foratvise
Get Started
Included study

Reliability-Centered Maintenance Model to Improve OEE in a Mass-Consumption Food Company: A Case Study from Peru

Open source

1Bibliographic record

Authors
Sebastian Enrique Maceda-Cabrejo, Mauricio Ivan Velazco-Gomez, Richard Nicholas Meza-Ortiz
Year
2025
Venue
International Journal of Industrial Engineering
Country
Peru
Segment
Bakery and pasta
Process family
Forming, baking and cooking
Study type
Before/after intervention
Extraction scope
Full text
Size
1 plants · 1 lines · 20 machines
Observation period
120 days
Data collection
maintenance_records
Intervention
Show the setting as described by the study
The diagnosis conducted in the case study identified the central problem as a low Overall Equipment Effectiveness (OEE) in the filled cookie production line, with an initial level of only 57.93%, revealing a technical gap in relation to the target of 80%.

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 10Moderate risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described.2 / 2
Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events).2 / 2
How were loss data collected?Manual logs or maintenance records with unknown completeness.1 / 2
Are OEE, loading time and the loss categories defined explicitly?No definition; metrics are reported as bare numbers.0 / 2
Does the loss breakdown account for the total loss it claims to explain?The reported causes or categories sum to at least 90% of the stated total, or an explicit "other" class closes the balance.2 / 2
Is there evidence of selective reporting of favourable results?Intervention study in which baseline and post-intervention periods differ in length or method.1 / 2
Are the reported numbers internally consistent?Inconsistencies above 10 percentage points, or OEE factors above 100%.0 / 2
Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result.2 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
—
Show verbatim quote (Table 4)
Production Line Performance Rate % 77.74% 90% 86.14% 10.81%
nonePerformance77.7 %Both extractors agreed
—
Show verbatim quote (Table 4)
Defective Product Rate % 2.04% 1% 1.21% -40.69%
Process defects (scrap and rework)Defect rate2.04 %Both extractors agreed
—
Show verbatim quote (Table 4)
OEE % 57.93% 80% 75.67% 30.62%
noneOEE57.9 %Both extractors agreed
—
Show verbatim quote (Table 4)
Production Line Performance Rate % 77.74% 90% 86.14% 10.81%
nonePerformance86.1 %Both extractors agreed
—
Show verbatim quote (Table 4)
Defective Product Rate % 2.04% 1% 1.21% -40.69%
Process defects (scrap and rework)Defect rate1.21 %Both extractors agreed
Failure Downtime Rate
Show verbatim quote (Table 4)
Failure Downtime Rate % 23.53% 12% 13.86% -41.10%
Equipment failure (breakdowns)Share of lost time23.5 %Single extractor
production line stoppages
Show verbatim quote (Section 4.2 Initial Diagnosis)
The analysis revealed three main reasons contributing to this issue: production line stoppages accounted for 49.2% of the problem, followed by low operational performance with a contribution of 46.5%, and a smaller share of 4.3% attributed to defective products.
Equipment failure (breakdowns)Share of lost time49.2 %Single extractor
low operational performance
Show verbatim quote (Section 4.2 Initial Diagnosis)
The analysis revealed three main reasons contributing to this issue: production line stoppages accounted for 49.2% of the problem, followed by low operational performance with a contribution of 46.5%, and a smaller share of 4.3% attributed to defective products.
Reduced speedShare of lost time46.5 %Single extractor
defective products
Show verbatim quote (Section 4.2 Initial Diagnosis)
The analysis revealed three main reasons contributing to this issue: production line stoppages accounted for 49.2% of the problem, followed by low operational performance with a contribution of 46.5%, and a smaller share of 4.3% attributed to defective products.
Process defects (scrap and rework)Share of lost time4.30 %Single extractor
mechanical and electrical failures
Show verbatim quote (Section 4.2 Initial Diagnosis)
These reasons were linked to specific root causes: mechanical and electrical failures explained 30.2% of the stoppages, while instrumentation faults represented 19%.
Equipment failure (breakdowns)Share of lost time30.2 %Single extractor
instrumentation faults
Show verbatim quote (Section 4.2 Initial Diagnosis)
These reasons were linked to specific root causes: mechanical and electrical failures explained 30.2% of the stoppages, while instrumentation faults represented 19%.
Equipment failure (breakdowns)Share of lost time19.0 %Single extractor
improper adjustment of the sealing systemsealing system
Show verbatim quote (Section 4.2 Initial Diagnosis)
Additionally, 46.5% of the low performance was due to improper adjustment of the sealing system, and the presence of defective products was associated with wear on the magazine chain of the primary packaging machine, accounting for 4.3%.
Reduced speedShare of lost time46.5 %Single extractor
wear on the magazine chain of the primary packaging machineprimary packaging machine
Show verbatim quote (Section 4.2 Initial Diagnosis)
Additionally, 46.5% of the low performance was due to improper adjustment of the sealing system, and the presence of defective products was associated with wear on the magazine chain of the primary packaging machine, accounting for 4.3%.
Process defects (scrap and rework)Share of lost time4.30 %Single extractor
—
Show verbatim quote (Section 6 Conclusion)
The implementation yielded meaningful operational gains, including a 20.7% reduction in production line downtime and a notable improvement in OEE from 45.6% to 65.5%.
noneOEE45.6 %Single extractor
—
Show verbatim quote (Table 4)
OEE % 57.93% 80% 75.67% 30.62%
noneOEE75.7 %Single extractor
Failure Downtime Rate
Show verbatim quote (Table 4)
Failure Downtime Rate % 23.53% 12% 13.86% -41.10%
Equipment failure (breakdowns)Share of lost time13.9 %Single extractor
—
Show verbatim quote (Section 6 Conclusion)
The implementation yielded meaningful operational gains, including a 20.7% reduction in production line downtime and a notable improvement in OEE from 45.6% to 65.5%.
noneOEE65.5 %Single extractor
—
Show verbatim quote (Table 4, page 8)
Failure Downtime Rate % 23.53%
Equipment failure (breakdowns)Share of planned time23.5 %Single extractor
—
Show verbatim quote (Table 4, page 8)
Failure Downtime Rate % 13.86%
Equipment failure (breakdowns)Share of planned time13.9 %Single extractor

Observation units

  • Filled cookie production line · Whole line or unspecified equipment · Baseline
  • Filled cookie production line · Whole line or unspecified equipment · After intervention