It appears in about 1 of every 100 lines studied.

When it appears, it takes on average about 56 % of the line's lost time. Reported by 1 of the 43 studies that could observe it (sparse evidence).

What happens

Mechanical components of the milling unit such as bearings, gearboxes, drive trains and the civil/structural supports that carry the mill degrade through wear, fatigue or misalignment until they can no longer sustain normal operation, forcing an unplanned stop. The failure propagates from a localized component defect to a full equipment outage once the degraded part can no longer transmit load or torque safely.

What is done about it

Implement condition-based and preventive maintenance on critical mechanical assets, including vibration analysis and oil monitoring on gearboxes and bearings, scheduled inspection of structural and civil supports, and timely replacement of wear parts before they reach failure. Maintain spare-part availability and standardized repair procedures to reduce repair time when a breakdown does occur.

Practical guidance written from engineering knowledge; it is not a statistical estimate.

1Probability and evidence

Pooled over all segments. A wide interval is a result: it states how much the evidence allows us to know.
Probability of presence
0.9% [0.2–2.7%]
Expected share of lost time
0.5% [0.1–1.5%]
Share of lost time when present
56% [45–66%]
Studies / units
43 / 48
Evidence grade
D

Grade D: 0 or 1 study; the estimate is driven by partial pooling and priors, and the wide interval is the result.

2Probability by segment

Partially pooled estimates for each industry segment.
  • Dairy products
    1.1% [0.1–4.2%]5 studies
  • Soft drinks, bottled water and juices
    1.1% [0.1–4.1%]1 study
  • Brewing, wine and spirits
    1.2% [0.1–4.6%]0 studies
  • Bakery and pasta
    1.1% [0.1–4.2%]0 studies
  • Meat, poultry and seafood
    1.2% [0.1–4.6%]0 studies
  • Fruit and vegetable processing
    1.1% [0.1–4.7%]2 studies
  • Grain and oilseed milling
    1.6% [0.2–6.1%]7 studies
  • Sugar and confectionery
    1.0% [0.1–3.9%]10 studies
  • Snacks, coffee, tea and other foods
    1.0% [0.1–4.0%]5 studies
  • Animal feed and pet food
    1.1% [0.1–4.0%]6 studies
  • Food manufacturing (unspecified or mixed)
    1.1% [0.1–3.9%]7 studies

3Mechanism, SCADA signature and countermeasure

Engineering guidance that helps recognise and address the cause; it is not part of the statistical estimate.

Mechanism

Engineering guidance

Mechanical components of the milling unit such as bearings, gearboxes, drive trains and the civil/structural supports that carry the mill degrade through wear, fatigue or misalignment until they can no longer sustain normal operation, forcing an unplanned stop. The failure propagates from a localized component defect to a full equipment outage once the degraded part can no longer transmit load or torque safely.

How it looks in SCADA data

Engineering guidance

The mill asset transitions abruptly from running to a fault or stopped state outside the planned schedule, often with a maintenance work order or breakdown code logged against the specific asset tag (gearbox, structural unit). Downtime duration tends to be long relative to minor stops, and recurring stop events may cluster on the same equipment tag over time, with upstream feed accumulation or downstream starvation visible on neighboring stations.

Countermeasure

Engineering guidance

Implement condition-based and preventive maintenance on critical mechanical assets, including vibration analysis and oil monitoring on gearboxes and bearings, scheduled inspection of structural and civil supports, and timely replacement of wear parts before they reach failure. Maintain spare-part availability and standardized repair procedures to reduce repair time when a breakdown does occur.

4Sources

Every extracted datum with its study, value and verbatim quote.
  1. Number of events: 2.00 events · as reported: “Civil Maintenance”
    Show verbatim quote
    Civil Maintenance 2 7.534 (5.100; 9.969)
  2. Share of planned time: 1.46 % · as reported: “Breakdown Maintenance”
    Show verbatim quote
    Sedangkan jika kita lihat data breakdown maintenance (BM) selama 960 menit atau 1,46%, maka dapat dikatakan mesin RMU 2 masih relatif prima dan jarang mengalami kerusakan yang berarti.
  3. Lost time: 960 min · as reported: “Breakdown Maintenance”
    Show verbatim quote
    Selama rentang waktu tersebut waktu operasional adalah 65.880 menit, preventive maintenance 1.905 menit, setup 1.890 menit dan breakdown 960 menit , maka persen availabilitynya adalah
  4. Lost time: 2.25 Hr · as reported: “V4: MGB2 Gearbox Maintenance”
    Show verbatim quote
    08/20/16 008880 V4: MGB2 Gearbox Maintenance PM 0 2.25 2.25