Changeover retooling and team briefing downtime

Setup and adjustmentsAvailabilityWhole line or unspecified equipment

In short

It appears in fewer than 1 of every 100 lines studied.

When it appears, it takes on average about 57 % of the line's lost time. Reported by 1 of the 127 studies that could observe it (sparse evidence).

What happens

Production stops while operators dismantle, exchange and refit tooling, guides, moulds or format parts to prepare the line for a different product or package, and while the shift or changeover team gathers for a briefing to align on the plan, safety points and roles before restarting. Both activities are scheduled, non-failure interruptions tied to the organisation of work around a changeover or shift start rather than to a breakdown of equipment.

What is done about it

Standardise and pre-stage changeover kits and tooling, use quick-change or tool-less fixtures, and apply SMED-style parallel task splitting to shorten retooling; schedule briefings to overlap with other unavoidable stoppages (such as warm-up or cleaning) rather than adding dedicated line-down time, and keep briefings short and structured with a fixed agenda.

Practical guidance written from engineering knowledge; it is not a statistical estimate.

1Probability and evidence

Pooled over all segments. A wide interval is a result: it states how much the evidence allows us to know.
Probability of presence
0.5% [0.1–1.4%]
Expected share of lost time
0.3% [0.1–0.8%]
Share of lost time when present
57% [46–67%]
Studies / units
127 / 161
Evidence grade
D

Grade D: 0 or 1 study; the estimate is driven by partial pooling and priors, and the wide interval is the result.

2Probability by segment

Partially pooled estimates for each industry segment.
  • Dairy products
    0.6% [0.1–2.1%]13 studies
  • Soft drinks, bottled water and juices
    0.5% [0.1–1.8%]26 studies
  • Brewing, wine and spirits
    0.6% [0.1–2.1%]11 studies
  • Bakery and pasta
    0.5% [0.1–1.9%]24 studies
  • Meat, poultry and seafood
    0.8% [0.1–3.0%]9 studies
  • Fruit and vegetable processing
    0.6% [0.1–2.3%]7 studies
  • Grain and oilseed milling
    0.6% [0.1–2.2%]6 studies
  • Sugar and confectionery
    0.6% [0.1–2.2%]9 studies
  • Snacks, coffee, tea and other foods
    0.6% [0.1–2.2%]5 studies
  • Animal feed and pet food
    0.6% [0.1–2.1%]7 studies
  • Food manufacturing (unspecified or mixed)
    0.6% [0.1–2.2%]10 studies

3Mechanism, SCADA signature and countermeasure

Engineering guidance that helps recognise and address the cause; it is not part of the statistical estimate.

Mechanism

Engineering guidance

Production stops while operators dismantle, exchange and refit tooling, guides, moulds or format parts to prepare the line for a different product or package, and while the shift or changeover team gathers for a briefing to align on the plan, safety points and roles before restarting. Both activities are scheduled, non-failure interruptions tied to the organisation of work around a changeover or shift start rather than to a breakdown of equipment.

How it looks in SCADA data

Engineering guidance

MES/SCADA shows the line in a changeover or stopped state with no fault alarm active, a logged changeover or downtime reason code of retooling or meeting type, and a flat production counter for the duration of the event; the state typically starts at a scheduled time such as shift start or a planned format switch and ends when the first unit after restart is logged.

Countermeasure

Engineering guidance

Standardise and pre-stage changeover kits and tooling, use quick-change or tool-less fixtures, and apply SMED-style parallel task splitting to shorten retooling; schedule briefings to overlap with other unavoidable stoppages (such as warm-up or cleaning) rather than adding dedicated line-down time, and keep briefings short and structured with a fixed agenda.

4Sources

Every extracted datum with its study, value and verbatim quote.
  1. Lost time: 14.0 min · as reported: “Team Briefing”
    Show verbatim quote
    Team Briefing 4 10 14
  2. Lost time: 5,602 h · as reported: “retooling”
    Show verbatim quote
    A look at Fig. 6 revelas that retooling consumed up to 23% of the overall working hours adding up to 5602 hours in 2014.
  3. Share of planned time: 23.0 % · as reported: “retooling”
    Show verbatim quote
    A look at Fig. 6 revelas that retooling consumed up to 23% of the overall working hours adding up to 5602 hours in 2014.