Included study
Innovation in Smart Maintenance: An IoT-Based Strategy to Improve Packaging Machine Availability in a SME
1Bibliographic record
- Authors
- Susy Delzo-Fajardo, Rosa Grandez-Ulloa, Martin Saenz-Moron, Anita Straujuma
- Year
- 2025
- Venue
- LACCEI International Multiconference on Entrepreneurship, Innovation and Regional Development (LEIRD)
- Country
- Peru
- Segment
- Grain and oilseed milling
- Process family
- Filling and packaging line
- Study type
- Before/after intervention
- Extraction scope
- Full text
- Size
- 1 plants · 1 lines · 2 machines
- Observation period
- 365 days
- Data collection
- maintenance_records
- Intervention
Show the setting as described by the study
a SME in the food industry dedicated to the production and packaging of cereal-based products, a significant problem has been identified: low availability of the two machines on the oat-packaging line.
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 9Moderate risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product or sector is given but the equipment or process is only partly described. | 1 / 2 |
| Is the observation period long enough and reported?Period reported but shorter than 30 days, or only the number of shifts is given. | 1 / 2 |
| How were loss data collected?Manual logs or maintenance records with unknown completeness. | 1 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?A standard definition is cited but its application is not shown. | 1 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?Only the top causes are reported and the unexplained remainder can be computed. | 1 / 2 |
| Is there evidence of selective reporting of favourable results?Intervention study in which baseline and post-intervention periods differ in length or method. | 1 / 2 |
| Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked. | 1 / 2 |
| Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result. | 2 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
material supply delaysShow verbatim quote (Table II (continued))High downtime rate due to material supply delays 2.44% 1.85% 0.63% | Organizational or external stops (material or personnel shortage, utilities outage) | Share of planned time | 2.44 % | Both extractors agreed |
outsourced spare parts supplyShow verbatim quote (Table II (continued))High downtime rate due to outsourced spare parts supply 2.56% 1.95% 0.61% | Organizational or external stops (material or personnel shortage, utilities outage) | Share of planned time | 2.56 % | Both extractors agreed |
friction between components caused by burnt lubricantShow verbatim quote (Table II (continued))High downtime rate due to friction between components caused by burnt lubricant 3.45% 2.17% 2.90% | Idling and minor stops (micro-stops) | Share of planned time | 3.45 % | Both extractors agreed |
recurrent failures in mechanical and pneumatic componentsShow verbatim quote (Table II)High downtime rate due to recurrent failures in mechanical and pneumatic components 7.65% 1.03% 2.06% | Equipment failure (breakdowns) | Share of planned time | 7.65 % | Both extractors agreed |
component blockage caused by residue buildupShow verbatim quote (Table II)High downtime rate due to component blockage caused by residue buildup 10.39% 6.52% 3.48% | Idling and minor stops (micro-stops) | Share of planned time | 10.4 % | Both extractors agreed |
unplanned downtimeShow verbatim quote (Table III)High rate of unplanned downtime 21.49% 6.63% 8.45% | Not classifiable from the report | Share of planned time | 21.5 % | Both extractors agreed |
stockouts of spare parts and maintenance materialsShow verbatim quote (Table III)High downtime rate due to stockouts 5% 3.80% 1.24% | Organizational or external stops (material or personnel shortage, utilities outage) | Share of planned time | 5.00 % | Both extractors agreed |
—Show verbatim quote (Table IV)Availability 86.64% 90% 95.36% | none | Availability | 86.6 % | Both extractors agreed |
unplanned downtimeShow verbatim quote (Conclusions)unplanned downtime was reduced by 68.68%, from 445 hours to 139.4 hours, due to the incorporation of scheduled downtime for the execution of periodic maintenance activities | Not classifiable from the report | Lost time | 445 h | Single extractor |
stockouts of spare parts and maintenance materialsShow verbatim quote (Conclusions)stockouts of spare parts and maintenance materials were reduced by shortening supply lead times by 78.78%, from 84 hours to 17.82 hours | Organizational or external stops (material or personnel shortage, utilities outage) | Lost time | 84.0 h | Single extractor |
—Packaging Machine 1Show verbatim quote (Table I)Time between stops of Packaging Machine 1 EXPO(1400) | Not classifiable from the report | Time between events | 1,400 min | Single extractor |
—Packaging Machine 2Show verbatim quote (Table I)Time between stops of Packaging Machine 2 EXPO(1344) | Not classifiable from the report | Time between events | 1,344 min | Single extractor |
Observation units
- Oatmeal packaging line (Machines 1 and 2, aggregate) · Whole line or unspecified equipment · Baseline
- Packaging Machine 1 · Packaging (forming, sealing, wrapping, case packing, palletizing) · Baseline
- Packaging Machine 2 · Packaging (forming, sealing, wrapping, case packing, palletizing) · Baseline

