Included study
Reliability-Centered Maintenance Model to Improve OEE in a Mass-Consumption Food Company: A Case Study from Peru
1Bibliographic record
- Authors
- Sebastian Enrique Maceda-Cabrejo, Mauricio Ivan Velazco-Gomez, Richard Nicholas Meza-Ortiz
- Year
- 2025
- Venue
- International Journal of Industrial Engineering
- Country
- Peru
- Segment
- Bakery and pasta
- Process family
- Forming, baking and cooking
- Study type
- Before/after intervention
- Extraction scope
- Full text
- Size
- 1 plants · 1 lines · 20 machines
- Observation period
- 120 days
- Data collection
- maintenance_records
- Intervention
Show the setting as described by the study
The diagnosis conducted in the case study identified the central problem as a low Overall Equipment Effectiveness (OEE) in the filled cookie production line, with an initial level of only 57.93%, revealing a technical gap in relation to the target of 80%.
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 10Moderate risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described. | 2 / 2 |
| Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events). | 2 / 2 |
| How were loss data collected?Manual logs or maintenance records with unknown completeness. | 1 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?No definition; metrics are reported as bare numbers. | 0 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?The reported causes or categories sum to at least 90% of the stated total, or an explicit "other" class closes the balance. | 2 / 2 |
| Is there evidence of selective reporting of favourable results?Intervention study in which baseline and post-intervention periods differ in length or method. | 1 / 2 |
| Are the reported numbers internally consistent?Inconsistencies above 10 percentage points, or OEE factors above 100%. | 0 / 2 |
| Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result. | 2 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
—Show verbatim quote (Table 4)Production Line Performance Rate % 77.74% 90% 86.14% 10.81% | none | Performance | 77.7 % | Both extractors agreed |
—Show verbatim quote (Table 4)Defective Product Rate % 2.04% 1% 1.21% -40.69% | Process defects (scrap and rework) | Defect rate | 2.04 % | Both extractors agreed |
—Show verbatim quote (Table 4)OEE % 57.93% 80% 75.67% 30.62% | none | OEE | 57.9 % | Both extractors agreed |
—Show verbatim quote (Table 4)Production Line Performance Rate % 77.74% 90% 86.14% 10.81% | none | Performance | 86.1 % | Both extractors agreed |
—Show verbatim quote (Table 4)Defective Product Rate % 2.04% 1% 1.21% -40.69% | Process defects (scrap and rework) | Defect rate | 1.21 % | Both extractors agreed |
Failure Downtime RateShow verbatim quote (Table 4)Failure Downtime Rate % 23.53% 12% 13.86% -41.10% | Equipment failure (breakdowns) | Share of lost time | 23.5 % | Single extractor |
production line stoppagesShow verbatim quote (Section 4.2 Initial Diagnosis)The analysis revealed three main reasons contributing to this issue: production line stoppages accounted for 49.2% of the problem, followed by low operational performance with a contribution of 46.5%, and a smaller share of 4.3% attributed to defective products. | Equipment failure (breakdowns) | Share of lost time | 49.2 % | Single extractor |
low operational performanceShow verbatim quote (Section 4.2 Initial Diagnosis)The analysis revealed three main reasons contributing to this issue: production line stoppages accounted for 49.2% of the problem, followed by low operational performance with a contribution of 46.5%, and a smaller share of 4.3% attributed to defective products. | Reduced speed | Share of lost time | 46.5 % | Single extractor |
defective productsShow verbatim quote (Section 4.2 Initial Diagnosis)The analysis revealed three main reasons contributing to this issue: production line stoppages accounted for 49.2% of the problem, followed by low operational performance with a contribution of 46.5%, and a smaller share of 4.3% attributed to defective products. | Process defects (scrap and rework) | Share of lost time | 4.30 % | Single extractor |
mechanical and electrical failuresShow verbatim quote (Section 4.2 Initial Diagnosis)These reasons were linked to specific root causes: mechanical and electrical failures explained 30.2% of the stoppages, while instrumentation faults represented 19%. | Equipment failure (breakdowns) | Share of lost time | 30.2 % | Single extractor |
instrumentation faultsShow verbatim quote (Section 4.2 Initial Diagnosis)These reasons were linked to specific root causes: mechanical and electrical failures explained 30.2% of the stoppages, while instrumentation faults represented 19%. | Equipment failure (breakdowns) | Share of lost time | 19.0 % | Single extractor |
improper adjustment of the sealing systemsealing systemShow verbatim quote (Section 4.2 Initial Diagnosis)Additionally, 46.5% of the low performance was due to improper adjustment of the sealing system, and the presence of defective products was associated with wear on the magazine chain of the primary packaging machine, accounting for 4.3%. | Reduced speed | Share of lost time | 46.5 % | Single extractor |
wear on the magazine chain of the primary packaging machineprimary packaging machineShow verbatim quote (Section 4.2 Initial Diagnosis)Additionally, 46.5% of the low performance was due to improper adjustment of the sealing system, and the presence of defective products was associated with wear on the magazine chain of the primary packaging machine, accounting for 4.3%. | Process defects (scrap and rework) | Share of lost time | 4.30 % | Single extractor |
—Show verbatim quote (Section 6 Conclusion)The implementation yielded meaningful operational gains, including a 20.7% reduction in production line downtime and a notable improvement in OEE from 45.6% to 65.5%. | none | OEE | 45.6 % | Single extractor |
—Show verbatim quote (Table 4)OEE % 57.93% 80% 75.67% 30.62% | none | OEE | 75.7 % | Single extractor |
Failure Downtime RateShow verbatim quote (Table 4)Failure Downtime Rate % 23.53% 12% 13.86% -41.10% | Equipment failure (breakdowns) | Share of lost time | 13.9 % | Single extractor |
—Show verbatim quote (Section 6 Conclusion)The implementation yielded meaningful operational gains, including a 20.7% reduction in production line downtime and a notable improvement in OEE from 45.6% to 65.5%. | none | OEE | 65.5 % | Single extractor |
—Show verbatim quote (Table 4, page 8)Failure Downtime Rate % 23.53% | Equipment failure (breakdowns) | Share of planned time | 23.5 % | Single extractor |
—Show verbatim quote (Table 4, page 8)Failure Downtime Rate % 13.86% | Equipment failure (breakdowns) | Share of planned time | 13.9 % | Single extractor |
Observation units
- Filled cookie production line · Whole line or unspecified equipment · Baseline
- Filled cookie production line · Whole line or unspecified equipment · After intervention