Innovation in Smart Maintenance: An IoT-Based Strategy to Improve Packaging Machine Availability in a SME

Open source

1Bibliographic record

Authors
Susy Delzo-Fajardo, Rosa Grandez-Ulloa, Martin Saenz-Moron, Anita Straujuma
Year
2025
Venue
LACCEI International Multiconference on Entrepreneurship, Innovation and Regional Development (LEIRD)
Country
Peru
Segment
Grain and oilseed milling
Process family
Filling and packaging line
Study type
Before/after intervention
Extraction scope
Full text
Size
1 plants · 1 lines · 2 machines
Observation period
365 days
Data collection
maintenance_records
Intervention
Show the setting as described by the study
a SME in the food industry dedicated to the production and packaging of cereal-based products, a significant problem has been identified: low availability of the two machines on the oat-packaging line.

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 9Moderate risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product or sector is given but the equipment or process is only partly described.1 / 2
Is the observation period long enough and reported?Period reported but shorter than 30 days, or only the number of shifts is given.1 / 2
How were loss data collected?Manual logs or maintenance records with unknown completeness.1 / 2
Are OEE, loading time and the loss categories defined explicitly?A standard definition is cited but its application is not shown.1 / 2
Does the loss breakdown account for the total loss it claims to explain?Only the top causes are reported and the unexplained remainder can be computed.1 / 2
Is there evidence of selective reporting of favourable results?Intervention study in which baseline and post-intervention periods differ in length or method.1 / 2
Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked.1 / 2
Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result.2 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
material supply delays
Show verbatim quote (Table II (continued))
High downtime rate due to material supply delays 2.44% 1.85% 0.63%
Organizational or external stops (material or personnel shortage, utilities outage)Share of planned time2.44 %Both extractors agreed
outsourced spare parts supply
Show verbatim quote (Table II (continued))
High downtime rate due to outsourced spare parts supply 2.56% 1.95% 0.61%
Organizational or external stops (material or personnel shortage, utilities outage)Share of planned time2.56 %Both extractors agreed
friction between components caused by burnt lubricant
Show verbatim quote (Table II (continued))
High downtime rate due to friction between components caused by burnt lubricant 3.45% 2.17% 2.90%
Idling and minor stops (micro-stops)Share of planned time3.45 %Both extractors agreed
recurrent failures in mechanical and pneumatic components
Show verbatim quote (Table II)
High downtime rate due to recurrent failures in mechanical and pneumatic components 7.65% 1.03% 2.06%
Equipment failure (breakdowns)Share of planned time7.65 %Both extractors agreed
component blockage caused by residue buildup
Show verbatim quote (Table II)
High downtime rate due to component blockage caused by residue buildup 10.39% 6.52% 3.48%
Idling and minor stops (micro-stops)Share of planned time10.4 %Both extractors agreed
unplanned downtime
Show verbatim quote (Table III)
High rate of unplanned downtime 21.49% 6.63% 8.45%
Not classifiable from the reportShare of planned time21.5 %Both extractors agreed
stockouts of spare parts and maintenance materials
Show verbatim quote (Table III)
High downtime rate due to stockouts 5% 3.80% 1.24%
Organizational or external stops (material or personnel shortage, utilities outage)Share of planned time5.00 %Both extractors agreed
—
Show verbatim quote (Table IV)
Availability 86.64% 90% 95.36%
noneAvailability86.6 %Both extractors agreed
unplanned downtime
Show verbatim quote (Conclusions)
unplanned downtime was reduced by 68.68%, from 445 hours to 139.4 hours, due to the incorporation of scheduled downtime for the execution of periodic maintenance activities
Not classifiable from the reportLost time445 hSingle extractor
stockouts of spare parts and maintenance materials
Show verbatim quote (Conclusions)
stockouts of spare parts and maintenance materials were reduced by shortening supply lead times by 78.78%, from 84 hours to 17.82 hours
Organizational or external stops (material or personnel shortage, utilities outage)Lost time84.0 hSingle extractor
—Packaging Machine 1
Show verbatim quote (Table I)
Time between stops of Packaging Machine 1 EXPO(1400)
Not classifiable from the reportTime between events1,400 minSingle extractor
—Packaging Machine 2
Show verbatim quote (Table I)
Time between stops of Packaging Machine 2 EXPO(1344)
Not classifiable from the reportTime between events1,344 minSingle extractor

Observation units

  • Oatmeal packaging line (Machines 1 and 2, aggregate) · Whole line or unspecified equipment · Baseline
  • Packaging Machine 1 · Packaging (forming, sealing, wrapping, case packing, palletizing) · Baseline
  • Packaging Machine 2 · Packaging (forming, sealing, wrapping, case packing, palletizing) · Baseline