Miscellaneous non-specific line stoppage
In short
It appears in about 1 of every 100 lines studied.
When it appears, it takes on average about 54 % of the line's lost time. Reported by 4 of the 127 studies that could observe it (limited evidence).
What happens
This bucket groups heterogeneous line stops that primary studies logged under generic or administrative labels rather than a defined technical failure mode, including development or trial runs, operator travel or walking time between stations, utility supply interruptions, generic equipment remarks, outright breakdowns, and incidental moisture loss. Because the original records do not isolate a single physical mechanism, the common thread is organizational or logistical rather than a specific component failure or process deviation.
What is done about it
Standardize the stop-reason taxonomy and operator training so that trials, travel time, utility outages, and equipment notes are logged under distinct, well-defined codes instead of free text, and route each resulting code to the appropriate loss category for root-cause analysis. Periodically review and reclassify residual generic entries to progressively shrink this catch-all bucket.
Practical guidance written from engineering knowledge; it is not a statistical estimate.
1Probability and evidence
- Probability of presence
- 1.3% [0.4–2.9%]
- Expected share of lost time
- 0.7% [0.2–1.6%]
- Share of lost time when present
- 54% [42–64%]
- Studies / units
- 127 / 161
- Evidence grade
- C
Grade C: 2 to 4 studies, or an interval wider than 0.35.
2Probability by segment
- Dairy products1.3% [0.2–4.2%]13 studies
- Soft drinks, bottled water and juices1.5% [0.3–4.4%]26 studies
- Brewing, wine and spirits1.3% [0.2–4.4%]11 studies
- Bakery and pasta1.6% [0.3–4.9%]24 studies
- Meat, poultry and seafood1.3% [0.2–4.2%]9 studies
- Fruit and vegetable processing1.4% [0.2–4.7%]7 studies
- Grain and oilseed milling2.1% [0.3–6.6%]6 studies
- Sugar and confectionery1.4% [0.2–4.6%]9 studies
- Snacks, coffee, tea and other foods1.4% [0.2–4.5%]5 studies
- Animal feed and pet food1.4% [0.2–4.6%]7 studies
- Food manufacturing (unspecified or mixed)2.0% [0.3–6.8%]10 studies
3Mechanism, SCADA signature and countermeasure
Mechanism
Engineering guidanceThis bucket groups heterogeneous line stops that primary studies logged under generic or administrative labels rather than a defined technical failure mode, including development or trial runs, operator travel or walking time between stations, utility supply interruptions, generic equipment remarks, outright breakdowns, and incidental moisture loss. Because the original records do not isolate a single physical mechanism, the common thread is organizational or logistical rather than a specific component failure or process deviation.
How it looks in SCADA data
Engineering guidanceIn SCADA/MES logs this cause appears as short-text free-form stop reasons or reason-code outliers that do not map to a standard failure or changeover taxonomy, often recorded manually with inconsistent duration patterns and no repeatable signal signature on upstream or downstream equipment. Event frequency per label is typically low and scattered across shifts rather than clustered on a specific machine state.
Countermeasure
Engineering guidanceStandardize the stop-reason taxonomy and operator training so that trials, travel time, utility outages, and equipment notes are logged under distinct, well-defined codes instead of free text, and route each resulting code to the appropriate loss category for root-cause analysis. Periodically review and reclassify residual generic entries to progressively shrink this catch-all bucket.
4Sources
- Análise da aplicação de indicadores alternativos ao Overall Equipment Effectiveness (OEE) na gestão do desempenho global de uma fábricaOpen sourceShare of lost time: 8.70 % · as reported: “Teste de P&D (e5)”
Show verbatim quote
Teste de P&D (e5): 8,7% do tempo total de paradas era causado por testes realizados pela área de P&D que, embora fundamentais para o lançamento de novos produtos, também subtraem disponibilidade de tempo para produção efetiva e, portanto, precisam ser muito bem programados.
- Share of lost time: 30.0 % · as reported: “Quebra de equipamento”
Show verbatim quote
verificou-se que as paradas do equipamento Klockner representa 30% de todos estes desperdício e que 36 % estão relacionadas com set ups e 34% são relativas a outro problemas.
- Share of lost time: 16.0 % · as reported: “Fornecimento de Energia”
Show verbatim quote
observou-se, Figura 50, que 70% das paradas de linha estavam relacionadas a problemas no equipamento da Klockner, 16% por problemas de fornecimento de energia e 9% por problemas na máquina de injetora de tinta que faz as identificações nas bolsas plásticas.
- Propuesta para incrementar la disponibilidad de equipos a través de la implementación de Lean Manufacturing e IoT en una industria de galletas (2025)Open sourceLost time: 470 min · as reported: “Pruebas de Desarrollo”
Show verbatim quote
Pruebas de Desarrollo 470 2.60% S/5,586.53
- Propuesta para incrementar la disponibilidad de equipos a través de la implementación de Lean Manufacturing e IoT en una industria de galletas (2025)Open sourceShare of lost time: 2.60 % · as reported: “Pruebas de Desarrollo”
Show verbatim quote
Pruebas de Desarrollo 470 2.60% S/5,586.53
- Propuesta de mejora para incrementar el rendimiento de la línea de salsas usando SMED, Kanban, Industria 4.0 y 5S en una empresa del sector alimenticio (2026)Open sourceMean event duration: 14.8 min · as reported: “Tiempo de recorrido”
Show verbatim quote
Inicialmente, se tenía un tiempo de recorrido de 14.8 min y gracias a la propuesta se alcanzó a 11 min.
- Propuesta de mejora para incrementar el rendimiento de la línea de salsas usando SMED, Kanban, Industria 4.0 y 5S en una empresa del sector alimenticio (2026)Open sourceMean event duration: 11.0 min · as reported: “Tiempo de recorrido”
Show verbatim quote
Inicialmente, se tenía un tiempo de recorrido de 14.8 min y gracias a la propuesta se alcanzó a 11 min.
- Application of TPM in line No 3 to increase production in a company that produces pasta. Lima, 2023 (2023)Open sourceShare of lost time: 5.00 % · as reported: “pérdida de humedad”
Show verbatim quote
significa un 25% de perdida y sólo es justificado el 5% por la naturaleza del proceso (pérdida de humedad)
- Implementation of TPM total productive maintenance methodology to improve productivity in a frozen food company (2023)Open sourceShare of loss events: 56.0 % · as reported: “OBS. EN EQUIPO”
Show verbatim quote
OBS. EN EQUIPO 56%