1Bibliographic record

Authors
Jivan Rao, Shamsul Sarip, Mohd Nabil Muhtazaruddin, Siti Armiza Mohd Aris, Mohamed Azlan Suhot, Mohamad Zaki Hassan, Roslina Mohammad, Mohd Yusof Md Daud, Sa’ardin Abdul Aziz, Nurul Aini Bani, Hazilah Mad Kaidi, Rasheed Mohamed Kutty, Nor Fazilah Mohd Hashim
Year
2019
Venue
International Journal of Engineering & Technology
Country
Malaysia
Segment
Snacks, coffee, tea and other foods
Process family
Milling, extraction and separation
Study type
Multiple case study
Extraction scope
Full text
Size
1 plants · — lines · 2 machines
Observation period
427 days
Data collection
maintenance_records
Intervention
Show the setting as described by the study
This study focuses on vertical roller mills used to grind the 'chili' flakes into fine powder, and its productivity for different drive systems, namely belt drive and gearbox drive.

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 14Low risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described.2 / 2
Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events).2 / 2
How were loss data collected?Automatic line monitoring, or systematic logs covering every stop in the period.2 / 2
Are OEE, loading time and the loss categories defined explicitly?A standard definition is cited but its application is not shown.1 / 2
Does the loss breakdown account for the total loss it claims to explain?Only the top causes are reported and the unexplained remainder can be computed.1 / 2
Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method.2 / 2
Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points.2 / 2
Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result.2 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
—
Show verbatim quote (Table 4)
Energy consumption/kg 2.014kWh/kg 3.295kWh/kg
noneSpecific energy2.01 kWh/kgBoth extractors agreed
Roller arm locker plate bolt/scrapper failureroller arm locker plate bolt / scrapper
Show verbatim quote (Table 3)
Roller arm locker plate bolt/scrapper failure 2807.21 0.79 699.70 2.30
Equipment failure (breakdowns)Time between events2,807 HrBoth extractors agreed
Roller arm failures/Liner replacementroller arm/liner
Show verbatim quote (Table 3)
Roller arm failures/Liner replacement 2805.00 3.00 2794.5 13.5
Equipment failure (breakdowns)Mean event duration3.00 HrBoth extractors agreed
—
Show verbatim quote (Table 4)
Throughput 7.18 kg/hour 4.14 kg/hour
noneThroughput7.18 kg/hBoth extractors agreed
Drive related failuresbelt drive / transmission shaft
Show verbatim quote (Table 3)
Drive related failures 1685.17 6.83 - -
Equipment failure (breakdowns)Time between events1,685 HrBoth extractors agreed
Mill centre shaft failure/Servicecentre shaft
Show verbatim quote (Table 3)
Mill centre shaft failure/Service - - 2734.38 73.63
Equipment failure (breakdowns)Time between events2,734 HrBoth extractors agreed
Variable frequency drive failureVFD/inverter
Show verbatim quote (Table 3)
Variable frequency drive failure - - 2806.00 2.00
Equipment failure (breakdowns)Time between events2,806 HrBoth extractors agreed
V1: Transmission shaft (TS1) bottom pulley end brokentransmission shaft pulley
Show verbatim quote (Table 1)
01/16/17 017640 V1: Transmission shaft (TS1) bottom pulley end broken CMU 16 2 18
Equipment failure (breakdowns)Lost time18.0 HrBoth extractors agreed
V4: Roller arm locker plate bolt brokenroller arm locker plate bolt
Show verbatim quote (Table 2)
12/08/15 014601 V4: Roller arm locker plate bolt broken CMU 0 1 1
Equipment failure (breakdowns)Lost time1.00 HrBoth extractors agreed
V1: Roller arm jammed/Roller arm changeroller arm
Show verbatim quote (Table 1)
08/30/16 016657 V1: Roller arm jammed/Roller arm change CMU 0 3 3
Equipment failure (breakdowns)Lost time3.00 HrBoth extractors agreed
V1: Roller arm (R63) locker plate bolt brokenroller arm locker plate bolt
Show verbatim quote (Table 1)
03/08/16 015266 V1: Roller arm (R63) locker plate bolt broken CMU 0 0.58 0.58
Equipment failure (breakdowns)Lost time0.580 HrBoth extractors agreed
V1: Roller arm/Liner replacementroller arm/liner
Show verbatim quote (Table 1)
01/06/16 014500 V1: Roller arm/Liner replacement CMP 0 3 3
Equipment failure (breakdowns)Lost time3.00 HrBoth extractors agreed
V1: Center shaft - transmission shaft belt changetransmission shaft belt
Show verbatim quote (Table 1)
12/19/16 017414 V1: Center shaft - transmission shaft belt change CMP 0 1.25 1.25
Equipment failure (breakdowns)Lost time1.25 HrBoth extractors agreed
V1: Center shaft pulley belts turned overcenter shaft pulley belt
Show verbatim quote (Table 1)
12/29/16 017518 V1: Center shaft pulley belts turned over CMU 0 1.5 1.5
Equipment failure (breakdowns)Lost time1.50 HrBoth extractors agreed
V4: Center shaft service (Sleeve worn out)centre shaft sleeve
Show verbatim quote (Table 2)
12/24/15 014674 V4: Center shaft service (Sleeve worn out) CMU 112 13.25 125.25
Equipment failure (breakdowns)Lost time125 HrBoth extractors agreed
V1: Belt drive cover damagedbelt drive cover
Show verbatim quote (Table 1)
02/22/16 015173 V1: Belt drive cover damaged CMP 0.75 0.5 1.25
Equipment failure (breakdowns)Lost time1.25 HrBoth extractors agreed
V4: Roller arm locker plate bolt broken/Roller arm (R21) changeroller arm (R21)
Show verbatim quote (Table 2)
12/04/15 014523 V4: Roller arm locker plate bolt broken/Roller arm (R21) change CMU 4 4 8
Equipment failure (breakdowns)Lost time8.00 HrBoth extractors agreed
—
Show verbatim quote (Table 4)
Availability 96.81% 99.47%
noneAvailability96.8 %Both extractors agreed
—
Show verbatim quote (Table 4)
Availability 96.81% 99.47%
noneAvailability99.5 %Both extractors agreed
V1: Mill jammed/1 unit scrapper brokenscrapper
Show verbatim quote (Table 1)
12/28/16 017504 V1: Mill jammed/ 1 unit scrapper broken CMU 0 1 1
Equipment failure (breakdowns)Lost time1.00 HrBoth extractors agreed
Mill centre shaft failure/Servicecentre shaft
Show verbatim quote (Table 3)
Mill centre shaft failure/Service - - 2734.38 73.63
Equipment failure (breakdowns)Mean event duration73.6 HrBoth extractors agreed
Overall/Mixed failure modes
Show verbatim quote (Table 3)
Overall/Mixed failure modes 698.30 3.70 362.49 11.91
Equipment failure (breakdowns)Time between events698 HrBoth extractors agreed
Roller arm failures/Liner replacementroller arm/liner
Show verbatim quote (Table 3)
Roller arm failures/Liner replacement 2805.00 3.00 2794.5 13.5
Equipment failure (breakdowns)Time between events2,795 HrBoth extractors agreed
Overall/Mixed failure modes
Show verbatim quote (Table 3)
Overall/Mixed failure modes 698.30 3.70 362.49 11.91
Equipment failure (breakdowns)Time between events362 HrBoth extractors agreed
Overall/Mixed failure modes
Show verbatim quote (Table 3)
Overall/Mixed failure modes 698.30 3.70 362.49 11.91
Equipment failure (breakdowns)Mean event duration11.9 HrBoth extractors agreed
Overall/Mixed failure modes
Show verbatim quote (Table 3)
Overall/Mixed failure modes 698.30 3.70 362.49 11.91
Equipment failure (breakdowns)Mean event duration3.70 HrBoth extractors agreed
Variable frequency drive failureVFD/inverter
Show verbatim quote (Table 3)
Variable frequency drive failure - - 2806.00 2.00
Equipment failure (breakdowns)Mean event duration2.00 HrBoth extractors agreed
Roller arm locker plate bolt/scrapper failureroller arm locker plate bolt / scrapper
Show verbatim quote (Table 3)
Roller arm locker plate bolt/scrapper failure 2807.21 0.79 699.70 2.30
Equipment failure (breakdowns)Mean event duration0.790 HrBoth extractors agreed
Roller arm failures/Liner replacementroller arm/liner
Show verbatim quote (Table 3)
Roller arm failures/Liner replacement 2805.00 3.00 2794.5 13.5
Equipment failure (breakdowns)Mean event duration13.5 HrBoth extractors agreed
Roller arm failures/Liner replacementroller arm/liner
Show verbatim quote (Table 3)
Roller arm failures/Liner replacement 2805.00 3.00 2794.5 13.5
Equipment failure (breakdowns)Time between events2,805 HrSingle extractor
Drive related failuresbelt drive / transmission shaft
Show verbatim quote (Table 3)
Drive related failures 1685.17 6.83 - -
Equipment failure (breakdowns)Mean event duration6.83 HrSingle extractor
—
Show verbatim quote (Table 4)
Energy consumption/kg 2.014kWh/kg 3.295kWh/kg
noneSpecific energy3.30 kWh/kgSingle extractor
—
Show verbatim quote (Table 4)
Throughput 7.18 kg/hour 4.14 kg/hour
noneThroughput4.14 kg/hSingle extractor
roller arm failureroller arm
Show verbatim quote (Results and discussion)
V1 had recorded one roller arm failure between 01/12/15 and 31/01/17, and had its grinding liner replaced 2 times in that period.
Equipment failure (breakdowns)Number of events1.00 eventsSingle extractor
grinding liner replacementliner
Show verbatim quote (Results and discussion)
V1 had recorded one roller arm failure between 01/12/15 and 31/01/17, and had its grinding liner replaced 2 times in that period.
Setup and adjustmentsNumber of events2.00 eventsSingle extractor
roller/scrapper failurescrapper / roller arm locker plate
Show verbatim quote (Results and discussion)
V1 had only recorded 2 failures from operating 351 days.
Equipment failure (breakdowns)Number of events2.00 eventsSingle extractor
roller/scrapper failurescrapper / roller arm locker plate
Show verbatim quote (Results and discussion)
These intermittent stoppages caused by such failure had accumulated 1.58, and 18.41 hour of stoppage time for V1 and V4 respectively.
Equipment failure (breakdowns)Lost time1.58 HrSingle extractor
belt failure, transmission shaft failure, minor belt cover damagebelt drive / transmission shaft
Show verbatim quote (Results and discussion)
The belt driven V1 has experienced belt failure, transmission shaft failure, and minor belt cover damage, resulting in a total stoppage of 20.5 hours.
Equipment failure (breakdowns)Lost time20.5 hoursSingle extractor
—
Show verbatim quote (Table 1)
Total from 12/01/16 till 01/31/17 16.75 12.83 29.58
Not classifiable from the reportLost time29.6 HrSingle extractor
Roller arm locker plate bolt/scrapper failureroller arm locker plate bolt / scrapper
Show verbatim quote (Table 3)
Roller arm locker plate bolt/scrapper failure 2807.21 0.79 699.70 2.30
Equipment failure (breakdowns)Time between events700 HrSingle extractor
Roller arm locker plate bolt/scrapper failureroller arm locker plate bolt / scrapper
Show verbatim quote (Table 3)
Roller arm locker plate bolt/scrapper failure 2807.21 0.79 699.70 2.30
Equipment failure (breakdowns)Mean event duration2.30 HrSingle extractor
grinding liner replacementliner
Show verbatim quote (Results and discussion)
V4 had recorded two roller arm associated failures and, had its liner replaced 3 times in 61 weeks.
Setup and adjustmentsNumber of events3.00 eventsSingle extractor
roller/scrapper failurescrapper / roller arm locker plate
Show verbatim quote (Results and discussion)
During the same period, V4 had encountered the same failure 5 times extra, totalling a 7 failure.
Equipment failure (breakdowns)Number of events7.00 eventsSingle extractor
roller/scrapper failurescrapper / roller arm locker plate
Show verbatim quote (Results and discussion)
These intermittent stoppages caused by such failure had accumulated 1.58, and 18.41 hour of stoppage time for V1 and V4 respectively.
Equipment failure (breakdowns)Lost time18.4 HrSingle extractor
locker plate bolt damageroller arm locker plate bolt
Show verbatim quote (Results and discussion)
43.75% of failure in V4 mill is caused by locker plate bolt damage, the higher rate of such failure is due to the type of drive employed in V4 mill.
Equipment failure (breakdowns)Share of loss events43.8 %Single extractor
V4: R49 Locker plate bolt brokenroller arm (R49) locker plate bolt
Show verbatim quote (Table 2)
02/19/16 015158 V4: R49 Locker plate bolt broken CMU 0 0.33 0.33
Equipment failure (breakdowns)Lost time0.330 HrSingle extractor
V4: Roller arm (R49) locker plate bolt brokenroller arm (R49)
Show verbatim quote (Table 2)
03/09/16 015231 V4: Roller arm (R49) locker plate bolt broken CMU 0 0.5 0.5
Equipment failure (breakdowns)Lost time0.500 HrSingle extractor
V4: Roller arm (R49) locker plate bolt brokenroller arm (R49)
Show verbatim quote (Table 2)
03/29/16 015448 V4: Roller arm (R49) locker plate bolt broken CMU 0 1 1
Equipment failure (breakdowns)Lost time1.00 HrSingle extractor
V4: R49 locker plate holding bolts loosenroller arm (R49) locker plate bolt
Show verbatim quote (Table 2)
04/06/16 015496 V4: R49 locker plate holding bolts loosen CMU 0 0.33 0.33
Equipment failure (breakdowns)Lost time0.330 HrSingle extractor
V4: Roller arm and liner changeroller arm/liner
Show verbatim quote (Table 2)
05/07/16 015728 V4: Roller arm and liner change CMP 0 5 5
Equipment failure (breakdowns)Lost time5.00 HrSingle extractor
V4: Inverter 75kW (S/N 000001) error OC1inverter/VFD
Show verbatim quote (Table 2)
06/25/16 016132 V4: Inverter 75kW (S/N 000001) error OC1 CMU 0 3 3
Equipment failure (breakdowns)Lost time3.00 HrSingle extractor
V4: Roller arm locker plate bolt broken/stopper brokenroller arm locker plate bolt / stopper
Show verbatim quote (Table 2)
07/01/16 016185 V4: Roller arm locker plate bolt broken/stopper broken CMU 0 5 5
Equipment failure (breakdowns)Lost time5.00 HrSingle extractor
V4: MGB2 Gearbox Maintenancegearbox
Show verbatim quote (Table 2)
08/20/16 008880 V4: MGB2 Gearbox Maintenance PM 0 2.25 2.25
Planned downtime (scheduled maintenance, breaks, no demand)Lost time2.25 HrSingle extractor
V4: Mill motor (M211) short circuitmill motor
Show verbatim quote (Table 2)
08/24/16 016602 V4: Mill motor (M211) short circuit CMU 0 5 5
Equipment failure (breakdowns)Lost time5.00 HrSingle extractor
V4: Mill inverter fan blower probleminverter fan blower
Show verbatim quote (Table 2)
08/29/16 016602-01 V4: Mill inverter fan blower problem CMU 0 1 1
Equipment failure (breakdowns)Lost time1.00 HrSingle extractor
V4: M109 high amps/Changemotor M109
Show verbatim quote (Table 2)
09/17/16 016791 V4: M109 high amps/Change CMP 0 3 3
Equipment failure (breakdowns)Lost time3.00 HrSingle extractor
V4: Center shaft service/Roller arm & liner changecentre shaft / roller arm / liner
Show verbatim quote (Table 2)
10/13/16 016972 V4: Center shaft service/Roller arm & liner change CMU 16 6 22
Equipment failure (breakdowns)Lost time22.0 HrSingle extractor
V4: Inverter (DR-14) serviceinverter DR-14
Show verbatim quote (Table 2)
10/14/16 016694 V4: Inverter (DR-14) service PM 0 1 1
Planned downtime (scheduled maintenance, breaks, no demand)Lost time1.00 HrSingle extractor
V4: Roller came loose from arm/Abnormal noiseroller / roller arm
Show verbatim quote (Table 2)
01/04/17 017546 V4: Roller came loose from arm/Abnormal noise CMU 0 2.25 2.25
Equipment failure (breakdowns)Lost time2.25 HrSingle extractor
—
Show verbatim quote (Table 2)
Total from 12/01/15 till 01/31/17 128 53.91 181.91
Not classifiable from the reportLost time182 HrSingle extractor
—
Show verbatim quote (Table 4, V4 row)
Energy consumption/day | 231.36 kWh/day
noneSpecific energy231 kWh/daySingle extractor

Observation units

  • V4 (gearbox-driven vertical roller mill) · Milling and grinding · Baseline
  • V1 (belt-driven vertical roller mill) · Milling and grinding · Baseline
  • V4 · Milling and grinding · Baseline