The problem of waste in the food industries

Open source

1Bibliographic record

Authors
Maria de Abreu Loureiro Pipa
Year
2019
Venue
Portuguese National Funding Agency for Science, Research and Technology (RCAAP Project by FCT)
DOI
—
Country
Portugal
Segment
Bakery and pasta
Process family
Forming, baking and cooking
Study type
Single case study
Extraction scope
Full text
Size
1 plants · 3 lines · — machines
Observation period
162 days
Data collection
manual_logs
Intervention
Show the setting as described by the study
Apenas as Butter Cookies são fabricadas em três linhas de produção: linhas 1, 3 e 6.

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 10Moderate risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described.2 / 2
Is the observation period long enough and reported?Period reported but shorter than 30 days, or only the number of shifts is given.1 / 2
How were loss data collected?Manual logs or maintenance records with unknown completeness.1 / 2
Are OEE, loading time and the loss categories defined explicitly?Formulae or definitions are given for the reported metrics, including what counts as planned time.2 / 2
Does the loss breakdown account for the total loss it claims to explain?Only the top causes are reported and the unexplained remainder can be computed.1 / 2
Is there evidence of selective reporting of favourable results?Intervention study in which baseline and post-intervention periods differ in length or method.1 / 2
Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked.1 / 2
Could conflicts of interest or the source of the data bias the result?Authors are employees of the plant or of an equipment/software vendor; no declaration.1 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
Falta de material de embalagem
Show verbatim quote (Tabela 5 - Análise de quebras)
Falta de material de embalagem 2 58 59,73 € 6
Organizational or external stops (material or personnel shortage, utilities outage)Lost time6.00 minBoth extractors agreed
Falta de material de embalagem
Show verbatim quote (Tabela 5 - Análise de quebras)
Falta de material de embalagem 2 58 59,73 € 6
Organizational or external stops (material or personnel shortage, utilities outage)Number of events2.00 eventsBoth extractors agreed
Produto não conforme
Show verbatim quote (Tabela 5 - Análise de quebras)
Produto não conforme 12 845 1 087,07 € 70
Process defects (scrap and rework)Lost time70.0 minBoth extractors agreed
Produto não conforme
Show verbatim quote (Tabela 5 - Análise de quebras)
Produto não conforme 12 845 1 087,07 € 70
Process defects (scrap and rework)Number of events12.0 eventsBoth extractors agreed
Detetor de metaisDetetor de metais
Show verbatim quote (Tabela 5 - Análise de quebras)
Detetor de metais 12 130,1 154,35 € 15
Idling and minor stops (micro-stops)Lost time15.0 minAdjudicated
Detetor de metaisDetetor de metais
Show verbatim quote (Tabela 5 - Análise de quebras)
Detetor de metais 12 130,1 154,35 € 15
Idling and minor stops (micro-stops)Number of events12.0 eventsAdjudicated
Passadeiras verdesPassadeiras verdes
Show verbatim quote (Tabela 5 - Análise de quebras)
Passadeiras verdes 1 100 80,33 € 10
Equipment failure (breakdowns)Lost time10.0 minBoth extractors agreed
Passadeiras verdesPassadeiras verdes
Show verbatim quote (Tabela 5 - Análise de quebras)
Passadeiras verdes 1 100 80,33 € 10
Equipment failure (breakdowns)Number of events1.00 eventsBoth extractors agreed
Arranque de linha
Show verbatim quote (Tabela 5 - Análise de quebras)
Arranque de linha 2 100 98,64 € 85
Start-up losses (reduced yield)Lost time85.0 minBoth extractors agreed
Arranque de linha
Show verbatim quote (Tabela 5 - Análise de quebras)
Arranque de linha 2 100 98,64 € 85
Start-up losses (reduced yield)Number of events2.00 eventsBoth extractors agreed
Desentupir canos
Show verbatim quote (Tabela 5 - Análise de quebras)
Desentupir canos 2 24 21,96 € 3
Idling and minor stops (micro-stops)Lost time3.00 minAdjudicated
Desentupir canos
Show verbatim quote (Tabela 5 - Análise de quebras)
Desentupir canos 2 24 21,96 € 3
Idling and minor stops (micro-stops)Number of events2.00 eventsAdjudicated
Arame partido
Show verbatim quote (Tabela 5 - Análise de quebras)
Arame partido 4 82 120,73 € 17
Equipment failure (breakdowns)Lost time17.0 minAdjudicated
Arame partido
Show verbatim quote (Tabela 5 - Análise de quebras)
Arame partido 4 82 120,73 € 17
Equipment failure (breakdowns)Number of events4.00 eventsAdjudicated
Fim de turno
Show verbatim quote (Tabela 5 - Análise de quebras)
Fim de turno 1 80 64,26 € 8
Planned downtime (scheduled maintenance, breaks, no demand)Lost time8.00 minBoth extractors agreed
Fim de turno
Show verbatim quote (Tabela 5 - Análise de quebras)
Fim de turno 1 80 64,26 € 8
Planned downtime (scheduled maintenance, breaks, no demand)Number of events1.00 eventsBoth extractors agreed
Máquina 2Máquina 2
Show verbatim quote (Tabela 5 - Análise de quebras)
Máquina 2 4 168 145,59 € 25
Equipment failure (breakdowns)Lost time25.0 minAdjudicated
Máquina 2Máquina 2
Show verbatim quote (Tabela 5 - Análise de quebras)
Máquina 2 4 168 145,59 € 25
Equipment failure (breakdowns)Number of events4.00 eventsAdjudicated
Máquina 1Máquina 1
Show verbatim quote (Tabela 5 - Análise de quebras)
Máquina 1 7 390 450,65 € 47
Equipment failure (breakdowns)Lost time47.0 minAdjudicated
Máquina 1Máquina 1
Show verbatim quote (Tabela 5 - Análise de quebras)
Máquina 1 7 390 450,65 € 47
Equipment failure (breakdowns)Number of events7.00 eventsAdjudicated
Erro humano
Show verbatim quote (Tabela 5 - Análise de quebras)
Erro humano 1 60 48,20 € 6
Idling and minor stops (micro-stops)Lost time6.00 minBoth extractors agreed
Erro humano
Show verbatim quote (Tabela 5 - Análise de quebras)
Erro humano 1 60 48,20 € 6
Idling and minor stops (micro-stops)Number of events1.00 eventsBoth extractors agreed
RotativaRotativa
Show verbatim quote (Tabela 5 - Análise de quebras)
Rotativa 1 110 161,95 € 10
Equipment failure (breakdowns)Lost time10.0 minBoth extractors agreed
RotativaRotativa
Show verbatim quote (Tabela 5 - Análise de quebras)
Rotativa 1 110 161,95 € 10
Equipment failure (breakdowns)Number of events1.00 eventsBoth extractors agreed
Fim turno
Show verbatim quote (Tabela 5 - Análise de quebras)
Fim turno 1 3 3,78 € 1
Planned downtime (scheduled maintenance, breaks, no demand)Lost time1.00 minBoth extractors agreed
Fim turno
Show verbatim quote (Tabela 5 - Análise de quebras)
Fim turno 1 3 3,78 € 1
Planned downtime (scheduled maintenance, breaks, no demand)Number of events1.00 eventsBoth extractors agreed
—
Show verbatim quote (Tabela 5 - Análise de quebras)
Total Geral 53 2392 2 780,86 € 326
Not classifiable from the reportNumber of events53.0 eventsSingle extractor
—
Show verbatim quote (Tabela 5 - Análise de quebras)
Total Geral 53 2392 2 780,86 € 326
Not classifiable from the reportLost time326 minSingle extractor

Observation units

  • Linha 1 · Whole line or unspecified equipment · Baseline