Packaging material shortage (cans, bottles, crates, labels, crowns)
In short
It appears in fewer than 1 of every 100 lines studied.
When it appears, it takes on average about 56 % of the line's lost time. Reported by 0 of the 127 studies that could observe it (sparse evidence).
What happens
The line stops or must be held because required packaging components (cans, bottles, crates, labels, crown corks, etc.) are not available at the point of use when needed, due to upstream supply, procurement or logistics interruptions rather than any equipment malfunction. Production cannot continue since the process depends on the physical presence of these input materials at each station.
What is done about it
Improve supply planning and safety stock levels for critical packaging components, strengthen supplier reliability agreements and lead-time visibility, and implement real-time inventory tracking with early-warning alerts linked to production scheduling so shortages are anticipated before they halt the line.
Practical guidance written from engineering knowledge; it is not a statistical estimate.
1Probability and evidence
- Probability of presence
- 0.4% [0.1–1.0%]
- Expected share of lost time
- 0.2% [0.0–0.6%]
- Share of lost time when present
- 56% [45–67%]
- Studies / units
- 127 / 161
- Evidence grade
- D
Grade D: 0 or 1 study; the estimate is driven by partial pooling and priors, and the wide interval is the result.
2Probability by segment
- Dairy products0.4% [0.0–1.5%]13 studies
- Soft drinks, bottled water and juices0.4% [0.0–1.5%]26 studies
- Brewing, wine and spirits0.4% [0.0–1.6%]11 studies
- Bakery and pasta0.4% [0.0–1.4%]24 studies
- Meat, poultry and seafood0.4% [0.0–1.5%]9 studies
- Fruit and vegetable processing0.4% [0.0–1.6%]7 studies
- Grain and oilseed milling0.4% [0.0–1.6%]6 studies
- Sugar and confectionery0.4% [0.0–1.6%]9 studies
- Snacks, coffee, tea and other foods0.4% [0.0–1.5%]5 studies
- Animal feed and pet food0.4% [0.0–1.5%]7 studies
- Food manufacturing (unspecified or mixed)0.4% [0.0–1.6%]10 studies
3Mechanism, SCADA signature and countermeasure
Mechanism
Engineering guidanceThe line stops or must be held because required packaging components (cans, bottles, crates, labels, crown corks, etc.) are not available at the point of use when needed, due to upstream supply, procurement or logistics interruptions rather than any equipment malfunction. Production cannot continue since the process depends on the physical presence of these input materials at each station.
How it looks in SCADA data
Engineering guidanceSCADA/MES logs show line or station idle state with no equipment fault code active, often correlated with low or zero inventory counts at infeed buffers or magazines; upstream stations may show starvation while downstream stations remain in waiting state. Stop duration tends to be long and irregular, not matching typical mechanical jam or fault patterns.
Countermeasure
Engineering guidanceImprove supply planning and safety stock levels for critical packaging components, strengthen supplier reliability agreements and lead-time visibility, and implement real-time inventory tracking with early-warning alerts linked to production scheduling so shortages are anticipated before they halt the line.
4Sources
- Reduction of Machine Breakdown in the Brewery Manufacturing Company, A Case Study of Brewery “A” in the Eastern Nigeria (2023)Open sourceLost time: 175 min · as reported: “Materials (CAN, bottle, crate, label, crown cork etc)”
Show verbatim quote
Materials (CAN, bottle, crate, label, crown cork etc) 175 277 180 21 115 228 217 101 156 108 138 115
- Reduction of Machine Breakdown in the Brewery Manufacturing Company, A Case Study of Brewery “A” in the Eastern Nigeria (2023)Open sourceLost time: 277 min · as reported: “Materials (CAN, bottle, crate, label, crown cork etc)”
Show verbatim quote
Materials (CAN, bottle, crate, label, crown cork etc) 175 277 180 21 115 228 217 101 156 108 138 115
- Reduction of Machine Breakdown in the Brewery Manufacturing Company, A Case Study of Brewery “A” in the Eastern Nigeria (2023)Open sourceLost time: 180 min · as reported: “Materials (CAN, bottle, crate, label, crown cork etc)”
Show verbatim quote
Materials (CAN, bottle, crate, label, crown cork etc) 175 277 180 21 115 228 217 101 156 108 138 115
- Reduction of Machine Breakdown in the Brewery Manufacturing Company, A Case Study of Brewery “A” in the Eastern Nigeria (2023)Open sourceLost time: 21.0 min · as reported: “Materials (CAN, bottle, crate, label, crown cork etc)”
Show verbatim quote
Materials (CAN, bottle, crate, label, crown cork etc) 175 277 180 21 115 228 217 101 156 108 138 115
- Reduction of Machine Breakdown in the Brewery Manufacturing Company, A Case Study of Brewery “A” in the Eastern Nigeria (2023)Open sourceLost time: 115 min · as reported: “Materials (CAN, bottle, crate, label, crown cork etc)”
Show verbatim quote
Materials (CAN, bottle, crate, label, crown cork etc) 175 277 180 21 115 228 217 101 156 108 138 115
- Reduction of Machine Breakdown in the Brewery Manufacturing Company, A Case Study of Brewery “A” in the Eastern Nigeria (2023)Open sourceLost time: 228 min · as reported: “Materials (CAN, bottle, crate, label, crown cork etc)”
Show verbatim quote
Materials (CAN, bottle, crate, label, crown cork etc) 175 277 180 21 115 228 217 101 156 108 138 115
- Reduction of Machine Breakdown in the Brewery Manufacturing Company, A Case Study of Brewery “A” in the Eastern Nigeria (2023)Open sourceLost time: 217 min · as reported: “Materials (CAN, bottle, crate, label, crown cork etc)”
Show verbatim quote
Materials (CAN, bottle, crate, label, crown cork etc) 175 277 180 21 115 228 217 101 156 108 138 115
- Reduction of Machine Breakdown in the Brewery Manufacturing Company, A Case Study of Brewery “A” in the Eastern Nigeria (2023)Open sourceLost time: 101 min · as reported: “Materials (CAN, bottle, crate, label, crown cork etc)”
Show verbatim quote
Materials (CAN, bottle, crate, label, crown cork etc) 175 277 180 21 115 228 217 101 156 108 138 115
- Reduction of Machine Breakdown in the Brewery Manufacturing Company, A Case Study of Brewery “A” in the Eastern Nigeria (2023)Open sourceLost time: 156 min · as reported: “Materials (CAN, bottle, crate, label, crown cork etc)”
Show verbatim quote
Materials (CAN, bottle, crate, label, crown cork etc) 175 277 180 21 115 228 217 101 156 108 138 115
- Reduction of Machine Breakdown in the Brewery Manufacturing Company, A Case Study of Brewery “A” in the Eastern Nigeria (2023)Open sourceLost time: 108 min · as reported: “Materials (CAN, bottle, crate, label, crown cork etc)”
Show verbatim quote
Materials (CAN, bottle, crate, label, crown cork etc) 175 277 180 21 115 228 217 101 156 108 138 115
- Reduction of Machine Breakdown in the Brewery Manufacturing Company, A Case Study of Brewery “A” in the Eastern Nigeria (2023)Open sourceLost time: 138 min · as reported: “Materials (CAN, bottle, crate, label, crown cork etc)”
Show verbatim quote
Materials (CAN, bottle, crate, label, crown cork etc) 175 277 180 21 115 228 217 101 156 108 138 115
- Share of lost time: 10.1 % · as reported: “Material availability”
Show verbatim quote
Material availability 10.12% 12.16% 3.19%
- Share of lost time: 3.19 % · as reported: “Material availability”
Show verbatim quote
Material availability 10.12% 12.16% 3.19%