Propuesta de mejora para incrementar el rendimiento de la línea de salsas usando SMED, Kanban, Industria 4.0 y 5S en una empresa del sector alimenticio

Open source

1Bibliographic record

Authors
Sarita Giselle Benites, Linscy Taina Eustaquio
Year
2026
Venue
Repositorio Académico UPC (Universidad Peruana de Ciencias Aplicadas)
DOI
—
Country
Peru
Segment
Snacks, coffee, tea and other foods
Process family
Filling and packaging line
Study type
Before/after intervention
Extraction scope
Full text
Size
1 plants · 1 lines · — machines
Observation period
365 days
Data collection
manual_logs
Intervention
Show the setting as described by the study
En el presente estudio se evaluará a una empresa peruana dedicada a la fabricación de alimentos y bebidas de consumo masivo, cuya línea de producción de salsas presentó un rendimiento del 74% en el año 2023.

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 14Low risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described.2 / 2
Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events).2 / 2
How were loss data collected?Manual logs or maintenance records with unknown completeness.1 / 2
Are OEE, loading time and the loss categories defined explicitly?A standard definition is cited but its application is not shown.1 / 2
Does the loss breakdown account for the total loss it claims to explain?The reported causes or categories sum to at least 90% of the stated total, or an explicit "other" class closes the balance.2 / 2
Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method.2 / 2
Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points.2 / 2
Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result.2 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
—
Show verbatim quote (Section 2.2, p.28)
Los resultados evidencian que la línea de salsas presenta un rendimiento 74%.
nonePerformance74.0 %Both extractors agreed
Deficiente detección y control en tiempo real de materiales defectuosos
Show verbatim quote (Tabla 13, p.50)
Deficiente detección y control en tiempo real de materiales defectuosos. 1097.04 4.72% 85.59%
Process defects (scrap and rework)Share of lost time4.72 %Both extractors agreed
Deficiente detección y control en tiempo real de materiales defectuosos
Show verbatim quote (Tabla 13, p.50)
Deficiente detección y control en tiempo real de materiales defectuosos. 1097.04 4.72% 85.59%
Process defects (scrap and rework)Lost time1,097 minBoth extractors agreed
Deficiente calibración de equipos
Show verbatim quote (Tabla 13, p.50)
Deficiente calibración de equipos 533.28 2.29% 96.63%
Setup and adjustmentsShare of lost time2.29 %Both extractors agreed
Deficiente calibración de equipos
Show verbatim quote (Tabla 13, p.50)
Deficiente calibración de equipos 533.28 2.29% 96.63%
Setup and adjustmentsLost time533 minBoth extractors agreed
Deficiente asignación de tareas
Show verbatim quote (Tabla 13, p.50)
Deficiente asignación de tareas 4886.52 21.02% 60.87%
Organizational or external stops (material or personnel shortage, utilities outage)Share of lost time21.0 %Both extractors agreed
Deficiente asignación de tareas
Show verbatim quote (Tabla 13, p.50)
Deficiente asignación de tareas 4886.52 21.02% 60.87%
Organizational or external stops (material or personnel shortage, utilities outage)Lost time4,887 minBoth extractors agreed
Demoras por cambios de Formato
Show verbatim quote (Tabla 13, p.50)
Demoras por cambios de Formato 9262.27 39.85% 39.85%
Setup and adjustmentsShare of lost time39.9 %Both extractors agreed
Demoras por cambios de Formato
Show verbatim quote (Tabla 13, p.50)
Demoras por cambios de Formato 9262.27 39.85% 39.85%
Setup and adjustmentsLost time9,262 minBoth extractors agreed
Desorden en el área de trabajo
Show verbatim quote (Tabla 13, p.50)
Desorden en el área de trabajo 1115.09 4.80% 80.87%
Idling and minor stops (micro-stops)Share of lost time4.80 %Both extractors agreed
Desorden en el área de trabajo
Show verbatim quote (Tabla 13, p.50)
Desorden en el área de trabajo 1115.09 4.80% 80.87%
Idling and minor stops (micro-stops)Lost time1,115 minBoth extractors agreed
Averías en las máquinas
Show verbatim quote (Tabla 13, p.50)
Averías en las máquinas 1056.48 4.55% 90.13%
Equipment failure (breakdowns)Share of lost time4.55 %Both extractors agreed
Averías en las máquinas
Show verbatim quote (Tabla 13, p.50)
Averías en las máquinas 1056.48 4.55% 90.13%
Equipment failure (breakdowns)Lost time1,056 minBoth extractors agreed
Rotura de stock
Show verbatim quote (Tabla 13, p.50)
Rotura de stock 3532.73 15.20% 76.07%
Organizational or external stops (material or personnel shortage, utilities outage)Share of lost time15.2 %Both extractors agreed
Rotura de stock
Show verbatim quote (Tabla 13, p.50)
Rotura de stock 3532.73 15.20% 76.07%
Organizational or external stops (material or personnel shortage, utilities outage)Lost time3,533 minBoth extractors agreed
Errores humanos
Show verbatim quote (Tabla 13, p.50)
Errores humanos 977.64 4.21% 94.34%
Not classifiable from the reportShare of lost time4.21 %Both extractors agreed
Errores humanos
Show verbatim quote (Tabla 13, p.50)
Errores humanos 977.64 4.21% 94.34%
Not classifiable from the reportLost time978 minBoth extractors agreed
Otros
Show verbatim quote (Tabla 13, p.50)
Otros 289.87 1.25% 100.00%
Not classifiable from the reportShare of lost time1.25 %Both extractors agreed
Otros
Show verbatim quote (Tabla 13, p.50)
Otros 289.87 1.25% 100.00%
Not classifiable from the reportLost time290 minBoth extractors agreed
—
Show verbatim quote (Conclusiones, p.150)
el uso de sensores IoT facilitó el monitoreo en tiempo real de parámetros críticos, logrando incrementar el indicador de calidad del 79% al 85%.
noneQuality79.0 %Single extractor
Tiempo de recorrido
Show verbatim quote (Section 4.2.2.4, p.128-129)
Inicialmente, se tenía un tiempo de recorrido de 14.8 min y gracias a la propuesta se alcanzó a 11 min.
Idling and minor stops (micro-stops)Mean event duration14.8 minSingle extractor
Incidencias por desorden o limpieza
Show verbatim quote (Section 4.2.2.3, p.128)
gracias a la propuesta de mejora se ha logrado reducir las incidencias por desorden y limpieza de un 47% a un 22% e incrementar la calidad de los productos de un 79% a un 85%
Process defects (scrap and rework)Share of loss events47.0 %Single extractor
cambio de producto
Show verbatim quote (Tabla 55, p.129)
Setup inicial (horas) 3.20 3.20 3.20 3.20 3.20 3.20
Setup and adjustmentsMean event duration3.20 hSingle extractor
cambio de presentación
Show verbatim quote (Tabla 56, p.129-130)
Setup inicial (horas) 0.63 0.63 0.63 0.63 0.63 0.63
Setup and adjustmentsMean event duration0.630 hSingle extractor
cambio de producto
Show verbatim quote (Tabla 55, p.129)
Cambio de producto / año 52 55 57 60 63 66
Setup and adjustmentsNumber of events52.0 events/yearSingle extractor
cambio de presentación
Show verbatim quote (Tabla 56, p.129-130)
Cambio de presentación / año 208 218 229 241 253 265
Setup and adjustmentsNumber of events208 events/yearSingle extractor
Defectos por desorden en el área de trabajo
Show verbatim quote (Section 2.3.2.1, p.56)
se han registrado 9 incidencias de calidad debido a los defectos de calidad.
Process defects (scrap and rework)Number of events9.00 incidenciasSingle extractor
Deficiente detección y control en tiempo real de materiales defectuosos
Show verbatim quote (Section 2.3.2.2, p.57)
Alrededor de 7660 unidades se desecharon en el año 2023 debido a esta causa.
Process defects (scrap and rework)Number of events7,660 unitsSingle extractor
—
Show verbatim quote (Conclusiones, p.150)
La propuesta de mejora permitió aumentar el rendimiento de la línea de salsas del 74% al 82%, lo que significa un incremento del 8%.
nonePerformance82.0 %Single extractor
—
Show verbatim quote (Conclusiones, p.150)
el uso de sensores IoT facilitó el monitoreo en tiempo real de parámetros críticos, logrando incrementar el indicador de calidad del 79% al 85%.
noneQuality85.0 %Single extractor
Tiempo de recorrido
Show verbatim quote (Section 4.2.2.4, p.128-129)
Inicialmente, se tenía un tiempo de recorrido de 14.8 min y gracias a la propuesta se alcanzó a 11 min.
Idling and minor stops (micro-stops)Mean event duration11.0 minSingle extractor
Incidencias por desorden o limpieza
Show verbatim quote (Section 4.2.2.3, p.128)
gracias a la propuesta de mejora se ha logrado reducir las incidencias por desorden y limpieza de un 47% a un 22% e incrementar la calidad de los productos de un 79% a un 85%
Process defects (scrap and rework)Share of loss events22.0 %Single extractor
cambio de producto
Show verbatim quote (Tabla 55, p.129)
Tiempo setup logrado (horas) 1.99 1.99 1.92 1.92 1.92 1.92
Setup and adjustmentsMean event duration1.99 hSingle extractor
cambio de presentación
Show verbatim quote (Tabla 56, p.129-130)
Tiempo setup logrado (horas) 0.44 0.44 0.38 0.38 0.38 0.38
Setup and adjustmentsMean event duration0.440 hSingle extractor

Observation units

  • Línea de salsas · Whole line or unspecified equipment · Baseline
  • Línea de salsas · Whole line or unspecified equipment · After intervention