External supply disruption (utilities or spare parts)

In short

It appears in fewer than 1 of every 100 lines studied.

When it appears, it takes on average about 56 % of the line's lost time. Reported by 0 of the 127 studies that could observe it (sparse evidence).

What happens

The line stops because an external resource the plant depends on becomes unavailable: an interruption in a purchased utility such as electricity, steam, compressed air or water, or a delay in receiving an outsourced spare part needed to keep equipment running. The cause lies outside the direct control of line operators and maintenance, originating with a supplier or an external network.

What is done about it

Typical countermeasures include securing backup or redundant utility capacity (generators, accumulators, dual feeds), negotiating service-level agreements with utility and parts suppliers, and holding critical spare parts in local inventory rather than relying on external procurement on demand.

Practical guidance written from engineering knowledge; it is not a statistical estimate.

1Probability and evidence

Pooled over all segments. A wide interval is a result: it states how much the evidence allows us to know.
Probability of presence
0.4% [0.1–1.1%]
Expected share of lost time
0.2% [0.0–0.6%]
Share of lost time when present
56% [45–66%]
Studies / units
127 / 161
Evidence grade
D

Grade D: 0 or 1 study; the estimate is driven by partial pooling and priors, and the wide interval is the result.

2Probability by segment

Partially pooled estimates for each industry segment.
  • Dairy products
    0.4% [0.0–1.7%]13 studies
  • Soft drinks, bottled water and juices
    0.4% [0.0–1.6%]26 studies
  • Brewing, wine and spirits
    0.4% [0.0–1.7%]11 studies
  • Bakery and pasta
    0.4% [0.0–1.5%]24 studies
  • Meat, poultry and seafood
    0.4% [0.0–1.8%]9 studies
  • Fruit and vegetable processing
    0.4% [0.0–1.8%]7 studies
  • Grain and oilseed milling
    0.4% [0.0–1.8%]6 studies
  • Sugar and confectionery
    0.4% [0.0–1.7%]9 studies
  • Snacks, coffee, tea and other foods
    0.4% [0.0–1.7%]5 studies
  • Animal feed and pet food
    0.4% [0.0–1.7%]7 studies
  • Food manufacturing (unspecified or mixed)
    0.4% [0.0–1.7%]10 studies

3Mechanism, SCADA signature and countermeasure

Engineering guidance that helps recognise and address the cause; it is not part of the statistical estimate.

Mechanism

Engineering guidance

The line stops because an external resource the plant depends on becomes unavailable: an interruption in a purchased utility such as electricity, steam, compressed air or water, or a delay in receiving an outsourced spare part needed to keep equipment running. The cause lies outside the direct control of line operators and maintenance, originating with a supplier or an external network.

How it looks in SCADA data

Engineering guidance

SCADA/MES shows a line-wide or utility-wide stop state with no associated machine fault code, often coinciding with a utility tag (pressure, voltage, flow) dropping out of range or going to zero; alternatively, an equipment-failure stop is prolonged far beyond typical repair time while the line remains in a waiting-for-parts state. Downstream and upstream stations enter starvation or blocking simultaneously across the whole line.

Countermeasure

Engineering guidance

Typical countermeasures include securing backup or redundant utility capacity (generators, accumulators, dual feeds), negotiating service-level agreements with utility and parts suppliers, and holding critical spare parts in local inventory rather than relying on external procurement on demand.

4Sources

Every extracted datum with its study, value and verbatim quote.
  1. Lost time: 72.0 min · as reported: “Utilities supply”
    Show verbatim quote
    Utilities supply 215 305 117 205 414 59 65 72 137 149 162 138
  2. Lost time: 205 min · as reported: “Utilities supply”
    Show verbatim quote
    Utilities supply 215 305 117 205 414 59 65 72 137 149 162 138
  3. Lost time: 414 min · as reported: “Utilities supply”
    Show verbatim quote
    Utilities supply 215 305 117 205 414 59 65 72 137 149 162 138
  4. Lost time: 117 min · as reported: “Utilities supply”
    Show verbatim quote
    Utilities supply 215 305 117 205 414 59 65 72 137 149 162 138
  5. Lost time: 305 min · as reported: “Utilities supply”
    Show verbatim quote
    Utilities supply 215 305 117 205 414 59 65 72 137 149 162 138
  6. Lost time: 215 min · as reported: “Utilities supply”
    Show verbatim quote
    Utilities supply 215 305 117 205 414 59 65 72 137 149 162 138
  7. Lost time: 59.0 min · as reported: “Utilities supply”
    Show verbatim quote
    Utilities supply 215 305 117 205 414 59 65 72 137 149 162 138
  8. Lost time: 65.0 min · as reported: “Utilities supply”
    Show verbatim quote
    Utilities supply 215 305 117 205 414 59 65 72 137 149 162 138
  9. Lost time: 137 min · as reported: “Utilities supply”
    Show verbatim quote
    Utilities supply 215 305 117 205 414 59 65 72 137 149 162 138
  10. Lost time: 149 min · as reported: “Utilities supply”
    Show verbatim quote
    Utilities supply 215 305 117 205 414 59 65 72 137 149 162 138
  11. Lost time: 162 min · as reported: “Utilities supply”
    Show verbatim quote
    Utilities supply 215 305 117 205 414 59 65 72 137 149 162 138
  12. Lost time: 138 min · as reported: “Utilities supply”
    Show verbatim quote
    Utilities supply 215 305 117 205 414 59 65 72 137 149 162 138
  13. Share of planned time: 2.56 % · as reported: “outsourced spare parts supply”
    Show verbatim quote
    High downtime rate due to outsourced spare parts supply 2.56% 1.95% 0.61%