13:00 -
Setup and adjustmentsLost time13.0 minSingle extractor
Adjust pneumatic classifierEmbaladora
Show verbatim quote (Tabela 2)
6 Ajuste no classificador pneumáti­ co 00:58:00 01:16:00 00:18:00 00:18:00 -
Setup and adjustmentsLost time18.0 minSingle extractor
Adjust central guides of the packerEmbaladora
Show verbatim quote (Tabela 2)
7 Ajuste dos guias centrais da em­ baladora 01:16:00 01:23:00 00:07:00 00:07:00 -
Setup and adjustmentsLost time7.00 minSingle extractor
Adjust film reading sensorEmbaladora
Show verbatim quote (Tabela 2)
8 Ajuste no sensor de leitura do filme 01:23:00 01:29:00 00:06:00 00:06:00 -
Setup and adjustmentsLost time6.00 minSingle extractor
Change and calculate programEmbaladora
Show verbatim quote (Tabela 2)
9 Troca e cálculo do programa 01:29:00 01:34:00 00:05:00 00:05:00 -
Setup and adjustmentsLost time5.00 minSingle extractor
Loosen guide regulatorEmbaladora
Show verbatim quote (Tabela 2)
10 Afrouxar regulador de guias 01:34:00 01:35:00 00:01:00 00:01:00 -
Setup and adjustmentsLost time1.00 minSingle extractor
Set pusher chain to zero pointEmbaladora
Show verbatim quote (Tabela 2)
11 Colocar a cadeia empurradora no ponto zero 01:35:00 01:40:00 00:05:00 00:05:00 -
Setup and adjustmentsLost time5.00 minSingle extractor
Disengage table regulatorEmbaladora
Show verbatim quote (Tabela 2)
12 Desacoplar regulador da mesa 01:40:00 01:42:00 00:02:00 00:02:00 -
Setup and adjustmentsLost time2.00 minSingle extractor
Set wrapping chain to zero pointEmbaladora
Show verbatim quote (Tabela 2)
13 Colocar cadeia de envolvimento ponto zero 01:42:00 01:48:00 00:06:00 00:06:00 -
Setup and adjustmentsLost time6.00 minSingle extractor
Get 250 ml dividers (verandas)Embaladora
Show verbatim quote (Tabela 2)
14 Pegar varandas de 250 ml 01:48:00 01:50:00 00:02:00 00:02:00 -
Setup and adjustmentsLost time2.00 minSingle extractor
Change dividers positionEmbaladora
Show verbatim quote (Tabela 2)
15 Trocar posição de varandas 01:50:00 01:54:00 00:04:00 00:04:00 -
Setup and adjustmentsLost time4.00 minSingle extractor
Get film for 250 mlEmbaladora
Show verbatim quote (Tabela 2)
16 Pegar filme para 250 ml 01:54:00 02:04:00 00:10:00 00:10:00 -
Setup and adjustmentsLost time10.0 minSingle extractor
Change film from 2 liters to 250 mlEmbaladora
Show verbatim quote (Tabela 2)
17 Trocar filme de 2 litros para 250 ml 02:04:00 02:08:00 00:04:00 00:04:00 -
Setup and adjustmentsLost time4.00 minSingle extractor
Test machineEmbaladora
Show verbatim quote (Tabela 2)
18 Testar máquina 02:08:00 02:12:00 00:04:00 00:04:00 -
Setup and adjustmentsLost time4.00 minSingle extractor
Organize tools used in setupEmbaladora
Show verbatim quote (Tabela 2)
19 Organizar chaves usadas no set­ up 02:12:00 02:15:00 00:03:00 00:03:00 -
Setup and adjustmentsLost time3.00 minSingle extractor
Organize inputs from previous productionEmbaladora
Show verbatim quote (Tabela 2)
20 Organizar insumos da produção anterior 02:15:00 02:18:00 00:03:00 00:03:00 -
Setup and adjustmentsLost time3.00 minSingle extractor
—Embaladora
Show verbatim quote (Tabela 6)
Disponibilidade 88,2% 92,8% 93,3% 93,0% 95,6%
noneAvailability88.2 %Single extractor
—Embaladora
Show verbatim quote (Tabela 6)
Performance 93,6% 91,5% 94,9% 93,9% 93,4%
nonePerformance93.6 %Single extractor
—Embaladora
Show verbatim quote (Tabela 6)
Qualidade 99,5% 99,8% 99,3% 99,8% 99,9%
noneQuality99.5 %Single extractor
—Embaladora
Show verbatim quote (Tabela 6)
OEE 82,2% 84,8% 87,9% 87,2% 89,2%
noneOEE82.2 %Single extractor
—Embaladora
Show verbatim quote (Tabela 6)
Paradas Planejadas 534,74 505,53 591,06 533,38 473,61
Planned downtime (scheduled maintenance, breaks, no demand)Lost time535 hSingle extractor
—Embaladora
Show verbatim quote (Tabela 6)
Quebras / Falhas 0,70 5,90 2,95 5,87 4,10
Equipment failure (breakdowns)Lost time0.700 hSingle extractor
—Embaladora
Show verbatim quote (Tabela 6)
Ajustes 1,58 0,95 1,67 4,25 3,33
Idling and minor stops (micro-stops)Lost time1.58 hSingle extractor
—Embaladora
Show verbatim quote (Tabela 6)
Setups e CIP´s 19,50 10,25 4,03 4,60 4,60
Setup and adjustmentsLost time19.5 hSingle extractor
—Embaladora
Show verbatim quote (Tabela 6)
Pequenas Paradas 0,43 0,90 0,17 0,33 0,87
Idling and minor stops (micro-stops)Lost time0.430 hSingle extractor
—Embaladora
Show verbatim quote (Tabela 6)
Qualidade (horas) 0,00 0,00 0,25 0,20 0,00
Process defects (scrap and rework)Lost time0 hSingle extractor
—Embaladora
Show verbatim quote (Tabela 6)
Retrabalho (horas) 0,76 0,33 0,50 0,25 0,17
Process defects (scrap and rework)Lost time0.760 hSingle extractor
—Embaladora
Show verbatim quote (Seção 5.1)
O tempo total de setup foi reduzido para 40 minutos, sendo 34 minutos de tempo interno e 6 minutos de tempo externo.
Setup and adjustmentsMean event duration40.0 minSingle extractor
Change and calculate programEmbaladora
Show verbatim quote (Tabela 5)
1 Troca e cálculo do programa 00:00:00 00:05:00 00:05:00 - -
Setup and adjustmentsLost time5.00 minSingle extractor
Adjust bottle conveyor guidesEmbaladora
Show verbatim quote (Tabela 5)
2 Ajuste dos guias do transporte de garrafas 00:00:00 00:02:00 00:02:00 00:02:00 -
Setup and adjustmentsLost time2.00 minSingle extractor
Adjust inlet guidesEmbaladora
Show verbatim quote (Tabela 5)
3 Ajuste dos guias de entrada 00:02:00 00:07:00 00:05:00 00:05:00 -
Setup and adjustmentsLost time5.00 minSingle extractor
Adjust flapsEmbaladora
Show verbatim quote (Tabela 5)
4 Ajuste das aletas 00:07:00 00:10:00 00:03:00 00:03:00 -
Setup and adjustmentsLost time3.00 minSingle extractor
Adjust pneumatic classifierEmbaladora
Show verbatim quote (Tabela 5)
5 Ajuste no classificador pneumático 00:10:00 00:14:00 00:04:00 00:04:00 -
Setup and adjustmentsLost time4.00 minSingle extractor
Adjust central guides of the packerEmbaladora
Show verbatim quote (Tabela 5)
6 Ajuste dos guias centrais da embaladora 00:14:00 00:15:00 00:01:00 00:01:00 -
Setup and adjustmentsLost time1.00 minSingle extractor
Adjust film reading sensorEmbaladora
Show verbatim quote (Tabela 5)
7 Ajuste no sensor de leitura do filme 00:15:00 00:16:00 00:01:00 00:01:00 -
Setup and adjustmentsLost time1.00 minSingle extractor
Loosen guide regulatorEmbaladora
Show verbatim quote (Tabela 5)
8 Afrouxar regulador de guias 00:16:00 00:17:00 00:01:00 00:01:00 -
Setup and adjustmentsLost time1.00 minSingle extractor
Set pusher chain to zero pointEmbaladora
Show verbatim quote (Tabela 5)
9 Colocar a cadeia empurradora no ponto zero 00:17:00 00:19:00 00:02:00 00:02:00 -
Setup and adjustmentsLost time2.00 minSingle extractor
Disengage wrapping table regulatorEmbaladora
Show verbatim quote (Tabela 5)
10 Desacoplar regulador mesa de envolvi­ mento 00:19:00 00:20:00 00:01:00 00:01:00 -
Setup and adjustmentsLost time1.00 minSingle extractor
Set wrapping chain to zero pointEmbaladora
Show verbatim quote (Tabela 5)
11 Colocar cadeia envolvimento no ponto zero 00:20:00 00:21:00 00:01:00 00:01:00 -
Setup and adjustmentsLost time1.00 minSingle extractor
Get 250 ml dividers (verandas)Embaladora
Show verbatim quote (Tabela 5)
12 Pegar varandas de 250 ml 00:21:00 00:22:00 00:01:00 - 00:01:00
Setup and adjustmentsLost time1.00 minSingle extractor
Change dividers positionEmbaladora
Show verbatim quote (Tabela 5)
13 Trocar posição de varandas 00:22:00 00:23:00 00:01:00 00:01:00 -
Setup and adjustmentsLost time1.00 minSingle extractor
Get film for 250 mlEmbaladora
Show verbatim quote (Tabela 5)
14 Pegar filme para 250 ml 00:23:00 00:25:00 00:02:00 - 00:02:00
Setup and adjustmentsLost time2.00 minSingle extractor
Change film from 2 liters to 250 mlEmbaladora
Show verbatim quote (Tabela 5)
15 Trocar filme de 2 litros para 250 ml 00:25:00 00:29:00 00:04:00 00:04:00 -
Setup and adjustmentsLost time4.00 minSingle extractor
Organize inputs from previous productionEmbaladora
Show verbatim quote (Tabela 5)
16 Organizar insumos da produção anterior 00:29:00 00:32:00 00:03:00 - 00:03:00
Setup and adjustmentsLost time3.00 minSingle extractor
Clean the equipmentEmbaladora
Show verbatim quote (Tabela 5)
17 Limpeza do equipamento 00:32:00 00:40:00 00:08:00 00:08:00 -
Setup and adjustmentsLost time8.00 minSingle extractor
—Embaladora
Show verbatim quote (Tabela 6)
Disponibilidade 88,2% 92,8% 93,3% 93,0% 95,6%
noneAvailability93.3 %Single extractor
—Embaladora
Show verbatim quote (Tabela 6)
Performance 93,6% 91,5% 94,9% 93,9% 93,4%
nonePerformance94.9 %Single extractor
—Embaladora
Show verbatim quote (Tabela 6)
Qualidade 99,5% 99,8% 99,3% 99,8% 99,9%
noneQuality99.3 %Single extractor
—Embaladora
Show verbatim quote (Tabela 6)
OEE 82,2% 84,8% 87,9% 87,2% 89,2%
noneOEE87.9 %Single extractor
—Embaladora
Show verbatim quote (Tabela 6)
Paradas Planejadas 534,74 505,53 591,06 533,38 473,61
Planned downtime (scheduled maintenance, breaks, no demand)Lost time591 hSingle extractor
—Embaladora
Show verbatim quote (Tabela 6)
Quebras / Falhas 0,70 5,90 2,95 5,87 4,10
Equipment failure (breakdowns)Lost time2.95 hSingle extractor
—Embaladora
Show verbatim quote (Tabela 6)
Ajustes 1,58 0,95 1,67 4,25 3,33
Idling and minor stops (micro-stops)Lost time1.67 hSingle extractor
—Embaladora
Show verbatim quote (Tabela 6)
Setups e CIP´s 19,50 10,25 4,03 4,60 4,60
Setup and adjustmentsLost time4.03 hSingle extractor
—Embaladora
Show verbatim quote (Tabela 6)
Pequenas Paradas 0,43 0,90 0,17 0,33 0,87
Idling and minor stops (micro-stops)Lost time0.170 hSingle extractor
—Embaladora
Show verbatim quote (Tabela 6)
Qualidade (horas) 0,00 0,00 0,25 0,20 0,00
Process defects (scrap and rework)Lost time0.250 hSingle extractor
—Embaladora
Show verbatim quote (Tabela 6)
Retrabalho (horas) 0,76 0,33 0,50 0,25 0,17
Process defects (scrap and rework)Lost time0.500 hSingle extractor
—
Show verbatim quote (Figura 4)
totalizando 294,5 horas (Figura 4) em um semestre de produção de junho a dezembro 2014.
Setup and adjustmentsLost time295 hSingle extractor
—
Show verbatim quote (Seção 4.1)
O tempo total de troca da linha foi de 163 minutos.
Setup and adjustmentsMean event duration163 minSingle extractor
—
Show verbatim quote (Seção 5.2)
Antes do trabalho, o tempo total de setup era de 163 minutos e, após a aplicação do SMED, este tempo foi reduzido para 85 minutos.
Setup and adjustmentsMean event duration85.0 minSingle extractor

Observation units

  • Sopradora · Forming, moulding and depositing · Baseline
  • Rotuladora · Labeling and coding · Baseline
  • Enchedora · Filling · Baseline
  • Paletizador · Packaging (forming, sealing, wrapping, case packing, palletizing) · Baseline
  • Embaladora · Packaging (forming, sealing, wrapping, case packing, palletizing) · Baseline
  • Embaladora · Packaging (forming, sealing, wrapping, case packing, palletizing) · After intervention
  • Linha de produção · Whole line or unspecified equipment · Baseline
  • Linha de produção · Whole line or unspecified equipment · After intervention