Strategic formulation of industrial maintenance based on equipment reliability in a sugar and ethanol production plant

Open source

1Bibliographic record

Authors
Elias Tadeu da Silva, Jorge Alberto Achcar, Claudio Luís Piratelli
Year
2020
Venue
Independent Journal of Management & Production
Country
Brazil
Segment
Sugar and confectionery
Process family
Whole plant or unspecified
Study type
Reliability analysis
Extraction scope
Full text
Size
1 plants · — lines · — machines
Observation period
1,993 days
Data collection
maintenance_records
Intervention
Show the setting as described by the study
Its industrial park has a daily sugarcane crushing capacity of 7,300 tons, producing 20,000 bags of sugar and generating 4.4 MW of electricity.

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 11Moderate risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product or sector is given but the equipment or process is only partly described.1 / 2
Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events).2 / 2
How were loss data collected?Manual logs or maintenance records with unknown completeness.1 / 2
Are OEE, loading time and the loss categories defined explicitly?No definition; metrics are reported as bare numbers.0 / 2
Does the loss breakdown account for the total loss it claims to explain?Only the top causes are reported and the unexplained remainder can be computed.1 / 2
Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method.2 / 2
Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points.2 / 2
Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result.2 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
Electrical Maintenance
Show verbatim quote (Table 1)
Electrical Maintenance 218 5.564 (5.330; 5.797)
Equipment failure (breakdowns)Time between events5.56 log(min)Both extractors agreed
Operating - Preparation / Grinding
Show verbatim quote (Table 1)
Operating - Preparation / Grinding 276 6.477 (6.269; 6.684)
Equipment failure (breakdowns)Time between events6.48 log(min)Adjudicated
Operating - Steam Generation
Show verbatim quote (Table 1)
Operating - Steam Generation 135 4.924 (4.628; 5.220)
Equipment failure (breakdowns)Time between events4.92 log(min)Adjudicated
Operating - Power Generation
Show verbatim quote (Table 1)
Operating - Power Generation 5 6.429 (4.890; 7.969)
Equipment failure (breakdowns)Time between events6.43 log(min)Adjudicated
Operating - Sugar Factory
Show verbatim quote (Table 1)
Operating - Sugar Factory 258 6.2799 (6.0656; 6.4942)
Equipment failure (breakdowns)Time between events6.28 log(min)Adjudicated
Mechanical Maintenance
Show verbatim quote (Table 1)
Mechanical Maintenance 290 6.0876 (5.8855; 6.2898)
Equipment failure (breakdowns)Time between events6.09 log(min)Both extractors agreed
Maintenance Instrumentation
Show verbatim quote (Table 1)
Maintenance Instrumentation 15 6.178 (5.289; 7.067)
Equipment failure (breakdowns)Time between events6.18 log(min)Both extractors agreed
Civil Maintenance
Show verbatim quote (Table 1)
Civil Maintenance 2 7.534 (5.100; 9.969)
Equipment failure (breakdowns)Time between events7.53 log(min)Both extractors agreed
Maintenance Industrial Automation
Show verbatim quote (Table 1)
Maintenance Industrial Automation 9 6.242 (5.095; 7.390)
Equipment failure (breakdowns)Time between events6.24 log(min)Both extractors agreed
Excess Capacity Milling
Show verbatim quote (Table 1)
Excess Capacity Milling 1 5.704 (2.261; 9.146)
Not classifiable from the reportTime between events5.70 log(min)Adjudicated
—
Show verbatim quote (Figure 1)
Mean 1482 StDev 3292 N 1209
Not classifiable from the reportTime between events1,482 minAdjudicated
Excess Capacity Milling
Show verbatim quote (Table 1)
Excess Capacity Milling 1 5.704 (2.261; 9.146)
Not classifiable from the reportNumber of events1.00 eventsSingle extractor
Maintenance Industrial Automation
Show verbatim quote (Table 1)
Maintenance Industrial Automation 9 6.242 (5.095; 7.390)
Equipment failure (breakdowns)Number of events9.00 eventsSingle extractor
Civil Maintenance
Show verbatim quote (Table 1)
Civil Maintenance 2 7.534 (5.100; 9.969)
Equipment failure (breakdowns)Number of events2.00 eventsSingle extractor
Maintenance Instrumentation
Show verbatim quote (Table 1)
Maintenance Instrumentation 15 6.178 (5.289; 7.067)
Equipment failure (breakdowns)Number of events15.0 eventsSingle extractor
Mechanical Maintenance
Show verbatim quote (Table 1)
Mechanical Maintenance 290 6.0876 (5.8855; 6.2898)
Equipment failure (breakdowns)Number of events290 eventsSingle extractor
Operating - Sugar Factory
Show verbatim quote (Table 1)
Operating - Sugar Factory 258 6.2799 (6.0656; 6.4942)
Idling and minor stops (micro-stops)Number of events258 eventsSingle extractor
Operating - Power Generation
Show verbatim quote (Table 1)
Operating - Power Generation 5 6.429 (4.890; 7.969)
Idling and minor stops (micro-stops)Number of events5.00 eventsSingle extractor
Operating - Steam Generation
Show verbatim quote (Table 1)
Operating - Steam Generation 135 4.924 (4.628; 5.220)
Idling and minor stops (micro-stops)Number of events135 eventsSingle extractor
Operating - Preparation / Grinding
Show verbatim quote (Table 1)
Operating - Preparation / Grinding 276 6.477 (6.269; 6.684)
Idling and minor stops (micro-stops)Number of events276 eventsSingle extractor
Electrical Maintenance
Show verbatim quote (Table 1)
Electrical Maintenance 218 5.564 (5.330; 5.797)
Equipment failure (breakdowns)Number of events218 eventsSingle extractor

Observation units

  • Sugar, ethanol and electricity plant (sugar cane department) · Whole line or unspecified equipment · Baseline
  • Milling process · Milling and grinding · Baseline