In short

It appears in about 1 of every 100 lines studied.

When it appears, it takes on average about 57 % of the line's lost time. Reported by 3 of the 127 studies that could observe it (limited evidence).

What happens

Bringing the line from a stopped, format-change or shift-change condition back to stable running requires sequential warm-up, synchronization and fine-tuning of each station (filler, former, capper, conveyors), and this transition period produces no good output or only unstable, low-quality output. The same elapsed time also appears when switching between product lines, since downstream equipment and controls must re-stabilize before steady production is reached.

What is done about it

Standardize and document startup and line-crossover sequences, use checklists and pre-staged setpoints recipes, pre-heat or pre-condition critical equipment before the scheduled start, and apply quick-changeover (SMED) principles with parallelized preparation tasks to shorten the transition window.

Practical guidance written from engineering knowledge; it is not a statistical estimate.

1Probability and evidence

Pooled over all segments. A wide interval is a result: it states how much the evidence allows us to know.
Probability of presence
0.9% [0.3–2.2%]
Expected share of lost time
0.5% [0.1–1.3%]
Share of lost time when present
57% [45–67%]
Studies / units
127 / 161
Evidence grade
C

Grade C: 2 to 4 studies, or an interval wider than 0.35.

2Probability by segment

Partially pooled estimates for each industry segment.
  • Dairy products
    2.1% [0.3–6.7%]13 studies
  • Soft drinks, bottled water and juices
    0.9% [0.1–2.7%]26 studies
  • Brewing, wine and spirits
    1.0% [0.1–3.2%]11 studies
  • Bakery and pasta
    1.3% [0.2–4.0%]24 studies
  • Meat, poultry and seafood
    1.0% [0.1–3.3%]9 studies
  • Fruit and vegetable processing
    1.1% [0.1–3.7%]7 studies
  • Grain and oilseed milling
    1.1% [0.1–3.9%]6 studies
  • Sugar and confectionery
    1.0% [0.1–3.6%]9 studies
  • Snacks, coffee, tea and other foods
    1.0% [0.1–3.4%]5 studies
  • Animal feed and pet food
    1.0% [0.1–3.4%]7 studies
  • Food manufacturing (unspecified or mixed)
    1.0% [0.1–3.8%]10 studies

3Mechanism, SCADA signature and countermeasure

Engineering guidance that helps recognise and address the cause; it is not part of the statistical estimate.

Mechanism

Engineering guidance

Bringing the line from a stopped, format-change or shift-change condition back to stable running requires sequential warm-up, synchronization and fine-tuning of each station (filler, former, capper, conveyors), and this transition period produces no good output or only unstable, low-quality output. The same elapsed time also appears when switching between product lines, since downstream equipment and controls must re-stabilize before steady production is reached.

How it looks in SCADA data

Engineering guidance

MES/SCADA shows an extended machine-state segment labeled startup, warm-up or changeover, with speed and output ramping gradually from zero to target, delayed timestamp of first good unit, and frequent micro-adjustments to setpoints during that window; neighboring stations remain starved or idle until the sequence completes.

Countermeasure

Engineering guidance

Standardize and document startup and line-crossover sequences, use checklists and pre-staged setpoints recipes, pre-heat or pre-condition critical equipment before the scheduled start, and apply quick-changeover (SMED) principles with parallelized preparation tasks to shorten the transition window.

4Sources

Every extracted datum with its study, value and verbatim quote.
  1. Share of lost time: 12.0 % · as reported: “Demora en arranque de líneas”
    Show verbatim quote
    Demora en arranque de líneas 118 784 12.0% 79.7%
  2. Lost time: 118 h · as reported: “Demora en arranque de líneas”
    Show verbatim quote
    Demora en arranque de líneas 118 784 12.0% 79.7%
  3. Lost time: 49.0 h · as reported: “Demora en cruce de líneas”
    Show verbatim quote
    Demora en cruce de líneas 49 902 5.0% 91.7%
  4. Share of lost time: 5.00 % · as reported: “Demora en cruce de líneas”
    Show verbatim quote
    Demora en cruce de líneas 49 902 5.0% 91.7%
  5. Lost time: 38.6 Ton · as reported: “Arranque de Línea”
    Show verbatim quote
    pasando así de 57.9 toneladas de mema en el primer trimestre por 38.6 toneladas para el tercer trimestre del 2013, lo que representa un beneficio significativo del 34.6%
  6. Lost time: 57.9 Ton · as reported: “Arranque de Línea”
    Show verbatim quote
    pasando así de 57.9 toneladas de mema en el primer trimestre por 38.6 toneladas para el tercer trimestre del 2013, lo que representa un beneficio significativo del 34.6%
  7. Mean event duration: 24.6 min · as reported: “Tiempo de arranque de línea”
    Show verbatim quote
    la línea Laminadora, de 24.59 min a 15.69 min.
  8. Mean event duration: 28.8 min · as reported: “Tiempo de arranque de línea”
    Show verbatim quote
    Respecto a los tiempos de arranque, la línea Boleadora disminuyó de 28.83 a 19.63 min y la línea Laminadora, de 24.59 min a 15.69 min.
  9. Lost time: 85.0 min · as reported: “Arranque de linha”
    Show verbatim quote
    Arranque de linha 2 100 98,64 € 85
  10. Number of events: 2.00 events · as reported: “Arranque de linha”
    Show verbatim quote
    Arranque de linha 2 100 98,64 € 85