Strategic formulation of industrial maintenance based on equipment reliability in a sugar and ethanol production plant
1Bibliographic record
- Authors
- Elias Tadeu da Silva, Jorge Alberto Achcar, Claudio Luís Piratelli
- Year
- 2020
- Venue
- Independent Journal of Management & Production
- Country
- Brazil
- Segment
- Sugar and confectionery
- Process family
- Whole plant or unspecified
- Study type
- Reliability analysis
- Extraction scope
- Full text
- Size
- 1 plants · — lines · — machines
- Observation period
- 1,993 days
- Data collection
- maintenance_records
- Intervention
Show the setting as described by the study
Its industrial park has a daily sugarcane crushing capacity of 7,300 tons, producing 20,000 bags of sugar and generating 4.4 MW of electricity.
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 11Moderate risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product or sector is given but the equipment or process is only partly described. | 1 / 2 |
| Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events). | 2 / 2 |
| How were loss data collected?Manual logs or maintenance records with unknown completeness. | 1 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?No definition; metrics are reported as bare numbers. | 0 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?Only the top causes are reported and the unexplained remainder can be computed. | 1 / 2 |
| Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method. | 2 / 2 |
| Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points. | 2 / 2 |
| Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result. | 2 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
Electrical MaintenanceShow verbatim quote (Table 1)Electrical Maintenance 218 5.564 (5.330; 5.797) | Equipment failure (breakdowns) | Time between events | 5.56 log(min) | Both extractors agreed |
Operating - Preparation / GrindingShow verbatim quote (Table 1)Operating - Preparation / Grinding 276 6.477 (6.269; 6.684) | Equipment failure (breakdowns) | Time between events | 6.48 log(min) | Adjudicated |
Operating - Steam GenerationShow verbatim quote (Table 1)Operating - Steam Generation 135 4.924 (4.628; 5.220) | Equipment failure (breakdowns) | Time between events | 4.92 log(min) | Adjudicated |
Operating - Power GenerationShow verbatim quote (Table 1)Operating - Power Generation 5 6.429 (4.890; 7.969) | Equipment failure (breakdowns) | Time between events | 6.43 log(min) | Adjudicated |
Operating - Sugar FactoryShow verbatim quote (Table 1)Operating - Sugar Factory 258 6.2799 (6.0656; 6.4942) | Equipment failure (breakdowns) | Time between events | 6.28 log(min) | Adjudicated |
Mechanical MaintenanceShow verbatim quote (Table 1)Mechanical Maintenance 290 6.0876 (5.8855; 6.2898) | Equipment failure (breakdowns) | Time between events | 6.09 log(min) | Both extractors agreed |
Maintenance InstrumentationShow verbatim quote (Table 1)Maintenance Instrumentation 15 6.178 (5.289; 7.067) | Equipment failure (breakdowns) | Time between events | 6.18 log(min) | Both extractors agreed |
Civil MaintenanceShow verbatim quote (Table 1)Civil Maintenance 2 7.534 (5.100; 9.969) | Equipment failure (breakdowns) | Time between events | 7.53 log(min) | Both extractors agreed |
Maintenance Industrial AutomationShow verbatim quote (Table 1)Maintenance Industrial Automation 9 6.242 (5.095; 7.390) | Equipment failure (breakdowns) | Time between events | 6.24 log(min) | Both extractors agreed |
Excess Capacity MillingShow verbatim quote (Table 1)Excess Capacity Milling 1 5.704 (2.261; 9.146) | Not classifiable from the report | Time between events | 5.70 log(min) | Adjudicated |
—Show verbatim quote (Figure 1)Mean 1482 StDev 3292 N 1209 | Not classifiable from the report | Time between events | 1,482 min | Adjudicated |
Excess Capacity MillingShow verbatim quote (Table 1)Excess Capacity Milling 1 5.704 (2.261; 9.146) | Not classifiable from the report | Number of events | 1.00 events | Single extractor |
Maintenance Industrial AutomationShow verbatim quote (Table 1)Maintenance Industrial Automation 9 6.242 (5.095; 7.390) | Equipment failure (breakdowns) | Number of events | 9.00 events | Single extractor |
Civil MaintenanceShow verbatim quote (Table 1)Civil Maintenance 2 7.534 (5.100; 9.969) | Equipment failure (breakdowns) | Number of events | 2.00 events | Single extractor |
Maintenance InstrumentationShow verbatim quote (Table 1)Maintenance Instrumentation 15 6.178 (5.289; 7.067) | Equipment failure (breakdowns) | Number of events | 15.0 events | Single extractor |
Mechanical MaintenanceShow verbatim quote (Table 1)Mechanical Maintenance 290 6.0876 (5.8855; 6.2898) | Equipment failure (breakdowns) | Number of events | 290 events | Single extractor |
Operating - Sugar FactoryShow verbatim quote (Table 1)Operating - Sugar Factory 258 6.2799 (6.0656; 6.4942) | Idling and minor stops (micro-stops) | Number of events | 258 events | Single extractor |
Operating - Power GenerationShow verbatim quote (Table 1)Operating - Power Generation 5 6.429 (4.890; 7.969) | Idling and minor stops (micro-stops) | Number of events | 5.00 events | Single extractor |
Operating - Steam GenerationShow verbatim quote (Table 1)Operating - Steam Generation 135 4.924 (4.628; 5.220) | Idling and minor stops (micro-stops) | Number of events | 135 events | Single extractor |
Operating - Preparation / GrindingShow verbatim quote (Table 1)Operating - Preparation / Grinding 276 6.477 (6.269; 6.684) | Idling and minor stops (micro-stops) | Number of events | 276 events | Single extractor |
Electrical MaintenanceShow verbatim quote (Table 1)Electrical Maintenance 218 5.564 (5.330; 5.797) | Equipment failure (breakdowns) | Number of events | 218 events | Single extractor |
Observation units
- Sugar, ethanol and electricity plant (sugar cane department) · Whole line or unspecified equipment · Baseline
- Milling process · Milling and grinding · Baseline