Operator-related inefficiency
In short
It appears in about 1 of every 100 lines studied.
When it appears, it takes on average about 56 % of the line's lost time. Reported by 1 of the 127 studies that could observe it (sparse evidence).
What happens
Line performance is limited by the human factor rather than by equipment condition: insufficient staffing, operator absence, lack of training or slow manual task execution delays restarts and keeps the line running below its rated rate. The loss is attributed to labour organisation rather than to a mechanical, electrical or process cause.
What is done about it
Ensure adequate staffing levels and cross-training, standardise work instructions for manual tasks, and monitor operator-attributed stop and speed-loss time to identify and close skill or staffing gaps.
Practical guidance written from engineering knowledge; it is not a statistical estimate.
1Probability and evidence
- Probability of presence
- 0.5% [0.1–1.5%]
- Expected share of lost time
- 0.3% [0.1–0.8%]
- Share of lost time when present
- 56% [45–66%]
- Studies / units
- 127 / 161
- Evidence grade
- D
Grade D: 0 or 1 study; the estimate is driven by partial pooling and priors, and the wide interval is the result.
2Probability by segment
- Dairy products0.6% [0.1–2.4%]13 studies
- Soft drinks, bottled water and juices0.5% [0.1–1.9%]26 studies
- Brewing, wine and spirits0.6% [0.1–2.2%]11 studies
- Bakery and pasta0.8% [0.1–2.7%]24 studies
- Meat, poultry and seafood0.6% [0.1–2.2%]9 studies
- Fruit and vegetable processing0.6% [0.1–2.4%]7 studies
- Grain and oilseed milling0.6% [0.1–2.3%]6 studies
- Sugar and confectionery0.6% [0.1–2.5%]9 studies
- Snacks, coffee, tea and other foods0.6% [0.1–2.3%]5 studies
- Animal feed and pet food0.6% [0.1–2.2%]7 studies
- Food manufacturing (unspecified or mixed)0.6% [0.1–2.4%]10 studies
3Mechanism, SCADA signature and countermeasure
Mechanism
Engineering guidanceLine performance is limited by the human factor rather than by equipment condition: insufficient staffing, operator absence, lack of training or slow manual task execution delays restarts and keeps the line running below its rated rate. The loss is attributed to labour organisation rather than to a mechanical, electrical or process cause.
How it looks in SCADA data
Engineering guidanceStop or downtime events are logged under a generic manual/operator reason code with no associated equipment fault or alarm, often with extended line-stopped duration while waiting for an operator action. Running periods show actual speed persistently below the target set point without any corresponding equipment degradation signal.
Countermeasure
Engineering guidanceEnsure adequate staffing levels and cross-training, standardise work instructions for manual tasks, and monitor operator-attributed stop and speed-loss time to identify and close skill or staffing gaps.
4Sources
- Reduction of Machine Breakdown in the Brewery Manufacturing Company, A Case Study of Brewery “A” in the Eastern Nigeria (2023)Open sourceLost time: 4.00 min · as reported: “Operational (man)”
Show verbatim quote
Operational (man) 10 0 0 5 13 0 0 4 0 0 0 27
- Reduction of Machine Breakdown in the Brewery Manufacturing Company, A Case Study of Brewery “A” in the Eastern Nigeria (2023)Open sourceLost time: 5.00 min · as reported: “Operational (man)”
Show verbatim quote
Operational (man) 10 0 0 5 13 0 0 4 0 0 0 27
- Reduction of Machine Breakdown in the Brewery Manufacturing Company, A Case Study of Brewery “A” in the Eastern Nigeria (2023)Open sourceLost time: 13.0 min · as reported: “Operational (man)”
Show verbatim quote
Operational (man) 10 0 0 5 13 0 0 4 0 0 0 27
- Reduction of Machine Breakdown in the Brewery Manufacturing Company, A Case Study of Brewery “A” in the Eastern Nigeria (2023)Open sourceLost time: 10.0 min · as reported: “Operational (man)”
Show verbatim quote
Operational (man) 10 0 0 5 13 0 0 4 0 0 0 27
- Reduction of Machine Breakdown in the Brewery Manufacturing Company, A Case Study of Brewery “A” in the Eastern Nigeria (2023)Open sourceLost time: 27.0 min · as reported: “Operational (man)”
Show verbatim quote
Operational (man) 10 0 0 5 13 0 0 4 0 0 0 27
- Reliability-Centered Maintenance Model to Improve OEE in a Mass-Consumption Food Company: A Case Study from Peru (2025)Open sourceShare of lost time: 46.5 % · as reported: “low operational performance”
Show verbatim quote
The analysis revealed three main reasons contributing to this issue: production line stoppages accounted for 49.2% of the problem, followed by low operational performance with a contribution of 46.5%, and a smaller share of 4.3% attributed to defective products.