External supply disruption (utilities or spare parts)
In short
It appears in fewer than 1 of every 100 lines studied.
When it appears, it takes on average about 56 % of the line's lost time. Reported by 0 of the 127 studies that could observe it (sparse evidence).
What happens
The line stops because an external resource the plant depends on becomes unavailable: an interruption in a purchased utility such as electricity, steam, compressed air or water, or a delay in receiving an outsourced spare part needed to keep equipment running. The cause lies outside the direct control of line operators and maintenance, originating with a supplier or an external network.
What is done about it
Typical countermeasures include securing backup or redundant utility capacity (generators, accumulators, dual feeds), negotiating service-level agreements with utility and parts suppliers, and holding critical spare parts in local inventory rather than relying on external procurement on demand.
Practical guidance written from engineering knowledge; it is not a statistical estimate.
1Probability and evidence
- Probability of presence
- 0.4% [0.1–1.1%]
- Expected share of lost time
- 0.2% [0.0–0.6%]
- Share of lost time when present
- 56% [45–66%]
- Studies / units
- 127 / 161
- Evidence grade
- D
Grade D: 0 or 1 study; the estimate is driven by partial pooling and priors, and the wide interval is the result.
2Probability by segment
- Dairy products0.4% [0.0–1.7%]13 studies
- Soft drinks, bottled water and juices0.4% [0.0–1.6%]26 studies
- Brewing, wine and spirits0.4% [0.0–1.7%]11 studies
- Bakery and pasta0.4% [0.0–1.5%]24 studies
- Meat, poultry and seafood0.4% [0.0–1.8%]9 studies
- Fruit and vegetable processing0.4% [0.0–1.8%]7 studies
- Grain and oilseed milling0.4% [0.0–1.8%]6 studies
- Sugar and confectionery0.4% [0.0–1.7%]9 studies
- Snacks, coffee, tea and other foods0.4% [0.0–1.7%]5 studies
- Animal feed and pet food0.4% [0.0–1.7%]7 studies
- Food manufacturing (unspecified or mixed)0.4% [0.0–1.7%]10 studies
3Mechanism, SCADA signature and countermeasure
Mechanism
Engineering guidanceThe line stops because an external resource the plant depends on becomes unavailable: an interruption in a purchased utility such as electricity, steam, compressed air or water, or a delay in receiving an outsourced spare part needed to keep equipment running. The cause lies outside the direct control of line operators and maintenance, originating with a supplier or an external network.
How it looks in SCADA data
Engineering guidanceSCADA/MES shows a line-wide or utility-wide stop state with no associated machine fault code, often coinciding with a utility tag (pressure, voltage, flow) dropping out of range or going to zero; alternatively, an equipment-failure stop is prolonged far beyond typical repair time while the line remains in a waiting-for-parts state. Downstream and upstream stations enter starvation or blocking simultaneously across the whole line.
Countermeasure
Engineering guidanceTypical countermeasures include securing backup or redundant utility capacity (generators, accumulators, dual feeds), negotiating service-level agreements with utility and parts suppliers, and holding critical spare parts in local inventory rather than relying on external procurement on demand.
4Sources
- Reduction of Machine Breakdown in the Brewery Manufacturing Company, A Case Study of Brewery “A” in the Eastern Nigeria (2023)Open sourceLost time: 72.0 min · as reported: “Utilities supply”
Show verbatim quote
Utilities supply 215 305 117 205 414 59 65 72 137 149 162 138
- Reduction of Machine Breakdown in the Brewery Manufacturing Company, A Case Study of Brewery “A” in the Eastern Nigeria (2023)Open sourceLost time: 205 min · as reported: “Utilities supply”
Show verbatim quote
Utilities supply 215 305 117 205 414 59 65 72 137 149 162 138
- Reduction of Machine Breakdown in the Brewery Manufacturing Company, A Case Study of Brewery “A” in the Eastern Nigeria (2023)Open sourceLost time: 414 min · as reported: “Utilities supply”
Show verbatim quote
Utilities supply 215 305 117 205 414 59 65 72 137 149 162 138
- Reduction of Machine Breakdown in the Brewery Manufacturing Company, A Case Study of Brewery “A” in the Eastern Nigeria (2023)Open sourceLost time: 117 min · as reported: “Utilities supply”
Show verbatim quote
Utilities supply 215 305 117 205 414 59 65 72 137 149 162 138
- Reduction of Machine Breakdown in the Brewery Manufacturing Company, A Case Study of Brewery “A” in the Eastern Nigeria (2023)Open sourceLost time: 305 min · as reported: “Utilities supply”
Show verbatim quote
Utilities supply 215 305 117 205 414 59 65 72 137 149 162 138
- Reduction of Machine Breakdown in the Brewery Manufacturing Company, A Case Study of Brewery “A” in the Eastern Nigeria (2023)Open sourceLost time: 215 min · as reported: “Utilities supply”
Show verbatim quote
Utilities supply 215 305 117 205 414 59 65 72 137 149 162 138
- Reduction of Machine Breakdown in the Brewery Manufacturing Company, A Case Study of Brewery “A” in the Eastern Nigeria (2023)Open sourceLost time: 59.0 min · as reported: “Utilities supply”
Show verbatim quote
Utilities supply 215 305 117 205 414 59 65 72 137 149 162 138
- Reduction of Machine Breakdown in the Brewery Manufacturing Company, A Case Study of Brewery “A” in the Eastern Nigeria (2023)Open sourceLost time: 65.0 min · as reported: “Utilities supply”
Show verbatim quote
Utilities supply 215 305 117 205 414 59 65 72 137 149 162 138
- Reduction of Machine Breakdown in the Brewery Manufacturing Company, A Case Study of Brewery “A” in the Eastern Nigeria (2023)Open sourceLost time: 137 min · as reported: “Utilities supply”
Show verbatim quote
Utilities supply 215 305 117 205 414 59 65 72 137 149 162 138
- Reduction of Machine Breakdown in the Brewery Manufacturing Company, A Case Study of Brewery “A” in the Eastern Nigeria (2023)Open sourceLost time: 149 min · as reported: “Utilities supply”
Show verbatim quote
Utilities supply 215 305 117 205 414 59 65 72 137 149 162 138
- Reduction of Machine Breakdown in the Brewery Manufacturing Company, A Case Study of Brewery “A” in the Eastern Nigeria (2023)Open sourceLost time: 162 min · as reported: “Utilities supply”
Show verbatim quote
Utilities supply 215 305 117 205 414 59 65 72 137 149 162 138
- Reduction of Machine Breakdown in the Brewery Manufacturing Company, A Case Study of Brewery “A” in the Eastern Nigeria (2023)Open sourceLost time: 138 min · as reported: “Utilities supply”
Show verbatim quote
Utilities supply 215 305 117 205 414 59 65 72 137 149 162 138
- Innovation in Smart Maintenance: An IoT-Based Strategy to Improve Packaging Machine Availability in a SME (2025)Open sourceShare of planned time: 2.56 % · as reported: “outsourced spare parts supply”
Show verbatim quote
High downtime rate due to outsourced spare parts supply 2.56% 1.95% 0.61%