Propuesta para incrementar la disponibilidad de equipos a través de la implementación de Lean Manufacturing e IoT en una industria de galletas

Open source

1Bibliographic record

Authors
Cuipal Zumaeta, Johanna Milagros, Solano Longa, Angela Geraldine
Year
2025
Venue
Repositorio Académico UPC (Universidad Peruana de Ciencias Aplicadas)
DOI
—
Country
Peru
Segment
Bakery and pasta
Process family
Forming, baking and cooking
Study type
Before/after intervention
Extraction scope
Full text
Size
1 plants · 10 lines · 10 machines
Observation period
365 days
Data collection
automatic_monitoring
Intervention
Show the setting as described by the study
El presente análisis se centra en la planta de galletas, que concentra a 900 de los más de 3 000 trabajadores de la empresa y dispone de 10 líneas de producción.

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 11Moderate risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described.2 / 2
Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events).2 / 2
How were loss data collected?Manual logs or maintenance records with unknown completeness.1 / 2
Are OEE, loading time and the loss categories defined explicitly?A standard definition is cited but its application is not shown.1 / 2
Does the loss breakdown account for the total loss it claims to explain?Only the top causes are reported and the unexplained remainder can be computed.1 / 2
Is there evidence of selective reporting of favourable results?Intervention study in which baseline and post-intervention periods differ in length or method.1 / 2
Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points.2 / 2
Could conflicts of interest or the source of the data bias the result?Authors are employees of the plant or of an equipment/software vendor; no declaration.1 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
—
Show verbatim quote (Section 2.2 / Table 4)
donde se observa que la línea de Galletas alcanza el valor más bajo con un 72.04% (revisar anexo 5), identificándose, así como el punto crítico de análisis
noneOEE72.0 %Both extractors agreed
Pruebas de Desarrollo
Show verbatim quote (Table 6)
Pruebas de Desarrollo 470 2.60% S/5,586.53
Organizational or external stops (material or personnel shortage, utilities outage)Lost time470 minBoth extractors agreed
Mantención Programada
Show verbatim quote (Table 6)
Mantención Programada 590 1.60% S/29,964.12
Planned downtime (scheduled maintenance, breaks, no demand)Lost time590 minBoth extractors agreed
Falta Materia Prima
Show verbatim quote (Table 6)
Falta Materia Prima 250 0.80% S/10,953.25
Organizational or external stops (material or personnel shortage, utilities outage)Lost time250 minBoth extractors agreed
Falta Mat.Env.Emb.
Show verbatim quote (Table 6)
Falta Mat.Env.Emb. 35 0.10% S/1,528.47
Organizational or external stops (material or personnel shortage, utilities outage)Lost time35.0 minBoth extractors agreed
Falta Personal
Show verbatim quote (Table 6)
Falta Personal 180 0.60% S/6,787.80
Organizational or external stops (material or personnel shortage, utilities outage)Lost time180 minBoth extractors agreed
—
Show verbatim quote (Table 26)
Disponibilidad (%) Desempeño (%) Calidad (%) OEE (%) Mejora (%) AS IS 78.32% 95.87% 95.94% 72.04% 13.03% TO BE 86.69% 98.39% 97.12% 82.84%
noneQuality97.1 %Both extractors agreed
—
Show verbatim quote (Table 26)
Disponibilidad (%) Desempeño (%) Calidad (%) OEE (%) Mejora (%) AS IS 78.32% 95.87% 95.94% 72.04% 13.03% TO BE 86.69% 98.39% 97.12% 82.84%
nonePerformance98.4 %Both extractors agreed
—
Show verbatim quote (Table 26)
Disponibilidad (%) Desempeño (%) Calidad (%) OEE (%) Mejora (%) AS IS 78.32% 95.87% 95.94% 72.04% 13.03% TO BE 86.69% 98.39% 97.12% 82.84%
noneQuality95.9 %Both extractors agreed
—
Show verbatim quote (Table 26)
Disponibilidad (%) Desempeño (%) Calidad (%) OEE (%) Mejora (%) AS IS 78.32% 95.87% 95.94% 72.04% 13.03% TO BE 86.69% 98.39% 97.12% 82.84%
nonePerformance95.9 %Both extractors agreed
Elevados tiempos de setup
Show verbatim quote (Table 22)
AS IS 731 52,802 72.24 23.3% TO BE 408 22,606 55.41
Setup and adjustmentsNumber of events731 eventsBoth extractors agreed
Elevados tiempos de setup
Show verbatim quote (Table 22)
AS IS 731 52,802 72.24 23.3% TO BE 408 22,606 55.41
Setup and adjustmentsLost time22,606 minBoth extractors agreed
Elevados tiempos de setup
Show verbatim quote (Table 22)
AS IS 731 52,802 72.24 23.3% TO BE 408 22,606 55.41
Setup and adjustmentsNumber of events408 eventsBoth extractors agreed
Elevados tiempos de setup
Show verbatim quote (Table 22)
AS IS 731 52,802 72.24 23.3% TO BE 408 22,606 55.41
Setup and adjustmentsMean event duration55.4 minBoth extractors agreed
Elevados tiempos de setup
Show verbatim quote (Table 22)
AS IS 731 52,802 72.24 23.3% TO BE 408 22,606 55.41
Setup and adjustmentsLost time52,802 minBoth extractors agreed
Elevados tiempos de setup
Show verbatim quote (Table 22)
AS IS 731 52,802 72.24 23.3% TO BE 408 22,606 55.41
Setup and adjustmentsMean event duration72.2 minBoth extractors agreed
—
Show verbatim quote (Table 24)
AS IS TO BE % Mejora MTBF (hr) 42 45 6.37% MTTR (min) 96 89 7.38%
noneMean event duration89.0 minBoth extractors agreed
—
Show verbatim quote (Table 24)
AS IS TO BE % Mejora MTBF (hr) 42 45 6.37% MTTR (min) 96 89 7.38%
noneMean event duration96.0 minBoth extractors agreed
—
Show verbatim quote (Table 24)
AS IS TO BE % Mejora MTBF (hr) 42 45 6.37% MTTR (min) 96 89 7.38%
noneTime between events45.0 hrBoth extractors agreed
—
Show verbatim quote (Table 24)
AS IS TO BE % Mejora MTBF (hr) 42 45 6.37% MTTR (min) 96 89 7.38%
noneTime between events42.0 hrBoth extractors agreed
—
Show verbatim quote (Section 2.2 / Figure 4)
mientras que la disponibilidad presenta un valor de 78.32% (revisar anexo 11), por debajo del objetivo.
noneAvailability78.3 %Single extractor
fallas mecánicas, eléctricas y fallas operacionales
Show verbatim quote (Section 2.3.2 / Table 7)
Los motivos principales son las fallas mecánicas, eléctricas, y las fallas operacionales, las cuales generaron 11990 minutos de detención en el año 2024 según se presenta en la tabla 7
Not classifiable from the reportLost time11,990 minSingle extractor
Mantención Programada
Show verbatim quote (Table 6)
Mantención Programada 590 1.60% S/29,964.12
Planned downtime (scheduled maintenance, breaks, no demand)Share of lost time1.60 %Single extractor
Pruebas de Desarrollo
Show verbatim quote (Table 6)
Pruebas de Desarrollo 470 2.60% S/5,586.53
Organizational or external stops (material or personnel shortage, utilities outage)Share of lost time2.60 %Single extractor
Falta Materia Prima
Show verbatim quote (Table 6)
Falta Materia Prima 250 0.80% S/10,953.25
Organizational or external stops (material or personnel shortage, utilities outage)Share of lost time0.800 %Single extractor
Capacitación
Show verbatim quote (Table 6)
Capacitación 1820 7.20% S/78,113.64
Organizational or external stops (material or personnel shortage, utilities outage)Lost time1,820 minSingle extractor
Capacitación
Show verbatim quote (Table 6)
Capacitación 1820 7.20% S/78,113.64
Organizational or external stops (material or personnel shortage, utilities outage)Share of lost time7.20 %Single extractor
Falta Mat.Env.Emb.
Show verbatim quote (Table 6)
Falta Mat.Env.Emb. 35 0.10% S/1,528.47
Organizational or external stops (material or personnel shortage, utilities outage)Share of lost time0.100 %Single extractor
Falta Personal
Show verbatim quote (Table 6)
Falta Personal 180 0.60% S/6,787.80
Organizational or external stops (material or personnel shortage, utilities outage)Share of lost time0.600 %Single extractor
Cambio de Programación
Show verbatim quote (Table 6)
Cambio de Programación 0 0.00% S/ -
Organizational or external stops (material or personnel shortage, utilities outage)Lost time0 minSingle extractor
Falla Mecánica y eléctrica
Show verbatim quote (Table 6)
Falla Mecánica y eléctrica 7039 24.300% S/336,117.47
Equipment failure (breakdowns)Lost time7,039 minSingle extractor
Falla Mecánica y eléctrica
Show verbatim quote (Table 6)
Falla Mecánica y eléctrica 7039 24.300% S/336,117.47
Equipment failure (breakdowns)Share of lost time24.3 %Single extractor
Fallo por Operacional
Show verbatim quote (Table 6)
Fallo por Operacional 4951 15.400% S/230,758.64
Idling and minor stops (micro-stops)Lost time4,951 minSingle extractor
Fallo por Operacional
Show verbatim quote (Table 6)
Fallo por Operacional 4951 15.400% S/230,758.64
Idling and minor stops (micro-stops)Share of lost time15.4 %Single extractor
Elevados tiempos de setup
Show verbatim quote (Table 6)
Elevados tiempos de setup 52,802 184.900% S/2,375,887.99
Setup and adjustmentsShare of lost time185 %Single extractor
—
Show verbatim quote (Table 26)
Disponibilidad (%) Desempeño (%) Calidad (%) OEE (%) Mejora (%) AS IS 78.32% 95.87% 95.94% 72.04% 13.03% TO BE 86.69% 98.39% 97.12% 82.84%
noneAvailability86.7 %Single extractor
—
Show verbatim quote (Table 26)
Disponibilidad (%) Desempeño (%) Calidad (%) OEE (%) Mejora (%) AS IS 78.32% 95.87% 95.94% 72.04% 13.03% TO BE 86.69% 98.39% 97.12% 82.84%
noneOEE82.8 %Single extractor
—Envasadora Tecnopack
Show verbatim quote (Table 3)
Envasadoras Tecnopack 11583.29 17%
Not classifiable from the reportLost time11,583 minSingle extractor
—Envasadora Tecnopack
Show verbatim quote (Table 3)
Envasadoras Tecnopack 11583.29 17%
Not classifiable from the reportShare of lost time17.0 %Single extractor
—Envasadora Tecnopack
Show verbatim quote (Table 11)
Envasadora Tecnopack 17% 12.28
Setup and adjustmentsShare of lost time17.0 %Single extractor
—Envasadora Tecnopack
Show verbatim quote (Table 11)
Envasadora Tecnopack 17% 12.28
Setup and adjustmentsMean event duration12.3 minSingle extractor
—Envasadora Schib
Show verbatim quote (Table 3)
Envasadora Schib 10220.55 15%
Not classifiable from the reportLost time10,221 minSingle extractor
—Envasadora Schib
Show verbatim quote (Table 3)
Envasadora Schib 10220.55 15%
Not classifiable from the reportShare of lost time15.0 %Single extractor
—Envasadora Schib
Show verbatim quote (Table 11)
Envasadora Schib 15% 10.83
Setup and adjustmentsShare of lost time15.0 %Single extractor
—Envasadora Schib
Show verbatim quote (Table 11)
Envasadora Schib 15% 10.83
Setup and adjustmentsMean event duration10.8 minSingle extractor
—Fajas de enfriamiento
Show verbatim quote (Table 3)
Fajas de enfriamiento 9539.18 14%
Not classifiable from the reportLost time9,539 minSingle extractor
—Fajas de enfriamiento
Show verbatim quote (Table 3)
Fajas de enfriamiento 9539.18 14%
Not classifiable from the reportShare of lost time14.0 %Single extractor
—Fajas de enfriamiento
Show verbatim quote (Table 11)
Fajas de enfriamiento 14% 10.11
Setup and adjustmentsShare of lost time14.0 %Single extractor
—Fajas de enfriamiento
Show verbatim quote (Table 11)
Fajas de enfriamiento 14% 10.11
Setup and adjustmentsMean event duration10.1 minSingle extractor
—Troquel
Show verbatim quote (Table 3)
Troquel 8176.44 12%
Not classifiable from the reportLost time8,176 minSingle extractor
—Troquel
Show verbatim quote (Table 3)
Troquel 8176.44 12%
Not classifiable from the reportShare of lost time12.0 %Single extractor
—Troquel
Show verbatim quote (Table 11)
Troquel 12% 8.67
Setup and adjustmentsShare of lost time12.0 %Single extractor
—Troquel
Show verbatim quote (Table 11)
Troquel 12% 8.67
Setup and adjustmentsMean event duration8.67 minSingle extractor
—Horno
Show verbatim quote (Table 3)
Horno 7495.07 11%
Not classifiable from the reportLost time7,495 minSingle extractor
—Horno
Show verbatim quote (Table 3)
Horno 7495.07 11%
Not classifiable from the reportShare of lost time11.0 %Single extractor
—Horno
Show verbatim quote (Table 11)
Horno 11% 7.95
Setup and adjustmentsShare of lost time11.0 %Single extractor
—Horno
Show verbatim quote (Table 11)
Horno 11% 7.95
Setup and adjustmentsMean event duration7.95 minSingle extractor
—Apilador
Show verbatim quote (Table 3)
Apilador 6813.7 10%
Not classifiable from the reportLost time6,814 minSingle extractor
—Apilador
Show verbatim quote (Table 3)
Apilador 6813.7 10%
Not classifiable from the reportShare of lost time10.0 %Single extractor
—Apilador
Show verbatim quote (Table 11)
Apilador 10% 7.22
Setup and adjustmentsShare of lost time10.0 %Single extractor
—Apilador
Show verbatim quote (Table 11)
Apilador 10% 7.22
Setup and adjustmentsMean event duration7.22 minSingle extractor
—Batidora de masa
Show verbatim quote (Table 3)
Batidora de masa 5450.96 8%
Not classifiable from the reportLost time5,451 minSingle extractor
—Batidora de masa
Show verbatim quote (Table 3)
Batidora de masa 5450.96 8%
Not classifiable from the reportShare of lost time8.00 %Single extractor
—Batidora de masa
Show verbatim quote (Table 11)
Batidora de masa 8% 5.8
Setup and adjustmentsShare of lost time8.00 %Single extractor
—Batidora de masa
Show verbatim quote (Table 11)
Batidora de masa 8% 5.8
Setup and adjustmentsMean event duration5.80 minSingle extractor
—Extrusora
Show verbatim quote (Table 3)
Extrusora 4088.22 6%
Not classifiable from the reportLost time4,088 minSingle extractor
—Extrusora
Show verbatim quote (Table 3)
Extrusora 4088.22 6%
Not classifiable from the reportShare of lost time6.00 %Single extractor
—Extrusora
Show verbatim quote (Table 11)
Extrusora 6% 4.33
Setup and adjustmentsShare of lost time6.00 %Single extractor
—Extrusora
Show verbatim quote (Table 11)
Extrusora 6% 4.33
Setup and adjustmentsMean event duration4.33 minSingle extractor
—Túnel de enfriamiento
Show verbatim quote (Table 3)
Túnel de enfriamiento 3406.85 5%
Not classifiable from the reportLost time3,407 minSingle extractor
—Túnel de enfriamiento
Show verbatim quote (Table 3)
Túnel de enfriamiento 3406.85 5%
Not classifiable from the reportShare of lost time5.00 %Single extractor
—Túnel de enfriamiento
Show verbatim quote (Table 11)
Túnel de enfriamiento 5% 3.61
Setup and adjustmentsShare of lost time5.00 %Single extractor
—Túnel de enfriamiento
Show verbatim quote (Table 11)
Túnel de enfriamiento 5% 3.61
Setup and adjustmentsMean event duration3.61 minSingle extractor
—Encintadora
Show verbatim quote (Table 11)
Encintadora 2% 1.44
Setup and adjustmentsShare of lost time2.00 %Single extractor
—Encintadora
Show verbatim quote (Table 11)
Encintadora 2% 1.44
Setup and adjustmentsMean event duration1.44 minSingle extractor
—
Show verbatim quote (Table 4)
Líneas de la Planta Galletas W1 W2 W3 Línea Galletas W4 B1 G4 G3 C1 G2 OEE (%) 84.6% 80.31% 87.10% 72.04% 91% 84.60% 76.10% 73.60% 87% 76%
noneOEE84.6 %Single extractor
—
Show verbatim quote (Table 4)
Líneas de la Planta Galletas W1 W2 W3 Línea Galletas W4 B1 G4 G3 C1 G2 OEE (%) 84.6% 80.31% 87.10% 72.04% 91% 84.60% 76.10% 73.60% 87% 76%
noneOEE80.3 %Single extractor
—
Show verbatim quote (Table 4)
Líneas de la Planta Galletas W1 W2 W3 Línea Galletas W4 B1 G4 G3 C1 G2 OEE (%) 84.6% 80.31% 87.10% 72.04% 91% 84.60% 76.10% 73.60% 87% 76%
noneOEE87.1 %Single extractor
—
Show verbatim quote (Table 4)
Líneas de la Planta Galletas W1 W2 W3 Línea Galletas W4 B1 G4 G3 C1 G2 OEE (%) 84.6% 80.31% 87.10% 72.04% 91% 84.60% 76.10% 73.60% 87% 76%
noneOEE91.0 %Single extractor
—
Show verbatim quote (Table 4)
Líneas de la Planta Galletas W1 W2 W3 Línea Galletas W4 B1 G4 G3 C1 G2 OEE (%) 84.6% 80.31% 87.10% 72.04% 91% 84.60% 76.10% 73.60% 87% 76%
noneOEE84.6 %Single extractor
—
Show verbatim quote (Table 4)
Líneas de la Planta Galletas W1 W2 W3 Línea Galletas W4 B1 G4 G3 C1 G2 OEE (%) 84.6% 80.31% 87.10% 72.04% 91% 84.60% 76.10% 73.60% 87% 76%
noneOEE76.1 %Single extractor
—
Show verbatim quote (Table 4)
Líneas de la Planta Galletas W1 W2 W3 Línea Galletas W4 B1 G4 G3 C1 G2 OEE (%) 84.6% 80.31% 87.10% 72.04% 91% 84.60% 76.10% 73.60% 87% 76%
noneOEE73.6 %Single extractor
—
Show verbatim quote (Table 4)
Líneas de la Planta Galletas W1 W2 W3 Línea Galletas W4 B1 G4 G3 C1 G2 OEE (%) 84.6% 80.31% 87.10% 72.04% 91% 84.60% 76.10% 73.60% 87% 76%
noneOEE87.0 %Single extractor
—
Show verbatim quote (Table 4)
Líneas de la Planta Galletas W1 W2 W3 Línea Galletas W4 B1 G4 G3 C1 G2 OEE (%) 84.6% 80.31% 87.10% 72.04% 91% 84.60% 76.10% 73.60% 87% 76%
noneOEE76.0 %Single extractor

Observation units

  • Línea Galletas · Whole line or unspecified equipment · Baseline
  • Línea Galletas · Whole line or unspecified equipment · After intervention
  • Envasadora Tecnopack · Packaging (forming, sealing, wrapping, case packing, palletizing) · Baseline
  • Envasadora Schib · Packaging (forming, sealing, wrapping, case packing, palletizing) · Baseline
  • Fajas de enfriamiento · Conveying and accumulation · Baseline
  • Troquel · Forming, moulding and depositing · Baseline
  • Horno · Baking · Baseline
  • Apilador · Conveying and accumulation · Baseline
  • Batidora de masa · Mixing and blending · Baseline
  • Extrusora · Extrusion · Baseline
  • Túnel de enfriamiento · Refrigeration and freezing · Baseline
  • Encintadora · Packaging (forming, sealing, wrapping, case packing, palletizing) · Baseline
  • W1 · Whole line or unspecified equipment · Baseline
  • W2 · Whole line or unspecified equipment · Baseline
  • W3 · Whole line or unspecified equipment · Baseline
  • W4 · Whole line or unspecified equipment · Baseline
  • B1 · Whole line or unspecified equipment · Baseline
  • G4 · Whole line or unspecified equipment · Baseline
  • G3 · Whole line or unspecified equipment · Baseline
  • C1 · Whole line or unspecified equipment · Baseline
  • G2 · Whole line or unspecified equipment · Baseline