In short

It appears in about 1 of every 100 lines studied.

When it appears, it takes on average about 56 % of the line's lost time. Reported by 2 of the 120 studies that could observe it (limited evidence).

What happens

A product or format change on the filling machine requires removing and fitting the weight/format-specific tooling (nozzles, guides, change parts) before production can resume, with the task performed either by a single operator or split between two operators working in parallel. The mechanical disassembly, part swap, reassembly and verification steps keep the machine in a non-productive changeover state regardless of crew size, though staffing affects how long the state lasts.

What is done about it

Standardize the retooling procedure with quick-change/tool-less fittings, pre-kit the change parts, and apply parallel/split-task methods (SMED) with an additional operator to shorten the changeover window. Train crews on a documented sequence and verify setup with a go/no-go check before restart.

Practical guidance written from engineering knowledge; it is not a statistical estimate.

1Probability and evidence

Pooled over all segments. A wide interval is a result: it states how much the evidence allows us to know.
Probability of presence
0.7% [0.2–1.9%]
Expected share of lost time
0.4% [0.1–1.1%]
Share of lost time when present
56% [43–67%]
Studies / units
120 / 162
Evidence grade
C

Grade C: 2 to 4 studies, or an interval wider than 0.35.

2Probability by segment

Partially pooled estimates for each industry segment.
  • Dairy products
    0.8% [0.1–2.7%]18 studies
  • Soft drinks, bottled water and juices
    0.6% [0.1–1.9%]44 studies
  • Brewing, wine and spirits
    0.8% [0.1–2.6%]16 studies
  • Bakery and pasta
    0.9% [0.1–3.3%]0 studies
  • Meat, poultry and seafood
    1.7% [0.2–5.9%]6 studies
  • Fruit and vegetable processing
    0.8% [0.1–3.1%]4 studies
  • Grain and oilseed milling
    0.8% [0.1–2.9%]6 studies
  • Sugar and confectionery
    0.8% [0.1–3.2%]3 studies
  • Snacks, coffee, tea and other foods
    0.8% [0.1–3.1%]6 studies
  • Animal feed and pet food
    0.8% [0.1–3.1%]4 studies
  • Food manufacturing (unspecified or mixed)
    0.8% [0.1–2.9%]13 studies

3Mechanism, SCADA signature and countermeasure

Engineering guidance that helps recognise and address the cause; it is not part of the statistical estimate.

Mechanism

Engineering guidance

A product or format change on the filling machine requires removing and fitting the weight/format-specific tooling (nozzles, guides, change parts) before production can resume, with the task performed either by a single operator or split between two operators working in parallel. The mechanical disassembly, part swap, reassembly and verification steps keep the machine in a non-productive changeover state regardless of crew size, though staffing affects how long the state lasts.

How it looks in SCADA data

Engineering guidance

MES/SCADA shows the filler in a changeover or setup machine-state between the last good unit of the previous run and the first good unit of the new run, with no cycle counts incrementing. Duration of this state varies with the number of operators logged against the changeover task, and downstream conveyors/accumulators show starvation during the whole window.

Countermeasure

Engineering guidance

Standardize the retooling procedure with quick-change/tool-less fittings, pre-kit the change parts, and apply parallel/split-task methods (SMED) with an additional operator to shorten the changeover window. Train crews on a documented sequence and verify setup with a go/no-go check before restart.

4Sources

Every extracted datum with its study, value and verbatim quote.
  1. Mean event duration: 11.5 min · as reported: “retooling (two workers, parallel operations)”
    Show verbatim quote
    The time of retooling was reduced from 17.5 minutes to 11.5 minutes.
  2. Mean event duration: 17.5 min · as reported: “retooling (one worker)”
    Show verbatim quote
    The total time of retooling using one worker (Current state in Fig. 9) is 17.5 minutes involving 9 activities (A,B,C,D,E,F,G,H,I).
  3. Lost time: 2.00 min · as reported: “Transport die to the machine”
    Show verbatim quote
    Transport die to the machine 2 min 4 min External
  4. Lost time: 5.00 min · as reported: “Program the machine”
    Show verbatim quote
    Program the machine 5 min 15 min Internal
  5. Lost time: 6.00 min · as reported: “Change machine die”
    Show verbatim quote
    Change machine die 6 min 10 min Internal
  6. Share of lost time: 33.0 % · as reported: “Change machine die”
    Show verbatim quote
    The total changeover time is 18 min and changing the die takes almost 33% of this time while programming the machine takes 27%.
  7. Share of lost time: 27.0 % · as reported: “Program the machine”
    Show verbatim quote
    The total changeover time is 18 min and changing the die takes almost 33% of this time while programming the machine takes 27%.
  8. Lost time: 2.00 min · as reported: “Transport die to the machine”
    Show verbatim quote
    Transport die to the machine | 2 min | 4 min | External
  9. Lost time: 2.00 min · as reported: “Change machine die”
    Show verbatim quote
    Change machine die | 2 min | 6 min | Internal
  10. Lost time: 1.00 min · as reported: “Programming machine”
    Show verbatim quote
    Programming machine | 1 min | 8 min | Internal