1Bibliographic record
- Authors
- Maria de Abreu Loureiro Pipa
- Year
- 2019
- Venue
- Portuguese National Funding Agency for Science, Research and Technology (RCAAP Project by FCT)
- DOI
- —
- Country
- Portugal
- Segment
- Bakery and pasta
- Process family
- Forming, baking and cooking
- Study type
- Single case study
- Extraction scope
- Full text
- Size
- 1 plants · 3 lines · — machines
- Observation period
- 162 days
- Data collection
- manual_logs
- Intervention
Show the setting as described by the study
Apenas as Butter Cookies são fabricadas em três linhas de produção: linhas 1, 3 e 6.
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 10Moderate risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described. | 2 / 2 |
| Is the observation period long enough and reported?Period reported but shorter than 30 days, or only the number of shifts is given. | 1 / 2 |
| How were loss data collected?Manual logs or maintenance records with unknown completeness. | 1 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?Formulae or definitions are given for the reported metrics, including what counts as planned time. | 2 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?Only the top causes are reported and the unexplained remainder can be computed. | 1 / 2 |
| Is there evidence of selective reporting of favourable results?Intervention study in which baseline and post-intervention periods differ in length or method. | 1 / 2 |
| Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked. | 1 / 2 |
| Could conflicts of interest or the source of the data bias the result?Authors are employees of the plant or of an equipment/software vendor; no declaration. | 1 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
Falta de material de embalagemShow verbatim quote (Tabela 5 - Análise de quebras)Falta de material de embalagem 2 58 59,73 € 6 | Organizational or external stops (material or personnel shortage, utilities outage) | Lost time | 6.00 min | Both extractors agreed |
Falta de material de embalagemShow verbatim quote (Tabela 5 - Análise de quebras)Falta de material de embalagem 2 58 59,73 € 6 | Organizational or external stops (material or personnel shortage, utilities outage) | Number of events | 2.00 events | Both extractors agreed |
Produto não conformeShow verbatim quote (Tabela 5 - Análise de quebras)Produto não conforme 12 845 1 087,07 € 70 | Process defects (scrap and rework) | Lost time | 70.0 min | Both extractors agreed |
Produto não conformeShow verbatim quote (Tabela 5 - Análise de quebras)Produto não conforme 12 845 1 087,07 € 70 | Process defects (scrap and rework) | Number of events | 12.0 events | Both extractors agreed |
Detetor de metaisDetetor de metaisShow verbatim quote (Tabela 5 - Análise de quebras)Detetor de metais 12 130,1 154,35 € 15 | Idling and minor stops (micro-stops) | Lost time | 15.0 min | Adjudicated |
Detetor de metaisDetetor de metaisShow verbatim quote (Tabela 5 - Análise de quebras)Detetor de metais 12 130,1 154,35 € 15 | Idling and minor stops (micro-stops) | Number of events | 12.0 events | Adjudicated |
Passadeiras verdesPassadeiras verdesShow verbatim quote (Tabela 5 - Análise de quebras)Passadeiras verdes 1 100 80,33 € 10 | Equipment failure (breakdowns) | Lost time | 10.0 min | Both extractors agreed |
Passadeiras verdesPassadeiras verdesShow verbatim quote (Tabela 5 - Análise de quebras)Passadeiras verdes 1 100 80,33 € 10 | Equipment failure (breakdowns) | Number of events | 1.00 events | Both extractors agreed |
Arranque de linhaShow verbatim quote (Tabela 5 - Análise de quebras)Arranque de linha 2 100 98,64 € 85 | Start-up losses (reduced yield) | Lost time | 85.0 min | Both extractors agreed |
Arranque de linhaShow verbatim quote (Tabela 5 - Análise de quebras)Arranque de linha 2 100 98,64 € 85 | Start-up losses (reduced yield) | Number of events | 2.00 events | Both extractors agreed |
Desentupir canosShow verbatim quote (Tabela 5 - Análise de quebras)Desentupir canos 2 24 21,96 € 3 | Idling and minor stops (micro-stops) | Lost time | 3.00 min | Adjudicated |
Desentupir canosShow verbatim quote (Tabela 5 - Análise de quebras)Desentupir canos 2 24 21,96 € 3 | Idling and minor stops (micro-stops) | Number of events | 2.00 events | Adjudicated |
Arame partidoShow verbatim quote (Tabela 5 - Análise de quebras)Arame partido 4 82 120,73 € 17 | Equipment failure (breakdowns) | Lost time | 17.0 min | Adjudicated |
Arame partidoShow verbatim quote (Tabela 5 - Análise de quebras)Arame partido 4 82 120,73 € 17 | Equipment failure (breakdowns) | Number of events | 4.00 events | Adjudicated |
Fim de turnoShow verbatim quote (Tabela 5 - Análise de quebras)Fim de turno 1 80 64,26 € 8 | Planned downtime (scheduled maintenance, breaks, no demand) | Lost time | 8.00 min | Both extractors agreed |
Fim de turnoShow verbatim quote (Tabela 5 - Análise de quebras)Fim de turno 1 80 64,26 € 8 | Planned downtime (scheduled maintenance, breaks, no demand) | Number of events | 1.00 events | Both extractors agreed |
Máquina 2Máquina 2Show verbatim quote (Tabela 5 - Análise de quebras)Máquina 2 4 168 145,59 € 25 | Equipment failure (breakdowns) | Lost time | 25.0 min | Adjudicated |
Máquina 2Máquina 2Show verbatim quote (Tabela 5 - Análise de quebras)Máquina 2 4 168 145,59 € 25 | Equipment failure (breakdowns) | Number of events | 4.00 events | Adjudicated |
Máquina 1Máquina 1Show verbatim quote (Tabela 5 - Análise de quebras)Máquina 1 7 390 450,65 € 47 | Equipment failure (breakdowns) | Lost time | 47.0 min | Adjudicated |
Máquina 1Máquina 1Show verbatim quote (Tabela 5 - Análise de quebras)Máquina 1 7 390 450,65 € 47 | Equipment failure (breakdowns) | Number of events | 7.00 events | Adjudicated |
Erro humanoShow verbatim quote (Tabela 5 - Análise de quebras)Erro humano 1 60 48,20 € 6 | Idling and minor stops (micro-stops) | Lost time | 6.00 min | Both extractors agreed |
Erro humanoShow verbatim quote (Tabela 5 - Análise de quebras)Erro humano 1 60 48,20 € 6 | Idling and minor stops (micro-stops) | Number of events | 1.00 events | Both extractors agreed |
RotativaRotativaShow verbatim quote (Tabela 5 - Análise de quebras)Rotativa 1 110 161,95 € 10 | Equipment failure (breakdowns) | Lost time | 10.0 min | Both extractors agreed |
RotativaRotativaShow verbatim quote (Tabela 5 - Análise de quebras)Rotativa 1 110 161,95 € 10 | Equipment failure (breakdowns) | Number of events | 1.00 events | Both extractors agreed |
Fim turnoShow verbatim quote (Tabela 5 - Análise de quebras)Fim turno 1 3 3,78 € 1 | Planned downtime (scheduled maintenance, breaks, no demand) | Lost time | 1.00 min | Both extractors agreed |
Fim turnoShow verbatim quote (Tabela 5 - Análise de quebras)Fim turno 1 3 3,78 € 1 | Planned downtime (scheduled maintenance, breaks, no demand) | Number of events | 1.00 events | Both extractors agreed |
—Show verbatim quote (Tabela 5 - Análise de quebras)Total Geral 53 2392 2 780,86 € 326 | Not classifiable from the report | Number of events | 53.0 events | Single extractor |
—Show verbatim quote (Tabela 5 - Análise de quebras)Total Geral 53 2392 2 780,86 € 326 | Not classifiable from the report | Lost time | 326 min | Single extractor |
Observation units
- Linha 1 · Whole line or unspecified equipment · Baseline